Analysis of problem:
In Assembly Department of Centrifugal pump, Pumps which are of smaller size
can be drilled on small machine but in case of large size pump cannot be drilled
on the same machine.
Due to which the whole setup is to be shifted to another workshop for Boring
operation and also some time due to improper dimensions there is misalignment
of drilled holes and again same process is to be carried out which is time
consuming process, reduces productivity and expensive.
As the setup is bulky, it is difficult for transporting from one place to another
and heavy duty cranes fails during transporting which causes unbalancing and
misalignment of impeller shaft which will damage the impeller blades.
Reason:
Currently available machine is of smaller size and contain small size bed due to
which load carrying capacity is less.
Restriction of drilling at higher elevation, due to smaller column height.
For drilling operation of heavy duty pump, the assembly is moved from one
shop to another shop for boring operation, which is time consuming process.
Excess up and down movement of worker during operation causes error in
alignment of shaft.
Solution:
Introduce large size drilling machine which will sustain for heavy duty pump and
also withstand for high loading capacity, vibration and resistance to the back force
which will drill the hole in the assembly section only.
[Type the document title]
Design Component:
Design of shaft.
Design of key
Design of bearing
Design of power transmission system
Design of column.
Design of flexible bed.
Design of foundation for flexible bed.
Selection of prime mover.
Power consumption calculation.
Input:
Bore Diameter to be drilled = 1 inch (25.4mm) depend on type of pump
Depth of drill = 50 mm
Pump on which operation need to be carried out : 48-48 DV
Cost Estimated:
Tentative cost of machine is 7 to 10 lakhs.