You are on page 1of 6

Construction of Combined warehouse at NIH Chak Shehzad, Islamabad.

MAIN SUMMARY OF STEEL


Weight
Sr. No. Description Unit Remarks
G-40 G-60

1 Footings Kg 95,688.920

2 Dowel Steel of Columns Kg 43,907.000 17,542.800

Total Weight 43,907.000 113,231.720


Construction of Combined warehouse at NIH Chak Shehzad, Islamabad.

MAIN SUMMARY OF STEEL

Weight
Sr. No. Description Unit Remarks
G-40 G-60

3 MS Stair(Footings+Columns) Kg 85.68 478.23

Total Weight 85.680 478.230


Construction of Combined warehouse at NIH Chak Shehzad, Islamabad.

MAIN SUMMARY OF STEEL


Weight
Sr. No. Description Unit Remarks
G-40 G-60

2 Column Stem upto 2nd Lap Kg 12,824.500 35,374.670

Total Weight 12,824.500 35,374.670


Construction of Combined warehouse at NIH Chak Shehzad, Islamabad.

MAIN SUMMARY OF STEEL


Weight
Sr. No. Description Unit Remarks
G-40 G-60

1 Plinth Beams (1st Joint) Kg 2,684.68 7,004.56

2 Plinth Beams (2nd Joint) Kg 2,845.12 7,649.02

3 Plinth Beams (3rd Joint) Kg 2,570.91 6,914.19

4
Plinth Beams (4th Joint) kg 1,384.99 6,167.16

Total Weight 9,485.700 27,734.930

Prepared By:_____________________ Checked By:___________________


Construction of Combined warehouse at NIH Chak Shehzad, Islamabad.

MAIN SUMMARY OF STEEL


Weight
Sr. No. Description Unit
G-40 G-60

1 Columns upto 24'-6" (1st Joint) Kg 4,244.58 18,323.78

2 Columns upto 24'-6" (2nd Joint) Kg 4,244.59 18,323.78

3 Columns upto 24'-6" (3rd Joint) Kg 3,619.16 16,547.80

4
Columns upto 24'-6" (4th Joint) kg 3,493.00 15,612.93

5
Floor Beam kg 666.57 2,406.42

Total Weight 16,267.900 71,214.710

Prepared By:_____________________ Checked By:___________________