Professional Documents
Culture Documents
Construction of Lower Structure
Construction of Lower Structure
In order to link xxxxxx, a sea bridge with a total length of 7.5 km is required to be built. The plan is to
construct a concrete bridge which comprises causeways, approach bridges and cable stayed bridges
(as the main bridge). The plan is illustrated in Fig 1.1 below
1.1.Technical Specifications