You are on page 1of 3

SALSA - Maintenance Date 15/06/20

Module – Master Data :


480170570.doc
Exercise Book Doc :
Create and Assign PM
Assemblies

1. DESCRIPTION

Process:

Maintenance processing

Sub-process:

Create a PM assembly and assign it to an equipment

2. OBJECTIVES
- Create a PM assembly and assign it to an equipment

3. SCENARIO
Create a PM assembly and assign it to an equipment

Date de dernière mise à jour : 15/06/2020 Page : 1 sur 3


SALSA - Maintenance Date 15/06/20
Module – Master Data :
480170570.doc
Exercise Book Doc :
Create and Assign PM
Assemblies

4. CASE STUDY TERMS

You have to install an Anderson Green safety valve of type XXX: you have
to create a PM assembly and assign it to the equipment you are installing.

Exercise 1: create a PM assembly

Exercise 2: assign this assembly to the equipment

Exercise 1: create a PM assembly


1. What description should you give to your PM assembly?

2. What base unit of measure should you choose for your PM assembly?

Exercise 2: assign this assembly to the equipment


1. In which field should you enter the PM assembly code to assign it to your
equipment?

Date de dernière mise à jour : 15/06/2020 Page : 2 sur 3


SALSA - Maintenance Date 15/06/20
Module – Master Data :
480170570.doc
Exercise Book Doc :
Create and Assign PM
Assemblies

5. EXERCISE SOLUTION

Exercise 1: create a PM assembly


1. What description should you give to your PM assembly?

The description convention is: Object class / Object sub-class / Model (or TAG)
2. What base unit of measure should you choose for your PM assembly?

Always piece ‘ASS’.

Exercise 2: assign this assembly to the equipment


1. In which field should you enter the PM assembly code to assign it to your
equipment?

In the field “Construction Type” of “Structure” tab of the equipment.

Date de dernière mise à jour : 15/06/2020 Page : 3 sur 3

You might also like