EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
A. PROCEDURE
Ensure that the proper voltmeters and ammeters and suitable reference SAES-X-400
A1
electrodes was used for CP testing. Sec. 3.1
Check the meter batteries periodically to ensure they still function SAES-X-400
A2
properly. Generally, they should be replaced every year. Sec. 3.1
SAES-X-400
A3 Ensure that all meters was calibrated.
Sec. 3.1
Ensure that the copper-copper sulfate and silver-silver chloride reference SAES-X-400
A6
electrodes was properly maintained. Sec. 3.1
B1. Multimeter
C. TEST RESULTS
STRUCTURE TO POLARIZATION
GALVANIC
EQUIPMENT IDENTIFICATION TEST POINTS LOCATION ELECTROLYTE CURRENT REMARKS
ANODE TYPE (Amp)
POTENTIAL (mV)
Volt Meter
Brand: ______________
S/N: ______________
Calib. Date:___________
Ammeter
Brand: ______________
S/N: ______________
Calib. Date:___________
Page 1 of 3
Ammeter
Brand: ______________
S/N: ______________
Calib. Date:___________
Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Galvanic CP Testing SATR-X-3101 CP-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
D. CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Safety
Cathodic protection personnel are responsible for obtaining appropriate SAES-P-332
D1
work permits and associated gas test results from the operations Sec. 3
foreman in all classified areas before starting any job.
REMARKS:
REFERENCE DOCUMENTS:
1. SAEP-332 Cathodic Protection Commissioning, 31 May 2005
2. SAES-X-400 Cathodic Protection of Buried Pipelines, 22 October 2007
3. SAES-X-500 Cathodic Protection of Vessel and Tank Internals, 31 March 2008
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED