Project : Oriental Gardens Makati (Lilac Tower)

Location : Chino Roces Ave. cor. Urban Ave., Makati City


Subject : Quantities of Concrete & Cement per Floor

Structural Specifications
6,000 psi. @ 28 days G.F to 13th Flr. (For all concrete mix of all structural members as shown in the plans)
5,000 psi. @ 28 days 13th Flr. to 22nd Flr. (For all concrete mix of all structural members as shown in the plans)
4,000 psi. @ 28 days 22nd Flr. and above (For concrete mix of all structural members, all foundation works & all bored piles )
3,000 psi. @ 28 days (For all concrte mix of all non-structural elements as shown in the plans)

Cement Factor
Design Strenth 3/4 in. PCD 3/4 in. ORD
6,000 psi 19.00 Bags 18.00 Bags
5,000 psi 17.00 Bags 16.00 Bags
4,000 psi 14.50 Bags 12.75 Bags
3,000 psi 11.50 Bags 10.00 Bags

Ground to Roof
Ground Floor
Description Volume Quantity of Cement
Curbs, upstands & zocalos 0.20 m3 2.30 Bags
Wall Footings 2.35 m3 34.08 Bags
Column bases,isolated ftgs.&pedestals 392.27 m3 5,687.92 Bags
Ground beams/FTB 69.64 m3 1,009.78 Bags
Mat Foundations 372.32 m3 5,398.64 Bags
Slab on grade 174.39 m3 2,528.66 Bags
Columns 33.52 m3 636.88 Bags
RC Walls 6.10 m3 115.90 Bags
Lift Walls 12.56 m3 238.64 Bags
Shear Walls 71.59 m3 1,360.21 Bags
Staircases 2.31 m3 43.89 Bags
Total 1,137.25 m3 17,056.89 Bags
2nd Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 28.22 m3 536.18 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 102.67 m3 1,950.67 Bags
Beams & Girders 75.59 m3 1,436.23 Bags
Staircases 2.69 m3 51.05 Bags
Total 320.05 m3 6,024.75 Bags
3rd Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 28.22 m3 536.18 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 96.81 m3 1,839.36 Bags
Beams & Girders 75.97 m3 1,443.40 Bags
Staircases 2.69 m3 51.05 Bags
Total 314.57 m3 5,920.61 Bags

Page 1 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

4th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 25.45 m3 483.55 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 77.94 m3 1,480.88 Bags
Staircases 2.69 m3 51.05 Bags
Total 316.31 m3 5,953.58 Bags
5th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 25.45 m3 483.55 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 77.94 m3 1,480.88 Bags
Staircases 2.69 m3 51.05 Bags
Total 316.31 m3 5,953.58 Bags
6th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 25.45 m3 483.55 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 80.44 m3 1,528.37 Bags
Staircases 2.69 m3 51.05 Bags
Total 318.81 m3 6,001.07 Bags
7th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 34.21 m3 649.99 Bags
RC Walls 30.80 m3 585.22 Bags
Lift Walls 17.86 m3 339.33 Bags
Shear Walls 71.52 m3 1,358.82 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 82.13 m3 1,560.43 Bags
Staircases 3.22 m3 61.27 Bags
Total 346.58 m3 6,528.82 Bags
8th Floor
Description Volume Quantity of Cement
Curbs, upstands, zocalos & seatwalls 3.14 m3 36.11 Bags
Columns 26.38 m3 501.22 Bags

Page 2 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

RC Walls 22.50 m3 427.50 Bags

Page 3 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Lift Walls 12.23 m3 232.37 Bags


Shear Walls 69.71 m3 1,324.49 Bags
Suspended Slabs 102.27 m3 1,943.13 Bags
Beams & Girders 93.18 m3 1,770.42 Bags
Staircases 2.69 m3 51.11 Bags
Total 332.10 m3 6,286.35 Bags
9th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 37.51 m3 712.69 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 86.33 m3 1,640.23 Bags
Staircases 2.71 m3 51.49 Bags
Total 348.28 m3 6,568.03 Bags
10th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 634.03 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 87.68 m3 1,665.94 Bags
Staircases 2.71 m3 51.49 Bags
Total 345.50 m3 6,515.08 Bags
11th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 634.03 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 87.68 m3 1,665.94 Bags
Staircases 2.71 m3 51.49 Bags
Total 345.50 m3 6,515.08 Bags
12th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 634.03 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 87.38 m3 1,660.22 Bags

Page 4 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Staircases 2.71 m3 51.49 Bags

Page 5 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Total 345.20 m3 6,509.36 Bags


13th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 567.29 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 375.88 m3 6,353.77 Bags
14th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 567.29 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 375.88 m3 6,353.77 Bags
15th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 567.29 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 375.88 m3 6,353.77 Bags
16th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 29.46 m3 500.82 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 371.97 m3 6,287.30 Bags
17th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags

Page 6 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Curbs, upstands & zocalos 3.39 m3 38.93 Bags

Page 7 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Columns 29.46 m3 500.82 Bags


RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 371.97 m3 6,287.30 Bags
18th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 29.46 m3 500.82 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 371.97 m3 6,287.30 Bags
19th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 25.80 m3 438.60 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 368.31 m3 6,225.08 Bags
20th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 25.80 m3 438.60 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 86.09 m3 1,463.45 Bags
Staircases 2.71 m3 46.05 Bags
Total 366.99 m3 6,202.68 Bags
21st Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 25.80 m3 438.60 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags

Page 8 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Suspended Slabs 114.85 m3 1,952.49 Bags

Page 9 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Beams & Girders 86.09 m3 1,463.45 Bags


Staircases 2.71 m3 46.05 Bags
Total 366.99 m3 6,202.68 Bags
22nd Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 22.39 m3 324.66 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 86.63 m3 1,256.10 Bags
Staircases 2.61 m3 37.86 Bags
Total 330.65 m3 4,774.66 Bags
23rd Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 22.39 m3 324.66 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 85.60 m3 1,241.26 Bags
Staircases 2.61 m3 37.86 Bags
Total 329.62 m3 4,759.82 Bags
24th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 22.39 m3 324.66 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 85.60 m3 1,241.26 Bags
Staircases 2.61 m3 37.86 Bags
Total 329.62 m3 4,759.82 Bags
25th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 19.22 m3 278.69 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 325.02 m3 4,693.06 Bags

Page 10 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

26th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 19.22 m3 278.69 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 325.02 m3 4,693.06 Bags
27th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 16.29 m3 236.21 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 322.09 m3 4,650.57 Bags
28th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 16.29 m3 236.21 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 322.09 m3 4,650.57 Bags
29th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 14.17 m3 205.47 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 82.75 m3 1,199.88 Bags
Staircases 2.61 m3 37.86 Bags
Total 318.55 m3 4,599.25 Bags
30th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags

Page 11 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Columns 14.87 m3 215.62 Bags

Page 12 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

RC Walls 30.18 m3 437.54 Bags


Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 82.75 m3 1,199.88 Bags
Staircases 2.61 m3 37.86 Bags
Total 319.25 m3 4,609.40 Bags
31st Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 14.87 m3 215.62 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 105.72 m3 1,532.97 Bags
Beams & Girders 82.75 m3 1,199.88 Bags
Staircases 2.61 m3 37.86 Bags
Total 317.92 m3 4,590.09 Bags
32nd Floor (Penthouse)
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 14.87 m3 215.62 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 105.72 m3 1,532.97 Bags
Beams & Girders 80.98 m3 1,174.17 Bags
Staircases 2.61 m3 37.86 Bags
Total 316.15 m3 4,564.38 Bags
Roof Deck
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Saddle 3.36 m3 38.64 Bags
Columns 27.35 m3 396.58 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 129.75 m3 1,881.42 Bags
Beams & Girders 99.84 m3 1,447.63 Bags
Staircases 2.61 m3 37.86 Bags
Total 374.88 m3 5,405.89 Bags

Grand Total 12,063.16 m3 199,137.36 Bags

Prepared by: Noted by:

Jose P. Maaliw Climaco F. Sorial


MEC-Engineer MEC-Project Manager

Page 13 Qty of Conc & Cem (OGM-Lilac)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Structural Specifications
6,000 psi. @ 28 days G.F to 13th Flr. (For all concrete mix of all structural members as shown in the plans)
5,000 psi. @ 28 days 13th Flr. to 22nd Flr. (For all concrete mix of all structural members as shown in the plans)
4,000 psi. @ 28 days 22nd Flr. and above (For concrete mix of all structural members, all foundation works & all bored piles )
3,000 psi. @ 28 days (For all concrte mix of all non-structural elements as shown in the plans)

