com 05/30/2020
Qs= 20 kN/m2
Sheet 2
1.94
3
15.5°
4
5
2.00
15.0° 7
8
3.00
15.0°
10.0
Qs= 20 kN/m2
3.00
15.0°
2.00
2.00
1.70
0.65
0.85
1/8
ww.IksaPro.com 05/30/2020
Soil Data :
Surcharge Qs = 20.0
Unit Weight ɣ= 18.6 kN/m3
Slope Angle β° = 15.5°
Effective Ground Acceleration Coefficient Ao = 0.4
Subgrade modulus Kh = 25000 kN/m3
Bearing Capacity σz = 200.0 kN/m2
Cohesion C= 25.0 kN/m2
Friction Angle ø° = 20.0°
Behind the wall friction angle δ° = 13.33
Static active pressure coefficient Kas = 0.49
Static passive pressure coefficient Kps = 2.04
Ch : 0.24
Cv : 0.16
λ° : 1.49
Total active pressure coefficient Kat = 0.77
Total passive pressure coefficient Kpt = 2.32
Dynamic active pressure coefficient Kad = 0.28
Dynamic passive pressure coefficient Kpd = 0.28
Excavation Heigth H= 10.0 m
Pile Length Hpile = 12.00 m
Loads :
434.25
346.75 Pq Pad=3 Kad (1-z/H) ɣ z
Pas Pad
+ 2 Qs Kad (1-z/H)
289.94
76.29
Ppd Pps
Displ. (mm)
Ppd=3 Kpd (1-z/H') ɣ z Pps = Kas ɣ H' Pas =k1 (Kas ɣ H Pq = Kas Qs Δ1 = -26.05
+2C√Kps -2C√Kas) Δ2 = -20.81
Δ3 = -17.40
Horizontal Forces (Anchor Point) : k1
0.5
2/8
ww.IksaPro.com 05/30/2020
SELECT = 7.0 m
X = Max(0.2H ;1.5m ; OR SELECT) 7.00 m
α = i+45+Ø/2 70.00 °
Lu = Hf sin(45-ø/2) / sin α + X
Member hi Hf i° Lu
Name m m m
anchor 1 2.00 10.00 15.0° 13.10
anchor 2 5.00 7.00 15.0° 11.27
anchor 3 8.00 4.00 15.0° 9.44
Lb = P . GS / [K. π . d . T ]
Lb : Bonded Length
P : anchor load
d : anchor diameter
T : Working bond stress
Gs : Safety factor GS = 1.50
K : Lateral thrust coefficient
π : 3.14159265358979
Member Pi d Lb
Name Pn/cosi m m
anchor 1 449.56 0.15 19.08
anchor 2 358.98 0.15 15.24
anchor 3 300.17 0.15 12.74
3/8
ww.IksaPro.com 05/30/2020
Strand Selection :
Member Nh Øh Shkp =
Name Adet mm kN
anchor 1 5 15.20 233
anchor 2 4 15.20 233
anchor 3 4 15.20 233
Phalat kp = Strand Tensile Strength (Shkp) x (Total strands area (As_hlt) x strand numbers (Nh)
Phalat em = Unit Bearing Capacity (Sem) x (Total strand surface area (Ahlt) x Strand numbers (Nh)
Sem = 500 kN/m2
4/8
ww.IksaPro.com 05/30/2020
Push Forces
Pile Weigth : = 82.96 kN 15.62
Beams Weigth = 15.62 kN
Pav1 = 58.18 kN 58.18
Pav2 = 46.46 kN 46.46
Pvb = 242.05
Pav3 = 38.84 kN 38.84
Pvb = 242.05 kN
G.S = 1.50 82.96
408.41
2.00
Pvt = 408.41
Meet Forces
Pile End Resistance, Uv = 201.73 kN 201.73
Friction resistance, Sv = 408.41 kN
Pvt = max( Uv ; Sv ) = 408.41 kN
Lw > 5.00 m.
and
Lw > Lb
45+ø/2
5/8
ww.IksaPro.com 05/30/2020
6/8
ww.IksaPro.com 05/30/2020
M1 = 209.08 kNm
16Ø200.05 M2 = 375.65 m
M3 = 314.10 m
Mr = 36.73 kN/m2
Md = max{M1,2,3,r} *1.35 = 375.6 kNm
Nd = 326.8 kN
0.65
0.75 B= 0.75 m
H= 0.60 m
Asmin : 45.00 cm2
20Ø18 Reinf. Dia. = Ø18 2.54 cm2/#
0.60
7/8
ww.IksaPro.com 05/30/2020
217.12 217.12
173.38 173.38
144.97 144.97
10.00
8/8