Professional Documents
Culture Documents
Warning 3
DO NOT ATTEMPT TO INSTALL
OR PERFORM MAINTENANCE ON
EQUIPMENT WHILE IT IS ENER-
GIZED. DEATH OR SEVERE PER-
SONAL INJURY CAN RESULT
FROM CONTACT WITH ENER-
GIZED EQUIPMENT. ALWAYS
VERIFY THAT NO VOLTAGE IS
PRESENT BEFORE PROCEEDING.
1
4
7 5 in-lb
( 8 N ⋅m )
4mm
2
Push to
Click
6b 2 3 4 5 6 3
4. tLD - The number of seconds required to trip @ 6x Ir.
i.e. Ir-250 A, tLD-2 sec load current - 1500A (6x) The
breaker will trip in 2 seconds.
TR IP
ON
T R IP
RESET
Eaton Corportaiton
Cutler-Hammer business unit
170 Industry Drive, RIDC Park West
Pittsburgh, PA, 15275, USA
Tel: 1-800-525-2000
www.cutler-hammer.com ©2001 Eaton Corporation
All Rights Reserved
Printed USA/TQC
Publication IL01204001E
July, 2002 Effective 7/99