FOUNDATION NOTES:
1A 1B 1C 1D 1E 1F 1G 1H 1J 1K 1L
• Contractor to verify all dimensions on site before
58160
commencing any work.
2705 6580 6580 6580 6580 6580 7285 6580 6580 2110
H25 starters H25 starters 240 H25 starters • Refer to Architect's drawings for all nibs, holes,
4180 12 equal spaces 240 4180 12 equal spaces 4315 15 equal spaces 270 rebates etc...
at 180 (2160) 7-H32 bars T&B, at 180 (2160) at 180 (2700)
1600 lap into typical Sim Sim • Contractor to determine positions of all building
foundation beam 1 2 600 3400 services i.e. sewer, stormwater, power, telephone
S1.12 S1.12
etc.. prior to commencing work.
660
660
660
200
200
200
200
200
200
200
200
1200w x 600d foundation beam
100
650 550
• Read this drawing in conjunction with the Structural
11 Specification
400
• All reinforcing to be continuous around corners.
150
150
150
150
150
150
150
150
2590
415
1600 3600 1600 1600 3600 4200 1600 • Minimum covers for foundation beam reinforcing is
75mm - when concrete is in contact with
12 ground
3260 3260 5900 50mm - when concrete is poured over DPM
7-H32 bars T&B,
1760
200 150
400
6580
27
S1.14 Foundation Beam Type 4
7-H32 bars T&B,
1600
2245
200 150
400
foundation beam
270
170
1505
areas where shear reinforcing spacings are
15 equal spaces
at 180 (2700)
14 21
S1.13 S1.13
areas where shear reinforcing spacings are
reduced to 100 crs. and additional reinforcing is
required, refer details
6580
400
10
2235 1000 1000 1920 1000 635 8 1000 815 1960 1000
660
1600
S1.12 26
3610
S1.12
2660
S1.14
2500
575
2100 1100 1600
1200w x 600d foundation beam
325
1200
14 29
600 600
600 600
600 600
1350
S1.14
200 150
625
600 1200 3540 600
3425
16
Sim
400
1200w x 600d foundation beam
200 S1.13 21
2375
7-H25 bars T&B, S1.13
1675 1000 665 3235 3920 635
3800 long
6580
38435
1000 1730
17
1200
1200
S1.13
1200
15 20 630
1525
2600
S1.13 S1.13
400
1200
2575
935
2625
580
15
1275
600 600 1175
11
1000w x 600d foundation beam 13
995
1395
S1.12 12
200 150 S1.12
2240
600 600
600 600
S1.12
5
1200
S1.12
1200
1000w x 600d foundation beam 1200w x 600d foundation beam
600
1200w x 600d foundation beam
6580
1000
555 500
400
over this area
2910
1000w x 600d foundation beam
1600
23
1170
1000x1000 deep services trench 150 200
1650
S1.13
1000
270
16
145
335
400
22
200 150
15 equal spaces
7 top of foundation
at 180 (2700)
S1.13
Sim
S1.12 2
4200
S1.12
6580
Sim
1 H25 Panel Starter Debonding Detail
S1.12
660 1 : 20
1600
3610
400 3740 3860 400 400 1080 2290 400 400 3175 4245 400
650 550
150
150
150
150
150
150
150
150
150
1200w x 600d
foundation beam
550 650
18
top of foundation
200
200
200
200
200
200
200
200
200
660
1200w x 600d foundation beam
660
660
1 2 3 4
S1.12 S1.12 S1.12 S1.12
7-H32 bars T&B,
H25 starters 1600 lap into typical H25 starters H25 starters
1670 12 equal spaces 2750 foundation beam 950 15 equal spaces 3635 2190 12 equal spaces 2230
at 180 (2160) at 180 (2700) at 180 (2160) H20 Panel Starter Debonding Detail
1 : 20
Foundation Plan
1 : 100
1A 1B 1C 1D 1E 1F 1G 1H 1J 1K 1L
58160
2705 6580 6580 6580 6580 6580 7285 6580 6580 2110
11
430 835
200 precast panel 200 precast panel 200 precast panel
20
CH
0U
75 75
2590
CH
50mm slab setdown,
6.4
C4
x5 x5
6.4
x
.0S .0S
6
2105 confirm setout with
9.1
x
9.1
HS HS
21
Architect's Drawings
21
12
21
9.1
x
6.4
CH
S
19
20
Slab Construction:
0U
S1.13
21
C4
9.1
150 thick concrete slab with SE82 mesh
6580
6
x
6.4
central, on DPM, on 20mm sand blinding
CH
on 150 minimum compacted hardfill
S
HS 27
HS
.0S
.0S
S1.14
RL: 26.300
5
5
5x
5x
21
12
12
9.1
x
6.4
80
1330
1330
CH
S
13
20
0U
21
C4
9.1
6
x
50mm slab setdown,
6.4
CH
confirm setout with
S
200 precast panel Architect's Drawings
21
12
9.1
5
x
x5
6580
6.4
.0S
CH
HS
20
26
0U
8 10
21
C4
9.1
S1.14
2620
S1.12 S1.12
6
x
6.4
HS
CH
.0S
S
6
0x
20
14
21
9.1
x
6.4
2120
2120
CH
S
80 16
20
S1.13
0U
21
C4
9.1
12
12
6
5
x
6.4
x5
x5
6580
.0S
.0S
38435
CH
HS
HS
S
17
S1.13
21
9.1
x
6.4
CH
S
20
15
0U
21
11
C4
9.1
13
6
x
S1.12 12
6.4
1620
S1.12
CH
S1.12
S
15
0
x6
.0S
HS
HS
6580
.0S
6 9
5
12
5x
S1.12 S1.12
12
5
20
x5
1000x1000 deep
0U
.0S
C4
HS
services trench,
6
refer S1.13 2115 3710 1965 3710 1610
HS
HS
735 1000
23 170
.0S
.0S
1850
S1.13
5
5x
5x
12
12
645
620
620
620
620
12
89
89
89
89
5
16
x5
x5
x5
x5
x5
.0S
.0S
.0S
.0S
.0S
22
HS
HS
HS
HS
HS
1830
S1.13 7
S1.12
650 7145 1490
200 precast panel
685
S
89 89
SH SH
x5 x5
5.0 x5.0
.0S .0S
1280 2490
S
HS HS
89
6580
x
89
HS
HS
HS
HS
HS
HS
.0S
.0S
.0S
.0S
.0S
.0S
5
5
HS
HS
HS
HS
HS
HS
5x
5x
5x
5x
5x
5x
12
12
12
12
12
12
.0S
.0S
.0S
.0S
.0S
.0S
5
5
5x
5x
5x
5x
5x
5x
12
12
12
12
12
12
17
extent of OR pendant structure shown dashed, refer S4.21 for setout extent of OR pendant structure shown dashed, refer S4.21 for setout
50mm slab setdown,
2945
1 2 3 4
S1.12 S1.12 S1.12 S1.12
18 18 18 18 15
10
170
H12
H12
H12
H12
H12
Ground Floor Ground Floor
26300 26300
150
150
150
150
150
225
225
225
225
225
5-H25 7-H32 7-H32 7-H32 DPM 5-H16
600
600
600
600
600
prs. R12 stirrups sets R12 stirrups prs. R12 stirrups prs. R12 stirrups
at 200 & links at 100 at 200 at 200
50
50 50
550 DPM 550 DPM 550 DPM 550 DPM 65
1200 1200 1200 1200 1000
Foundation Type 1 Foundation Type 3
16 14 14
H12
H12
H12
H12
H12
H12
H12
150 min. embedment
Ground Floor Ground Floor
26300 26300
150
150
150
150
150
225
225
225
225
225
5-H25 5-H16 DPM 5-H25 DPM 5-H25 5-H25
DPM DPM DPM
600
600
600
600
600
prs. R10 stirrups prs. R10 stirrups at 200 prs. R10 stirrups prs. R10 stirrups prs. R10 stirrups
at 200 at 200 at 200 at 200
5-H25 5-H16 5-H25 5-H25 5-H25
625 625
1200 1200 1200 1200
Foundation Type 2 Foundation Type 2 Foundation Type 2
1A 1C
500x330 precast 25 Series blockwall 25 Series blockwall 25 Series blockwall 25 Series blockwall 25 Series blockwall
column
blockwall starters, blockwall starters, blockwall starters, blockwall starters, blockwall starters,
H20 starters, refer S2 Series for refer S2 Series for refer S2 Series for refer S2 Series for refer S2 Series for
refer Foundation Blockwall Elevations mesh Blockwall Elevations Blockwall Elevations Blockwall Elevations Blockwall Elevations
mesh
Plan for setout
H12 at 400 H16 U-bars at 150 T&B mesh H12 at 400 H12 at 400 H16 U-bars at 150 T&B mesh H12 at 400
H12
H12
H12
H12
H12
mesh
Ground Floor refer Detail 1 this Ground Floor
26300 page for concrete 26300
150
150
150
225
upstand reinforcing
prs. R12 stirrups refer Detail 14/S1.13 refer Detail 14/S1.13 refer Detail 14/S1.13 for reinforcing
at 100 for reinforcing for reinforcing for reinforcing
5-H25 14-H25 14-H25
665
DPM 650
Foundation Type 6 6-H25 T&B Foundation Type 6 Foundation Type 6 6-H25 T&B Foundation Type 6
1200 3900 3920
1H 16
H12
H12
H12
H12
H12
H12
50
Ground Floor Ground Floor at 200 at 200 Ground Floor
26300 26300 26300
150
150
150
150
225
225
225
225
225
175
5-H25
300
DPM DPM
600
600
600
600
600
prs. R12 stirrups prs. R12 stirrups sets R12 stirrups sets R12 stirrups
1275
at 200 at 100 at 200 at 100 5-H20,
4-H25 14-H25 5-H25 5-H25 3700 long
1250 610
14 Section 15 Section 16 Section 17 Section
S1.01 1 : 20 S1.01 1 : 20 S1.01 1 : 20 S1.01 1 : 20 18 Section
S1.13 1 : 20
1H 1H 16
H12
H12
H12
70
H12
50
5
Ground Floor Ground Floor
26300 26300
150
150
150
150
150UC30
225
225
DPM 3-H16 7-H25 5-H25
DPM DPM 160x160x6MS endplate with
2-Ø19 holes 100mm apart for
precast trench
600
600
R10 stirrup sets R12 stirrups prs R10 stirrups Hilti HIT-V M16 rods, drill
& epoxy with Hilti HY-200,
1275
at 200 at 100 at 200
7-H25 5-H25 150 min. embedment
3-H16
DPM
200
22 Section
S1.01 1 : 20
1A 1B 16
18 22 24
S1.13 S1.13 S1.13
1000 735
525 6385 885
400
refer Detail 1 this 1368 812 148 1345 1345 1367
page for concrete 125
upstand reinforcing mesh mesh
125x27 deep recess 150UC30 150UC30 150UC30 150UC30 150UC30
H12
H12
H12
150
150
150
225
225
150
150
D12 at 400, drill &
5-H25 160x160x6MS endplate with D12 at 400, drill & 3-H16
epoxy with Hilti HY-200,
300
5-H20 2-Ø19 holes 100mm apart for epoxy with Hilti HY-200,
150 min. embedment,
Hilti HIT-V M16 rods, drill 150 min. embedment, precast trench R10 stirrup
600
lap 400 min.
& epoxy with Hilti HY-200, lap 400 min. at 200
1275
1275
prs. R12 stirrups at 150 150 min. embedment
D12 at 400, drill &
epoxy with Hilti HY-200, 3-H16
precast trench 150 min. embedment,
150
lap 400 min.
DPM
125
23 Section 24 Section
S1.01 1 : 20 S1.13 1 : 20
1J 1K 15
H12
H12
H12
H12
H16 U-bars at 150 T&B H12 at 400 mesh
Ground Floor Ground Floor
26300 26300
150
150
225
225
225
225
DPM 3-H16 DPM 3-H16
215
prs. R12 stirrups
600
600
600
R10 stirrup R10 stirrup at 100
at 200 at 200
3-H16 3-H16
5-H25 5-H25 T&B lap into sets R12 stirrups H25 T&B, refer 4-H25 T&B prs. R10 stirrups 5-H25 T&B
Foundation Type 2 at 200 Detail 12 / S1.12 at 200
200 200 500
prs R10 stirrups sets R12 stirrups sets R12 stirrups 5-H25 T&B, 2400 long, prs. R10 stirrups
at 200 at 200 at 100, refer plan lap 1250 with at 200
400 400 for setout Foundation Type 2
Foundation Type 5 Foundation Type 2 beyond Foundation Type 6 Foundation Type 2
1A 1B 1C 1D 1E 1F 1G 1H 1J 1K 1L 25 Series Blockwork
58160
P# 200 thick precast panels
2705 6580 6580 6580 6580 6580 7285 6580 6580 2110
8
C
C
11
P1 P2 P3
2590
C
23
12
P7
Blockwork Notes:
6580
305
95
21
95
95
are not control joints
14
790
CJ BW7 CJ BW8 CJ BW9 CJ BW10 CJ CJ CJ BW12
295
• if penetrations / openings are larger than what is called up then
150 BW11 CJ
confirmation is required from Structural Engineer prior to forming
1210
3 190 1960
3440
BW29
S2.11
BW30
BW23
BW25
BW27
4145
4145
BW32
430
13
6580
38435
S2.13
5000
9 10 11 12 14
S2.12 S2.12 S2.12 S2.12 S2.13
2310
CJ CJ CJ
BW34
1510
7
6400
1400
2365
1200
S2.12
1755
CJ
1125
925
555
3590
BW22
BW31
BW33
BW1 BW2
BW28
CJ CJ CJ
BW26
15
BW24
2640
4 430 15
1285
1
20
2120
1715
1765
BW6-S
S2.13
1875
C
S2.11
2115
2115
BW5
S2.11
6 8 CJ BW17
CJ
3435
2
1210
1625
390
S2.11
CJ BW4 CJ BW3 CJ 5590 2645 390 1610 2790 1210 4590 2410 2990 1210 2390 2110
6580
1255 1835
390
5
390 8850 45 3190 775 2135 3190 S2.12 3190 925 2120 1280 3190
120
C
25
19
525
525
525
525
C
16
3000
P8
6580
3460
C
24
18
C
17
2945
P4 P5 P6
18
C
11
14
15
C
C
9
10
12
13
16
17
1550 2400 2630 800 3000 3485 2070 2400 2110
C
1A 1B 1C 1C 1B 1A
4990 10 3990 10 285 285 10 3990 10 4590 10 390
2-D16 starters at 200 2-D12 starters at 200 2-D12 starters at 200 2-D12 starters at 200
Blockwork Notes:
Sim
317 317
S3.11 S3.11
• refer S2.32 for weldplates WP-# details
750
550
550
Level 1 Level 1 • all openings in blockwalls to be trimmed with H16 bars, ensure
224 minimum 800mm development length past openings or 90
30500 30500
S2.32 degree return be placed at end of horizontal
H12 at 400
H12 at 400
H12 at 400
208
S2.31
confirmation is required from Structural Engineer prior to forming
207
S2.31
construction joint
construction joint
construction joint
construction joint
construction joint
blockwork column
1 Section
S2.01 1 : 50 2 Section Note:
S2.01 1 : 50
BW11-S sits in a different
1D 1E 1F 1G 1H plane to the other walls in
this elevation
6400 10 6780 4390 6800 390 2810 390
3990
2-D16 starters at 200 2-D16 starters at 200 2-D16 starters at 200 2-D16 starters at 200 2-D12 starters at 200
2-D12 starters at 400
313 314 315 370
S3.11 311 316
S3.11 S3.11
S3.11
750
750
S3.11
550
WP-8 WP-8 WP-7
Level 1 Level 1
30500 30500
325
360UB44 360UB44
204 205
S2.31 S2.31 750
315
202
H16 at 400
206
H12 at 400
S2.31
H16 at 400
H12 at 400
S2.31
H16 at 400
H12 at 400
blockwork column
RB12 at 200 RB16 at 200 RB16 at 200 D16 at 200
Sim
blockwork column
BW7 BW8 BW9 BW10 BW11 BW12
215 coupler to 213
construction joint
2375
2375
2375
2375
212 3-RB16 RB16 coupler to
coupler to every every second
S2.31
starter bar starter bar
4-RB16 at 200
Ground Floor 2-RB20 EF Ground Floor
26300 26300
RB16 at 400 RB16 at 400 RB12 at 200 RB20 at 200 RB12 at 400
RB12 at 200
3 Section
S2.01 1 : 50
1H 1G 1F 1E 1D
750
550
550
WP-6 WP-6 WP-6 WP-7 WP-6
Level 1 Level 1
30500 30500
H12 at 400