Cement Factor
Design Strenth 3/4 in. PCD 3/4 in. ORD
6,000 psi 19.00 Bags 18.00 Bags
5,000 psi 17.00 Bags 16.00 Bags
4,000 psi 14.50 Bags 12.75 Bags
3,000 psi 11.50 Bags 10.00 Bags

Ground to Roof
Ground Floor
Description Volume Quantity of Cement
Curbs, upstands & zocalos 0.20 m3 2.30 Bags
Wall Footings 2.35 m3 34.08 Bags
Column bases,isolated ftgs.&pedestals 392.27 m3 5,687.92 Bags
Ground beams/FTB 69.64 m3 1,009.78 Bags
Mat Foundations 372.32 m3 5,398.64 Bags
Slab on grade 174.39 m3 2,528.66 Bags
Columns 33.52 m3 636.88 Bags
RC Walls 6.10 m3 115.90 Bags
Lift Walls 12.56 m3 238.64 Bags
Shear Walls 71.59 m3 1,360.21 Bags
Staircases 2.31 m3 43.89 Bags
Total 1,137.25 m3 17,056.89 Bags
2nd Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 28.22 m3 536.18 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 102.67 m3 1,950.67 Bags
Beams & Girders 75.59 m3 1,436.23 Bags
Staircases 2.69 m3 51.05 Bags
Total 320.05 m3 6,024.75 Bags
3rd Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 28.22 m3 536.18 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 96.81 m3 1,839.36 Bags
Beams & Girders 75.97 m3 1,443.40 Bags
Staircases 2.69 m3 51.05 Bags
Total 314.57 m3 5,920.61 Bags

Page 14 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

4th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 25.45 m3 483.55 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 77.94 m3 1,480.88 Bags
Staircases 2.69 m3 51.05 Bags
Total 316.31 m3 5,953.58 Bags
5th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 25.45 m3 483.55 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 77.94 m3 1,480.88 Bags
Staircases 2.69 m3 51.05 Bags
Total 316.31 m3 5,953.58 Bags
6th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 25.45 m3 483.55 Bags
RC Walls 25.67 m3 487.69 Bags
Lift Walls 15.53 m3 295.07 Bags
Shear Walls 62.19 m3 1,181.58 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 80.44 m3 1,528.37 Bags
Staircases 2.69 m3 51.05 Bags
Total 318.81 m3 6,001.07 Bags
7th Floor
Description Volume Quantity of Cement
Parapet and planter walls 0.93 m3 10.73 Bags
Curbs, upstands & zocalos 6.57 m3 75.54 Bags
Columns 34.21 m3 649.99 Bags
RC Walls 30.80 m3 585.22 Bags
Lift Walls 17.86 m3 339.33 Bags
Shear Walls 71.52 m3 1,358.82 Bags
Suspended Slabs 99.34 m3 1,887.48 Bags
Beams & Girders 82.13 m3 1,560.43 Bags
Staircases 3.22 m3 61.27 Bags
Total 346.58 m3 6,528.82 Bags
8th Floor
Description Volume Quantity of Cement
Curbs, upstands, zocalos & seatwalls 3.14 m3 36.11 Bags
Columns 26.38 m3 501.22 Bags

Page 15 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

RC Walls 22.50 m3 427.50 Bags

Page 16 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Lift Walls 12.23 m3 232.37 Bags


Shear Walls 69.71 m3 1,324.49 Bags
Suspended Slabs 102.27 m3 1,943.13 Bags
Beams & Girders 93.18 m3 1,770.42 Bags
Staircases 2.69 m3 51.11 Bags
Total 332.10 m3 6,286.35 Bags
9th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 37.51 m3 712.69 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 86.33 m3 1,640.23 Bags
Staircases 2.71 m3 51.49 Bags
Total 348.28 m3 6,568.03 Bags
10th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 634.03 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 87.68 m3 1,665.94 Bags
Staircases 2.71 m3 51.49 Bags
Total 345.50 m3 6,515.08 Bags
11th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 634.03 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 87.68 m3 1,665.94 Bags
Staircases 2.71 m3 51.49 Bags
Total 345.50 m3 6,515.08 Bags
12th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 634.03 Bags
RC Walls 31.26 m3 593.94 Bags
Lift Walls 10.08 m3 191.52 Bags
Shear Walls 66.61 m3 1,265.64 Bags
Suspended Slabs 107.20 m3 2,036.85 Bags
Beams & Girders 87.38 m3 1,660.22 Bags

