VISAKH REFINERY

FORMAT OF INSPECTION WORK LIST


TECHNICAL DEPARTMENT Doc. No. OCP/TSD/FR/305/Rev.2
Rev. Date : 16-Jan-02
(Ref. Pro.:OCP/TSD/PR/204)
Page 1 of 1

WORK LIST No. : 18-1827416 IWL.DESC.: NHT : T&I-2019- IWL for piping loop # 03 Date:
LOCATION : NHT_PIPING LOC.DESC.: NHT Unit piping INSP. BY: B M JEELANI
Equipment : REF:
Visual inspection and thickness gauging of Loop No # 03 NHT (72-P-01A/B suction
valve to 72-P-1A/B Pump) was carried out. The following are the observations and
recommendations.
Sl No. LOCATION/ITEM OBSERVATION RECOMMENDATION

10 Loop No # 03 NHT (72-P-01A/B Visual Inspection of Piping loop was carried out. General condition of Offer hydro test of the line @ 91.2
suction valve to 72-P-1A/B Pump) pipeline was found satisfactory. Kg/Cm.Sq.

____________________________
HEAD-INSPECTION