H12 at 400
H12 at 400
S2.31 S2.31
H16 at 400
Sim
214
RB16 at 200
150x6.0SHS
BW13 BW14 S2.31 BW15 BW16 BW17
coupler to
blockwork column
2375
every second
starter bar 210
S2.31
coupler to
every second
starter bar
Ground Floor Ground Floor
26300 26300
RB12 at 200 RB16 at 400 RB16 at 400 RB16 at 200 RB12 at 400
4 Section
S2.01 1 : 50
1H 1G 1F 1E 1D
750
WP-7 WP-8 WP-8 WP-8 WP-8 WP-8 WP-8 WP-7
550
550
550
Level 1 Level 1
30500 30500
H12 at 400
H12 at 400
H12 at 400
H12 at 400
S2.31
214
89x5.0SHS
89x5.0SHS
89x5.0SHS
89x5.0SHS
BW18 BW19 BW20 BW21
S2.31
5 Section
S2.01 1 : 50
15 15 15 16 15 14
305 1465
2390 3190 10 145
2-D16 starters at 200 2-D16 starters at 200 2-D16 starters at 200 2-D16 starters at 200
302 Blockwork Notes:
309 302 S3.11
308 301 310
S3.11 S3.11 • refer S2.32 for weldplates WP-# details
S3.11 S3.11 S3.11
750
750
750
555
325
2-H16 WP-8 WP-7 WP-7 WP-8 WP-8 • all openings in blockwalls to be trimmed with H16 bars, ensure
Level 1 Level 1 minimum 800mm development length past openings or 90
30500
224 30500
S2.32 degree return be placed at end of horizontal
200UB22 200UB22 200UB22
• all horizontal reinforcing to have returns at corners / ends that
10 are not control joints
H12 at 400
H16 at 400
H16 at 400
555 1390
• if penetrations / openings are larger than what is called up then
208 confirmation is required from Structural Engineer prior to forming
H16 at 400
S2.31
blockwork column 4-D12 starters Sim Sim
207 6-RB20 at 200 214 215
450
construction joint
coupler to every every second
starter bar BW5
construction joint
H12 at 400
starter bar
construction joint
2125
BW34
4-RB20 at 200
15 14 15 14 15 14
3990 10 4190 10 145 1715 2275 10 2390 1210 695 95 1865 2425 10 3990 10
145
2-D16 starters at 200 2-D16 starters at 200 2-D16 starters at 200 2-D12 starters at 200 2-D16 starters at 200 2-D16 starters at 200
320 303
S3.11 S3.11
750
750
550
WP-7 far face WP-8
Level 1 Level 1
30500 30500
200UB22
S2.31
H16 at 400
H16 at 400
H16 at 400
S2.31
H12 at 400
H16 at 400
Sim Sim
215 214
S2.31 S2.31
construction joint
construction joint
blockwork column
coupler to every BW24 BW25 BW26 BW27 4-RB16 at 200 BW28 coupler to BW29
RB20 starter bar every RB20
construction joint
construction joint
construction joint
construction joint
construction joint
coupler to starter bar
coupler to every second
coupler to every
every second starter bar
second starter bar 210 212
starter bar S2.31 S2.31
RB16 at 200 RB16 at 200 RB16 at 200 RB16 at 200 RB16 at 200 RB16 at 200
14 15 14 14 15 16
3990 10 145 10 1865 925 3590 10 545 1125 1865 10
Blockwork Notes:
2-D16 starters at 400 2-D16 starters at 400 2-D16 starters at 200 2-D16 starters at 400
306 • refer S2.32 for weldplates WP-# details
S3.11
312 304 • all openings in blockwalls to be trimmed with H16 bars, ensure
S3.11 S3.11
750
minimum 800mm development length past openings or 90
WP-8 WP-8 WP-7 WP-8 WP-7 WP-7
Level 1 Level 1 degree return be placed at end of horizontal
30500 30500
• all horizontal reinforcing to have returns at corners / ends that
200UB22 200UB22 200UB22 201 are not control joints
410UB53
S2.31
• if penetrations / openings are larger than what is called up then
H12 at 400
confirmation is required from Structural Engineer prior to forming
206
H12 at 400
H16 at 400
H12 at 400
S2.31
Sim Sim
214 215
coupler to coupler to coupler to
S2.31 S2.31
BW30 every second BW31 BW32 every second every second BW33
213
blockwork column
starter bar coupler to starter bar starter bar
construction joint
construction joint
construction joint
coupler to construction joint 203 S2.31
every RB20
every RB20 S2.31
200x6.0SHS
starter bar
starter bar
1D 1G 1H
Precast Elements Notes:
2400 2400 3000 2400 • concrete to contain the following:
- 40MPa concrete mix (19mm max.
aggregate size) for precast walls
- 30MPa concrete mix (19mm max.
aggregatesize) for precast columns
361
unless specified otherwise
451
208
• all panel elevations viewed from numbered side
Sim Sim
226
7982
7937
225
7847
S2.32 S2.32
6268
Ø60 ID steel ribbed ducts, Ø60 ID steel ribbed ducts, Ø60 ID steel ribbed ducts, Ø60 ID steel ribbed ducts,
1350 long, with grout 1350 long, with grout 1350 long, with grout 1350 long, with grout
tubes top & bottom tubes top & bottom tubes top & bottom tubes top & bottom
Sim Sim
227 228
S2.32 S2.32
205
205
205
205
Ground Floor Ground Floor
26300 26300
** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 250 EF HORIZONTAL ** ** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 250 EF HORIZONTAL ** ** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 300 EF HORIZONTAL ** ** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 250 EF HORIZONTAL **
13 16
3000 3000
3000
2400
260
208
260
260
226 225
S2.32 S2.32
6790
6047
5966
5721
sets R6 stirrups & links at 100
Ø60 ID steel ribbed ducts, Ø60 ID steel ribbed ducts, Ø60 ID steel ribbed ducts, Ø60 ID steel ribbed ducts,
1350 long, with grout 1350 long, with grout 1350 long, with grout 1350 long, with grout
tubes top & bottom tubes top & bottom tubes top & bottom tubes top & bottom
227
228 S2.32
S2.32
205
205
205
205
** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 300 EF HORIZONTAL ** ** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 250 EF HORIZONTAL ** ** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 300 EF HORIZONTAL ** ** PRIMARY REINFORCEMENT IS: H16 AT 180 EF VERTICAL & H12 AT 300 EF HORIZONTAL **
295
110
325
500 A • minimum strength at time of lift to be 20MPa
265
S2.21 WP-4 unless specified otherwise
110 WP-2
500 A • all panel elevations viewed from numbered side
265
S2.21 WP-4
500 WP-2 • panel weights calculated at 2.5t/m³
A 110
265
S2.21 WP-4
110 • refer S2.32 for weldplates WP-# details
500 WP-2 H12 EF
265
A A Section WP-4
S2.21 S2.21 1 : 20
3770
110 WP-2
3200
265
WP-4
2630
WP-2
2060
265
WP-4
1490
WP-2
920
8315
WP-1 WP-1 WP-1 WP-1 WP-1 WP-1
7745
7175
6605
reinforce similar to reinforce similar to reinforce similar to reinforce similar to reinforce similar to
column C5 U.N.O column C5 U.N.O column C5 U.N.O column C5 U.N.O column C5 U.N.O
4280
4280
4280
4280
4280
4280
3-H20 EF
2-Ø60 ID steel ribbed
2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed ducts, 1150 long, with 2-Ø60 ID steel ribbed
ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with grout tubes top & bottom ducts, 1150 long, with
grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom
205
205
205
205
205
205
Ground Floor Ground Floor
26300 26300
150 150 150 150 150 150 150 150 150 150 150 150
200 200 200 200 200 200
Precast Column C1 Elevation Precast Column C2 Elevation Precast Column C3 Elevation Precast Column C4 Elevation Precast Column C5 Elevation Precast Column C6 Elevation
1 : 50 1 : 50 1 : 50 1 : 50 1 : 50 1 : 50
330
WP-5
280
330
11 11 18 18 18 A 18 18
500
S2.21 500
A
B 500 110 S2.21
B 110
500 S2.21
S2.21 110
265
110 WP-4
500 WP-4
235
235
265
S2.21 1 : 20 S2.21
S2.21 S2.32
WP-5 WP-5
110 110
WP-2 WP-2
221
500
235
235
B S2.32
H12 EF
S2.21 110
WP-5 WP-5
WP-2
3780
WP-2 WP-2
3210
3160
3130
235
WP-5
2170
2140
WP-2
1150
WP-1
222
8325
WP-1 WP-1 WP-1 WP-1 WP-1 WP-1 S2.32
7755
7675
7645
6685
6655
reinforce similar to reinforce similar to reinforce similar to reinforce similar to reinforce similar to reinforce similar to
column C5 U.N.O column C5 U.N.O column C13 U.N.O column C13 U.N.O column C13 U.N.O column C13 U.N.O
4280
4280
4280
4280
4280
4280
4280
3-H20 EF
2-Ø60 ID steel ribbed
2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed ducts, 1150 long, with
ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with grout tubes top & bottom
grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom
1150
223
205
205
205
205
205
205
205
150 150 150 150 150 150 150 150 150 150 150 150 150 150
200 200 200 200 200 200
200
Precast Column C7 Elevation Precast Column C8 Elevation Precast Column C9 Elevation Precast Column C10 Elevation Precast Column C11 Elevation Precast Column C12 Elevation Precast Column C13 Elevation
1 : 50 1 : 50 1 : 50 1 : 50 1 : 50 1 : 50 1 : 50
DRAWING TO BE PRINTED IN COLOUR
280
330
aggregatesize) for precast columns
500
A • minimum strength at time of lift to be 20MPa
110
S2.21 unless specified otherwise
500
500 C • all panel elevations viewed from numbered side
A
S2.21 S2.22 110
110
• panel weights calculated at 2.5t/m³
A 500 C Section
265
WP-4 500 500 S2.22 1 : 20 • refer S2.32 for weldplates WP-# details
S2.21 C
WP-2 A
110 110 S2.22
310
S2.21
WP-5
265
WP-4 110
WP-3
WP-2
265
WP-4
2640
310
WP-2 WP-5
2100
2000
265
WP-4 WP-3
1430
WP-2
1110
860
WP-1 WP-1 WP-1 WP-1 WP-1 WP-1
7185
6690
6545
5975
5700
reinforce similar to reinforce similar to reinforce similar to reinforce similar to reinforce similar to reinforce similar to
5405
column C13 U.N.O column C13 U.N.O column C13 U.N.O column C13 U.N.O column C20 U.N.O column C20 U.N.O
4280
4280
4280
4280
4280
4280
2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed 2-Ø60 ID steel ribbed
ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with ducts, 1150 long, with
grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom grout tubes top & bottom
205
205
205
205
205
205
Ground Floor Ground Floor
26300 26300
150 150 150 150 150 150 150 150 150 150 150 150
200 200 200 200 200 200
Precast Column C14 Elevation Precast Column C15 Elevation Precast Column C16 Elevation Precast Column C17 Elevation Precast Column C18 Elevation Precast Column C19 Elevation
1 : 50 1 : 50 1 : 50 1 : 50 1 : 50 1 : 50
330
1A 1A 1A 1L 1L
1A WP-4
295
325
D
500
S2.22
110 D 500
S2.22
110 D 500
S2.22 500 D
500
345
WP-4 S2.22
D Section
S2.22 1 : 20 110 D 500 110
WP-3 S2.22 D
345
WP-4 S2.22
110 110
WP-3
H12 EF
345
345
WP-4 WP-4
2455
WP-3 WP-3
345
1970
345
WP-4 WP-4
1430
1400
860
830
224
240
6595
R10 stirrups at 200
6055
6025
5485
5455
4280
4280
4280
4280
4125
3-H20 EF 3-H20 EF
1150
205
205
205
205
205
205
150 150 150 150 150 150 150 150 150 150 150 150
200 200 200 200 200 200
Precast Column C20 Elevation Precast Column C21 Elevation Precast Column C22 Elevation Precast Column C23 Elevation Precast Column C24 Elevation Precast Column C25 Elevation
1 : 50 1 : 50 1 : 50 1 : 50 1 : 50 1 : 50
2-D20
2-D20
RB16
RB16
RB16
RB16 at 200 RB12 at 400 RB12 at 200 H12 at 400
R10 stirrups at 200
blockwork provide additional bar 25 series blockwork weldplate WP-7
95
95
95
when vertical reinforcing 14 14 14 refer Blockwork
14 RB12
14 2-RB20
RB16
is at 400 crs. Elevations for
RB16 reinforcing RB12
10
2-RB20
10
RB12 at 200 R10 links at 200 H16 at 400 H12 at 400 R10 stirrups at 200
695
10
refer Blockwork weldplate WP-6 & WP-8 RB16 construction joint, refer Blockwork
Elevations for refer Blockwork seal with 60FFR Elevations for construction joint,
H16 at 400 construction joint,
reinforcing Elevations for sealant reinforcing seal with 60FFR
RB16 seal with 60FFR refer Blockwork Elevations
reinforcing sealant
sealant for reinforcing
200 Section 201 Section 202 Section 203 Section 204 Section 205 Section 206 Section
S2.11 1 : 20 S2.12 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20
1A 1C
2-D20
2-D20
RB16
200
RB16 reinforcing
reinforcing
R10 stirrup & link construction joint, R10 stirrups at 200
R10 links at 200
at 200 construction joint,
95
95
95
2-RB20 RB16 seal with 60FFR
seal with 60FFR 14 14 14 2-RB20
10
sealant
10
390
390
refer Blockwork RB16
sealant
305
RB16 R10 stirrups at 200 Elevations for
2-RB20 R10 links RB16
2-RB20 2-RB20 R10 stirrups at 200 reinforcing R10 stirrups at 200 2-RB20
at 200
695
10
construction joint, refer Blockwork refer Blockwork construction joint, 2-RB20 2-RB20 RB16
seal with 60FFR 10 Elevations for Elevations for 10 seal with 60FFR construction joint,
sealant reinforcing reinforcing sealant seal with 60FFR RB16
H16 at 400 RB16 at 200 sealant
200
207 Section 208 Section 209 Section 210 Section 211 Section 212 Section 213 Section
S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20
RB coupler, refer
blockwork elevations
for size and setout
18
110 390 2400 3000
WP-4 or 40 40
WP-5 35 min. sets R6 stirrups H12 EF at 250 35 min. 40 H16 EF at 180 sets R6 stirrups 40
55
& links at 100 & links at 100
WP-2 or WP-3 casting face casting face
=
330
1F
200
200
=
35 min.
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
35 min.
R10 stirrups H16 EF at 180 H12 EF at 300
2-H12
2-H20
2-H20
at 200
2400 3000
18
500
H16 EF at 180 steel ribbed duct with sets R6 stirrups
40 40 35 min. sets R6 stirrups R6 (galv.) links to H12 EF at 250 35 min. 40 grout tubes top & bottom, & links at 100 40
& links at 100 each side of duct refer elevation for setout
55
200
200
330
1F
=
35 min.
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
2-H20
35 min.
H16 EF at 180 steel ribbed duct with R6 (galv.) links to H12 EF at 300
R10 stirrups at 200
grout tubes top & bottom, each side of duct
2-H20
2-H12
2-H20
2-H20
18
500
40 40
55
WP-1
=
330
1F
=
R10 stirrups
2-H20
2-H20
2-H20
at 200
222 Section
S2.21 1 : 20
18 1A
500 500
150 200 150
40 steel ribbed duct with 2-RB16 U-bars 4-RBA16CS couplers
50
55
330
230
1F 15
40
=
2-H20
2-H20
2-H20
2-H20
2-H20
at 200 at 200
65
65
330
330
330
330
15
flats, 550 long with
25
300x200x12MS plate
135º return 2-310x50x6MS flat 2-310x50x6MS flat
150
150
50x6MS folded flat,
52
52
65
65
65
155
400x330x12MS plate 330x250x12MS plate shape as shown
2-50x6MS folded flat, 2-50x6MS folded flat,
25
15
Plan Plan Plan Plan Plan shape as shown Plan shape as shown Plan
50x6MS flat
Plan
4-50x6MS folded 2-50x6MS folded flats,
flats, 550 long with 440 long with 135º return 4-50x6MS folded 2-50x6MS folded flats, 100 100 350
135º return flats, 550 long with 440 long with 135º return
50
10 10
50
135º return
25
25
50
50
75
75
125
250
150
150
400
300
300
2-50x6MS folded
150
150
400
250
285
1A 1B 1C NOTE!
685mm MIN
200
D12 @400
1375
D16 @200
575
15
D16 @200
0
1 : 50
20
1A 1B 1C
200
D16 @200
D12 @400
2100
Ground Floor
26300
D16 @200
0
20
Precast landing to come as one
with bottom flight of stairs,
D12 @400
D16 @200
low friction
bearing strip
FC
0P
20 13
150PFC
2590
200
200PFC UB4 S4.61
PF
0
36
C
200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS
12
150x5.0SHS
FC
200x6.0SHS 2180
P
200
HS
150UC30
.0S
15
DHS250/13
150UC30 - toes up
150UC30 - toes up
0
5
x5
0x
.0S
15
= = = = = = = = = = = = = = = = = = = =
HS
360UB44
200
2 rows of FastBrace 2 rows of FastBrace 2 rows of FastBrace 2 rows of FastBrace 2 rows of FastBrace 2 rows of FastBrace
150UC30
15
15
15
15
15
6580
PF
x5
x5
x5
x5
x5
C
.0S
.0S
.0S
.0S
.0S
12
HS
HS
HS
HS
HS
S4.61 DHS250/13
150x5.0SHS
FC
200x6.0SHS
200x6.0SHS
200x6.0SHS
200x6.0SHS
200x6.0SHS
P
200
15
150UC30
0 x5
200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS
.0S
HS
13
200
200 precast panel
PF
C
HS
HS
15
15
S
S
HS
DHS250/13
0x
0x
15
15
15
15
15
5.0
5.0
15
5.0
5.0
.0S
0
0
0
x5
x5
x5
x5
x5
0x
0x
x5
SH
S
5
.0S
150x5.0SHS
.0S
.0S
.0S
.0S
FC
15
15
.0S
0x
HS
314
S
200x6.0SHS
200x6.0SHS
15
HS
HS
HS
HS
HS
HS
P
360UB44
200
S3.11
6580
200
S 15 HS 15 17mm thick plywood, on
S3.11
SH 0x 0x 315 316
. 0S
PF
5. 0 5. 0
5. 0
15
x5
HS
C
CA-9 x 0 S3.11 S3.11 6-H12 at 100 CA-9
0
50 15
x5
.0S
150x5.0SHS
14
FC
15
P
0x
200
20
20
20
20
20
5 .0
200UB22
0
0
x6
x6
x6
x6
x6
SH
HS
CA-1
CA-2
CA-3
CA-4
CA-5
305 311
.0S
.0S
.0S
.0S
.0S
S 150UC30
.0S
150
15
HS
HS
HS
HS
HS
360UB44
S3.11
5
S3.11
0
0x
x5
150UC30
x5.0
15
.0S
307
HS
SH
200UB22
200
S3.11
S
2603 3917
200x6.0SHS
PF
150UC30
6580
1303 3967
C
38435
150UC30
150x5.0SHS 150x5.0SHS
FC
refer Architect's
200UB22
in-situ beam
in-situ beam
in-situ beam
in-situ beam
in-situ beam
P
304
15
15 16 Drawings for setout
200
0
303
2910
317
x5
S4.61 S4.61 S3.11
.0S
2310
HS
CA-9
310
S HS
S3.11
15
HS
200
HS
301 312
x 5 .0
.0S
.0S
in-situ beam
PF
5
S3.11 S3.11
5
150
0x
C
HS
0x
309
15
15
1
.0S
S3.11 410UB53 CA-9
6
0x
410UB53 410UB53 410UB53 S4.63
20
200UB22
HS
HS
308
.0S
.0S
S4.63
HS
HS
302 306
6
.0S
.0S
200
0x
0x
200x6.0SHS
S3.11
PF
20
20
S3.11
6580
6
Floor Construction: C
0x
0x
200UB22
150x5.0SHS
200UB22
20
20
S3.11 100 thick concrete topping on S3.11 S3.11 S3.11
Floor Construction:
HS
S
150UC30
11
- toes up
.0S
SH
100 thick concrete topping on
360UB44
5 .0
S4.62 5
0x
CA-6
CA-7
CA-8
CA-8
CA-8
with H12 at 200 EW - typical
15
x
.0S
150UC30
150
precast ribs at 900, reinforced 150UC30 - toes up S4.63
360UB44
5
0x
150x5
.0SHS .0 S H
200x6 S
15 360UB44 S 360UB44 360UB44
16 0x SH
HS
CA-9 HS 0 CA-9
15
5
HS
S4.62
15
15
0x
0
15
x5
DHS250/13 DHS250/13
.0S
HS
= = = = = =
15
15
15
15
200x6.0SHS
0
.0S
x5
x5
x5
x5
2 rows of FastBrace 5 2 rows of FastBrace
360UB44
360UB44
.0S
.0S
.0S
.0S
5
0x
9
6580
HS
HS
HS
HS
HS
S4.62
15
7
.0S
S4.62
5
0x
S4.62
150UC30 - toes up
150UC30 - toes up
150UC30 - toes up
150UC30 - toes up
150UC30 - toes up
150UC30 - toes up
DHS250/13 DHS250/13
15
15
0
15
x5
HS
HS
HS
HS
HS
200x6.0SHS
200x6.0SHS
200x6.0SHS
200x6.0SHS
200x6.0SHS
200x6.0SHS
200x6.0SHS
0
.0S
x5
.0S
.0S
.0S
.0S
.0S
.0S
HS
5
4
0x
0x
0x
0x
0x
HS
15
15
15
15
15
S4.62
200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS 200x6.0SHS
17
15
15
150UC30
150UC30
150UC30
150UC30
150UC30
x5
x5
200PFC
44
.0S
.0S
36
UB
200PFC
0U
2945
HS
HS
360
B4
S4.62
4
C
20
F
0P
0P
2
C
18
200 precast panel 200 precast panel 200 precast panel
Level 1 Plan
1 : 100
1A 1C 1F 1H
D12 starters at 200, bend
in alternate ways to lap
D12 starters at 200 D12 starters at 200 with floor reinforcing
2-D16 starters H12 at 200 EW H12 at 200 EW 200x6.0SHS H12 at 200 EW H12 at 200 EW prs. R10 stirrups at 200 H12 at 200 EW
2-H12
H12
at 200
H12
H12
H12
Level 1 5-H12 5-H12 Level 1
100
100
30500 30500
325
325
SG8 240x45 joist
H20
5-H20 5-H20
75
200UB22 200UB22 200UB22