Page 17 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Staircases 2.71 m3 51.49 Bags

Page 18 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Total 345.20 m3 6,509.36 Bags


13th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 567.29 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 375.88 m3 6,353.77 Bags
14th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 567.29 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 375.88 m3 6,353.77 Bags
15th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 33.37 m3 567.29 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 375.88 m3 6,353.77 Bags
16th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 29.46 m3 500.82 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 371.97 m3 6,287.30 Bags
17th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags

Page 19 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Curbs, upstands & zocalos 3.39 m3 38.93 Bags

Page 20 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Columns 29.46 m3 500.82 Bags


RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 371.97 m3 6,287.30 Bags
18th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 29.46 m3 500.82 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 371.97 m3 6,287.30 Bags
19th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 25.80 m3 438.60 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 87.40 m3 1,485.85 Bags
Staircases 2.71 m3 46.05 Bags
Total 368.31 m3 6,225.08 Bags
20th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 25.80 m3 438.60 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags
Suspended Slabs 114.85 m3 1,952.49 Bags
Beams & Girders 86.09 m3 1,463.45 Bags
Staircases 2.71 m3 46.05 Bags
Total 366.99 m3 6,202.68 Bags
21st Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 25.80 m3 438.60 Bags
RC Walls 31.26 m3 531.44 Bags
Lift Walls 15.89 m3 270.13 Bags
Shear Walls 83.81 m3 1,424.85 Bags

Page 21 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Suspended Slabs 114.85 m3 1,952.49 Bags

Page 22 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Beams & Girders 86.09 m3 1,463.45 Bags


Staircases 2.71 m3 46.05 Bags
Total 366.99 m3 6,202.68 Bags
22nd Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 22.39 m3 324.66 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 86.63 m3 1,256.10 Bags
Staircases 2.61 m3 37.86 Bags
Total 330.65 m3 4,774.66 Bags
23rd Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 22.39 m3 324.66 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 85.60 m3 1,241.26 Bags
Staircases 2.61 m3 37.86 Bags
Total 329.62 m3 4,759.82 Bags
24th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 22.39 m3 324.66 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 85.60 m3 1,241.26 Bags
Staircases 2.61 m3 37.86 Bags
Total 329.62 m3 4,759.82 Bags
25th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 19.22 m3 278.69 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 325.02 m3 4,693.06 Bags

Page 23 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

26th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 19.22 m3 278.69 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 325.02 m3 4,693.06 Bags
27th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 16.29 m3 236.21 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 322.09 m3 4,650.57 Bags
28th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 16.29 m3 236.21 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 84.17 m3 1,220.46 Bags
Staircases 2.61 m3 37.86 Bags
Total 322.09 m3 4,650.57 Bags
29th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 14.17 m3 205.47 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 82.75 m3 1,199.88 Bags
Staircases 2.61 m3 37.86 Bags
Total 318.55 m3 4,599.25 Bags
30th Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags

Page 24 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

Columns 14.87 m3 215.62 Bags

Page 25 Qty of Conc & Cem (OGM-coded)


Project : Oriental Gardens Makati (Lilac Tower)
Location : Chino Roces Ave. cor. Urban Ave., Makati City
Subject : Quantities of Concrete & Cement per Floor

RC Walls 30.18 m3 437.54 Bags


Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 107.05 m3 1,552.28 Bags
Beams & Girders 82.75 m3 1,199.88 Bags
Staircases 2.61 m3 37.86 Bags
Total 319.25 m3 4,609.40 Bags
31st Floor
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 14.87 m3 215.62 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 105.72 m3 1,532.97 Bags
Beams & Girders 82.75 m3 1,199.88 Bags
Staircases 2.61 m3 37.86 Bags
Total 317.92 m3 4,590.09 Bags
32nd Floor (Penthouse)
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Columns 14.87 m3 215.62 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 105.72 m3 1,532.97 Bags
Beams & Girders 80.98 m3 1,174.17 Bags
Staircases 2.61 m3 37.86 Bags
Total 316.15 m3 4,564.38 Bags
Roof Deck
Description Volume Quantity of Cement
Parapet and planter walls 3.20 m3 36.74 Bags
Curbs, upstands & zocalos 3.39 m3 38.93 Bags
Saddle 3.36 m3 38.64 Bags
Columns 27.35 m3 396.58 Bags
RC Walls 30.18 m3 437.54 Bags
Lift Walls 13.33 m3 193.30 Bags
Shear Walls 61.88 m3 897.26 Bags
Suspended Slabs 129.75 m3 1,881.42 Bags
Beams & Girders 99.84 m3 1,447.63 Bags
Staircases 2.61 m3 37.86 Bags
Total 374.88 m3 5,405.89 Bags

