RFT CHECK SHEET

Project :
Purchase Order No. :

VENDOR/SUPPLIER :

Item No. / Tag No. :

Attention
Check Yes No N/A
area
Cleanliness 1. Prior to assembly all the components have been
cleaned / washed with acetone or suitable
solvents.
2. No weld spatters on welded parts.
Tightness 1. Valves have been subjected to body & seat
tightness tests as per approved datasheets/
pressure test procedures.
2. Vents & drains have been properly plugged
(welded if specified and NDE carried out).

Preservation 1. Assembled valve ends have been protected with


close fit end caps and stored in clean & tidy
place on pallets
2. End caps have been inserted back after hydro /
pneumatic/FE/LT.
Comments / Observations: