Orientation to staffs and others workers. We are introduced to the engineers, staffs and
workers that we will be working with on site
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We are unable to submit the requirements for the orientation, so we continue to get
requirements needed.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Observing at the manufacturing plant, adjustment of the sizes needed for the wood
lamination.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Orientation to the safety discussing the do’s and dont’s in the safety of site and what are
the things needed to know when in the site
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Attending the toolbox meeting of MRS to introduce ourself to the worker. Measuring
the elevation in the to start the tiles work and measuring the architrave from floor 18 th to 33th
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Create the AUTOCAD of architrave that we measure on May 22 and rechecking the
measure of architrave
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We measured the dimension of wall to wall, after that we adjusted the wall distance of
the Architrave Autocad design that we made.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We went to 27th-14th floor for observation. And Sir Alger asked us to finish the assigned
Autocad design to us.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Measuring the hallway from top to bottom to check if it has clearance of 150cm.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We are assigned to double check the measurement made in 14th and 12th hours.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We are assigned to measure the shadow lines from 12th floor to 15th floor.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We are assigned to measure shadow lines on 16th floor and then we estimated the
materials needed in arms office in located in lower ground.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We are able to Finish the estimates given to us on june 14 and the we checked it on
lower ground floor.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We measure the tile distances and took photos of it from 6th to 8th floor.
Picture/s:
REPUBLIC OF THE PHILIPPINES
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
SANTA MARIA, BULACAN CAMPUS
We assigned to make a design of the tiles that we measured on june 17 and then a
walkthrough from 32nd floor down to 2nd floor.
Picture/s:
a