Project Proposal: The Enhancement of the Drainage System for the students and teacher
of Virgen del Pilar School

Background
This project was mainly created to reduce the flood disaster in the school campus but after further research we
conclude that this project is great project to ensure the safety of the students and teachers and to prevent any
incidents that may happen in the near future.

Objectives
· Flood Disaster Risk Reduction
· Prevent any Waterborne Diseases
· Preserve the Landscape of the School

Scope
It will help the school management to ensure the safety of the students to their parents and it also deduct a possible
hazard in the school .
Project Implementation
Task Start and End Dates

Phase One Have a strict assessment of the school’ drainage 05-07, March 2020
system and terrain to identify possible risk factors

Phase Two Carefully plan and manage the resources 08-10, March 2020
needed to make the project flawless

Phase Three Build the drainage system and other necessary 11-31 , March 2020
steps connected to the project

Resource plan

FINANCIAL HUMAN RESOURCES Technical Resources


RESOURCE -San Jose Builders Inc - Jamero Trucks
-School Funds - AJM Team - Deraj Machineries
- Crowd funding -School Management - Quero’s social
- Organization -School Caretakers managements
‘sBudget - Bodde’s Hardware

ITEMS NEEDED:
-HAURATION CHANNEL SYSTEM ( type of drainage) - Construction tools ( shovels ,
. drills and etc)
-RAJ CEMENTS - Concrete – PIPES – FOUNDATION BOARDs
Project Budget
5 million and 700 thousand

Project Justification
This project is for the enhancement of the augmentation of the school’s drainage system and we strongly
believe that we are highly capable in executing this project than anyone else because we have conducted
several assessments before inside the campus . We also have the skills and mindset to engage ourselves
in this project thus I conclude that our team is competent for this project

Personnel Involved NAMES ROLES


the overall responsibility for the successful initiation, planning,
Project Manager Annabella Dela Cruz
design, execution, monitoring, controlling and closure of a project
Lead Engineer and Janz Xaviery Yves N. Buena responsibilities include monitoring the maintenance
Architect and upgrade activities in the corporate projects.
Head of the School’s Maxine Quero
ensure the buildings are well-maintained
Caretaker
safe, secure and clean

School Principal Sr. Bernadeth Ogano observe and participate in the project’s needs

Resource Manager Kurt Jamero provide the project’s resources in human ,


f financial and technical resources
Abstract
This plan evaluates an enhancement of the drainage system in Virgen del Pilar School and
establish a plan for the recommended improvements. This proposal seeks safety of the
students, teaching and non-teaching staffs. More specifically, this plan presents the problem,
identifies the improvement designed to relieve existing problem areas or potential future
problem areas, and recommend standards for the design of the drainage system. We will be
needing help from the Disaster Risk Reduction and Management Council for the assessment
around the school. And also, for the implementation and improvisation of the drainage system
we will be needing help from the San Jose Builders Inc

Approval Signatures

Sr. Bernadeth Ogano Janz Xaviery Yves N. Buena Annabella Dela Cruz
School Principal Lead Engineer and Architect Project Manager