Grand Total 12,063.16 m3 199,137.36 Bags

Prepared by: Noted by:

Jose P. Maaliw Climaco F. Sorial


MEC-Engineer MEC-Project Manager

Page 26 Qty of Conc & Cem (OGM-coded)


CEMENT CONCRETE

2.30 0.20
14,659.07 1,010.97

2,395.52 126.08

17,056.89 1,137.25

86.27 7.50

5,938.48 312.55

6,024.75 320.05

86.27 7.50

5,834.34 307.07

5,920.61 314.57

Page 27 Qty of Conc & Cem (OGM-coded)


86.27 7.50

5,867.31 308.81

5,953.58 316.31

86.27 7.50

5,867.31 308.81

5,953.58 316.31

86.27 7.50

5,914.80 311.31

6,001.07 318.81

86.27 7.50

6,442.55 339.08

6,528.82 346.58

36.11 3.14
6,250.24 328.96

Page 28 Qty of Conc & Cem (OGM-coded)


Page 29 Qty of Conc & Cem (OGM-coded)
6,286.35 332.10

75.67 6.58

6,492.35 341.70

6,568.03 348.28

75.67 6.58

6,439.40 338.92

6,515.08 345.50

75.67 6.58

6,439.40 338.92

6,515.08 345.50

75.67 6.58

6,433.69 338.62

Page 30 Qty of Conc & Cem (OGM-coded)


Page 31 Qty of Conc & Cem (OGM-coded)
6,509.36 345.20

75.67 6.58

6,278.09 369.30

6,353.77 375.88

75.67 6.58

6,278.09 369.30

6,353.77 375.88

75.67 6.58

6,278.09 369.30

6,353.77 375.88

75.67 6.58

6,211.62 365.39

6,287.30 371.97

75.67 6.58

Page 32 Qty of Conc & Cem (OGM-coded)


Page 33 Qty of Conc & Cem (OGM-coded)
6,211.62 365.39

6,287.30 371.97

75.67 6.58

6,211.62 365.39

6,287.30 371.97

75.67 6.58

6,149.40 361.73

6,225.08 368.31

75.67 6.58

6,127.00 360.41

6,202.68 366.99

75.67 6.58

6,127.00 360.41

Page 34 Qty of Conc & Cem (OGM-coded)


Page 35 Qty of Conc & Cem (OGM-coded)
6,202.68 366.99

75.67 6.58

4,698.98 324.07

4,774.66 330.65

75.67 6.58

4,684.14 323.04

4,759.82 329.62

75.67 6.58

4,684.14 323.04

4,759.82 329.62

75.67 6.58

4,617.38 318.44

4,693.06 325.02

Page 36 Qty of Conc & Cem (OGM-coded)


75.67 6.58

4,617.38 318.44

4,693.06 325.02

75.67 6.58

4,574.90 315.51

4,650.57 322.09

75.67 6.58

4,574.90 315.51

4,650.57 322.09

75.67 6.58

4,523.57 311.97

4,599.25 318.55

75.67 6.58

Page 37 Qty of Conc & Cem (OGM-coded)


4,533.72 312.67

Page 38 Qty of Conc & Cem (OGM-coded)


4,609.40 319.25

75.67 6.58

4,514.41 311.34

4,590.09 317.92

75.67 6.58

4,488.71 309.57

4,564.38 316.15

114.31 9.94

5,291.58 364.94

5,405.89 374.88

199,137.36 12,063.16
70,315.39 3,700.81
55,872.54 3,286.62
70,462.90 4,859.51
2,486.53 216.22
199,137.36 12,063.16

Page 39 Qty of Conc & Cem (OGM-coded)