Professional Documents
Culture Documents
YES
NO
Approved?
Ops Shift Leader:
Generates and fills
the Tag Out Labels,
PREPARATION
Operations or Plant
Manager:
Reviews the Isolation
Other teams Certificate, and checks if
working in the special Removal
NO
system? Instructions or
Management physical
presence is required (if
any) then signs the IC at
YES
the bottom
The isolation
remains on place
until the last
Responsible for
Work requests
isolation removal.
PREPARATION
Shift Leader:
generates the
NO Approved
Isolation Removal
Instructions
Responsible for
Shift Operator:
Work:
Removes his/her
Removes his/her
YES padlock from the YES
padlock from the
Control Room Lock
Control Room Lock
Box
Box
system/ equipment, and put their initials after the conclusion of every Before energizing any
step in the IC. equipment, Operation must
verify that all portable earths
have been removed and are
Shift Operator: Shift Leader: properly stored in Control
Indicates by radio the Notes the time of every Room.
conclusion of every step step in the cross checklist
to the Shift Leader and signs at the botton
Shift Leader:
Shift Operator + Respons. for work:
Updates the Active
Signs the IC and the Isolation Logbook as a proof that the Isolation
Isolation
Removal is done
Whiteboard
Informs to his/her
teammates that it is no logbook are properly filled, signs
longer safe to work on the IC at the bottom and writes
the equipment it in the Handover Operation
Logbook