1 GENERAL ASSUMPTIONS

In order to link xxxxxx, a sea bridge with a total length of 7.5 km is required to be built. The plan is to
construct a concrete bridge which comprises causeways, approach bridges and cable stayed bridges
(as the main bridge). The plan is illustrated in Fig 1.1 below

Causeway Approach Main Bridge Approach Causeway


2500 m 672 m 818 m 672 m 2838 m

Total length 7500 m

Fig 1.1 Plan of the Sea Bridge

1.1.Technical Specifications

In general, the bridge will have the followings:

No. Description Design


1. Overall length of the bridge 7,500 m
2. Width of the bridge 2 x 15.0 m
3. Travel Lane 2 x 2 x 3.5 m
4. Emergency Lane 2 x 2.25 m
5. Motorcycle Lane 2 x 2.75 m
6. Minimum grade 3%
7. Length of the main bridge 818 m
8. Length of the causeway (to Johor) 2,500 m
9. Length of the causeway (to Riau) 2,838 m
10. Length of the approach bridge (to Johor) 672 m
11. Length of the approach bridge (to Riau) 672 m
12. Length of the main bridge 818 m