H16 4-RB16 into precast SG8 240x70 ribbon plate, bolt SG8 240x70 ribbon plate, 2-D16 starters at 200,
R10 links at 200
column couplers through SHS into concrete with bolt to concrete with bend in alternate ways to prs. R10 stirrups at 200
lap with floor reinforcing RB16 at 200 670
precast column
H16 Hilti HIT-V M16 rods at 400, Hilti HIT-V M16 rods at 400,
drill & epoxy with Hilti HY-200, drill & epoxy with Hilti HY-200,
H16 at 400 150 min. embedment 150 min. embedment H16 at 400
100 2615
refer Blockwork refer Architect's D12 at 300, drill and epoxy
1C D12 starters at 200 CA-9 cast-in assembly Drawings for with Hilti HIT-HY 200,
Elevations for
H12
vertical reinforcing 200x6.0SHS upstand locations 80 min. embedment
H12
H12
H12 at 200 EW
2-H16
2-H16
302 Section 303 Section 304 Section
200
mesh
100
Level 1 S2.12 1 : 20 S2.12 1 : 20 S2.13 1 : 20
100
30500
325
SG8 240x45 joist 150x5.0SHS
301 Section precast rib
S2.12 1 : 20
1A 1C 1H
305 Section 306 Section 307 Section
S3.01 1 : 20 S2.13 1 : 20 S3.01 1 : 20
2-D16 starters at 400,
refer Architect's Drawings bend in alternate ways to
R10 stirrup at 150 lap with floor reinforcing
100 for 20mm upstand details
H12 at 200 EW 200x6.0SHS H12 at 200 EW H12 at 200 EW H12 at 200 EW
D12 starters at 200 H12 at 200 EW
2-H12
6-H12
H12
H12
H12
Level 1 Level 1
100
30500 30500
325
325
bolt to concrete with M16 threaded rods R10 link at 150 in-situ beam reinforcing Elevations for
drill & epoxy with Hilti HY-200,
H16 200 min. embedment, provide Hilti HIT-V M16 rods at 400, through blockwall vertical reinforcing
45 430
crush tube to SHS drill & epoxy with Hilti HY-200, H12 at 400
H16 at 400 150 min. embedment H12 at 400
150 240 refer Blockwork
Elevations for
RB16 at 200
vertical reinforcing
308 Section 309 Section 310 Section 311 Section 312 Section
S2.12 1 : 20 S2.12 1 : 20 S2.12 1 : 20 S2.11 1 : 20 S2.13 1 : 20
14 14 14 14
15
D12 at 300, drill and epoxy 150 steel framing
2050 with Hilti HIT-HY 200,
Sim Sim 130 150 min. embedment 555
303 311
refer adjacent extent of mezzanine refer Architect's Drawings extent of mezzanine
S3.11 S3.11
H12
detail for concrete walkway shown for 20mm upstand details walkway shown 6-H12 at 100
H12 at 200 D12 at 100
400
H12
H12
H12
H12
125
325
325
SG8 240x45 joists at 400 top & bottom plates SG8 240x45 joist
precast rib fixed to UC flanges precast rib precast rib
with M16 bolts at 1200
2-H12
H12
H12
R10 stirrup H20 bars CA-1 cast-in assembly 2-D12 starters 75 min.
2-D16 starters at 200 SG8 240x70 ribbon plate, SG8 240x70 ribbon plate, 2-D16 starters
& link at 150 at 400
bolt to concrete with bolt to through to UC with at 200 75 min. H12 at 400
10MS flat with 2-Ø18 75 min.
2-D16 starters at 200 Hilti HIT-V M16 rods at 400, M16 bolts at 400, provide
prs. R10 stirrups holes for M16 erection
drill & epoxy with Hilti HY-200, blocking as required RB16 at 200
bolts, pack as required
1500
H16 at 400 H16 at 400 H16 at 400
313 Section 314 Section 315 Section 316 Section 317 Section
S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20
16 16
16
525 525
200x6.0SHS
200x6.0SHS D12 starters at 200, CA-8 cast-in assembly
prs. R10 stirrups
at 200 bend in alternate ways to extent of mezzanine
2-D16 starters at 400,
lap with floor reinforcing walkway shown
bend in alternate ways to H12 at 200 EW H12 at 200 EW H12 at 200 EW
5-H12
400
H12
H12
H12
100
H12 at 200
Level 1 Level 1
30500 30500
325
325
SG8 240x45 joist SG8 240x45 joist
precast rib precast rib precast rib precast rib precast rib precast rib precast rib precast rib
provide 2-M16 erection 5-H20 75 min. CA-6 cast-in D12 starters at 200 2-D12 starters at 400 2-D12 starters at 400
D12 starters at 200,
blockwork column
360UB44
420
318 Section 319 Section 320 Section 321 Section 322 Section 323 Section 324 Section
S2.11 1 : 20 S2.11 1 : 20 S2.11 1 : 20 S3.01 1 : 20 S2.12 1 : 20 S2.12 1 : 20 S2.12 1 : 20