Power Sector Situation
LUZON Capacity by Grid
LUZON CAPACITY MIX (%)
0.30
LUZON 0.26

FUEL TYPE Capacity (MW) Percent Share (%) Coal


Installed Dependable Installed Dependable 19.10
Oil Based

Coal 4,671 4,391 36.10 38.14 36.10 Diesel

Oil Based 2,020 1,494 15.61 12.98 6.52 Oil Thermal


Gas Turbine
Diesel 750 634 5.80 5.51
Natural Gas
Oil Thermal 650 320 5.02 2.78
22.11 Geothermal
Gas Turbine 620 540 4.79 4.69 Hydro
15.61
Natural Gas 2,861 2,759 22.11 23.97 Wind
Geothermal 844 692 6.52 6.01 5.80 Biomass

Hydro 2,471 2,131 19.10 18.51 4.79


5.02
Wind 33 17 0.26 0.15
Biomass 38 29 0.30 0.25
TOTAL 12,939 11,514
Source: List of Existing Power Plants, released October 2014
Power Sector Situation
VISAYAS Capacity by Grid VISAYAS CAPACITY MIX (%)
1.76 0.04

0.45 0.87
VISAYAS
FUEL TYPE Capacity (MW) Percent Share (%) Coal
Installed Dependable Installed Dependable 31.97 Oil Based
38.30
Coal 806 777 31.97 35.97 Diesel

Oil Based 670 505 26.60 23.40 Gas Turbine

Diesel 615 463 24.42 21.46 Geothermal


Hydro
Gas Turbine 55 42 2.18 1.94 26.60
Biomass
Geothermal 965 817 38.30 37.83 2.18
Natural Gas
24.42
Hydro 11 11 0.45 0.50 Solar
Biomass 44 32 1.76 1.50
Natural Gas 1 1 0.04 0.05
Solar 22 17 0.87 0.76
TOTAL 2,520 2,160
Source: List of Existing Power Plants, released October 2014
Power Sector Situation
MINDANAO Capacity by Grid MINDANAO CAPACITY MIX (%)
1.67
0.05

MINDANAO 10.79

FUEL TYPE Capacity (MW) Percent Share (%) Coal


Installed Dependable Installed Dependable 49.31
Oil Based
33.15
Coal 232 210 10.79 11.59 Diesel

Oil Based 713 654 33.15 36.08


Geothermal
Hydro
Diesel 713 654 33.15 36.08 Solar
Geothermal 108 98 5.04 5.41 Biomass

Hydro 1,061 840 49.31 46.35 33.15


5.04
Solar 1 0.3 0.05 0.02
Biomass 36 10 1.67 0.55
TOTAL 2,151 1,812
Source: List of Existing Power Plants, released October 2014
LUZON POWER SUPPLY-DEMAND SITUATION
1 JANUARY to 31 OCTOBER 2014 (Daily)
12,000 Actual Peak Demand =
8,717 MW (21 May) Typhoon “Glenda”
16 Jul 2014
11,000

10,000

9,000

8,000

7,000

6,000 17 Jun 2014:


Malampaya Gas Restriction
Red Alert
5,000 Holy Week Manual Load Dropped: 105 MW 8-11 Sep 2014
Natural Gas restriction
25 Jun 2014: Limited Capacity of Ilijan Gas plant
4,000 Outages of Sual 1 (647 MW), Calaca 1 (300 MW), Masinloc
2 (315 MW), derated capability of GN power 1&2
30 Aug - 28 Sep 2014
Sual Unit 2 (647 MW) Maintenance
12 -13 Jul 2014
3,000
PIGging, Ilijan Pipeline 26 Sep – 25 Oct 2014
Limited Capacity of Ilijan Gas plant Sual Unit 1 (647 MW) Maintenance

2,000
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
January February March April May June July August September October

Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve
Source: NGCP Daily Operations Report
LUZON SUPPLY-DEMAND OUTLOOK 2014-2020
2014 2015 2016 2017
Nov: 19 MW NWPDC Wind Ph3* Mar : 150 MW SLPGC Coal U1 Jan: 12 MW Green Innov Bio Nov: 420 MW Pagbilao 3
87 MW Burgos Wind Ph1* 18 MW IBEC Bio Mar: 450 MW San Gabriel NG
81 Caparispisan Wind* Jun: 150 MW SLPGC Coal U2 May: 150 MW Limay Coal U1 2018
Dec: 135 MW SLTEC Puting Bato U1* 13 MW Sabangan HEPP Sep: 150 MW Limay Coal U2 Jun: 460 MW SBPL**
10 MW Pampanga Solar Jul: 67.5 MW Pililia Wind
63 MW Burgos Wind Ph2* Oct: 82 MW Anda Coal
24 MW SCJIpower Bio Nov: 150 MW SLTEC Puting Bato Coal U2
7.5 MW Bataan Cogen Dec: 4 MW Bicol Biomass

Actual

Notes
a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement
b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 7
percent GDP growth rate (GR) target for 2014-2015.
c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 8
percent GDP growth rate (GR) target for 2016-2020.
d. Assumed average forced outage of the total available capacity * On-going testing and commissioning
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ** Upon Secretary’s consideration
(%) 5.3 6.2 6.3 4.9 7.7 7.0 6.3 4.7 5.5 8.2 5.89 5.6 Note: 100 MW Avion and 40 MW Majestics considered as additional
MW 677 794 801 621 983 888 800 601 708 1041 738 716 capacity (not in the committed power projects)
LUZON GRID COMMITTED POWER PROJECTS (2,682.1 MW)
Target Testing & Target Commercial
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Commissioning Operation
Bangui Bay Wind Power Project NorthWind Power NorthWind Power
Bangui, Ilocos Norte 18.9 Sep-2014 Nov-2014
(Phase 3) Development Corporation Development Corporation
Burgos Wind Power Project EDC Burgos Wind Power Energy Development Nagsurot-Saoit,
87.0 Nov-2014 Nov-2014
(Phase 1) Corporation Corporation (EDC) Burgos, Ilocos Norte
Brgy. Caparispisan,
Northern Luzon UPC Asia
Caparispisan Wind Energy Project UPC Asia Corporation Pagudpud, Ilocos 81.0 Nov-2014 Nov-2014
Corporation
Norte
Trans Asia Oil and Energy Brgy. Puting Bato
135 MW Puting Bato Coal Fired South Luzon Thermal
Development Corporation West, Calaca, 135.0 Oct 2014 Dec-2014
Power Plant Phase I Energy Corp. (SLTEC)
(TAOil) Batangas
Brgy. Suclaban,
Pampanga Solar Power Project Raslag Corporation Raslag Corporation 10.0 Dec 2014 Dec 2014
Mexico, Pampanga
Burgos Wind Power Project EDC Burgos Wind Power Energy Development Nagsurot-Saoit,
63.0 Dec 2014 Dec 2014
(Phase 2) Corporation Corporation (EDC) Burgos, Ilocos Norte
12 MW SJCiPower Rice Husk-Fired
San Jose City I Power San Jose City I Power Brgy. Tulat, San
Biomass power Plant Project 10.0 Dec 2014 Dec 2014
Corporation Corporation Jose, Nueva Ecija
Phase 1
12 MW SJCiPower Rice Husk-Fired
San Jose City I Power San Jose City I Power Brgy. Tulat, San
Biomass power Plant Project 10.0 Dec 2014 Dec 2014
Corporation Corporation Jose, Nueva Ecija
Phase 2
12.5 MW Bataan 2020 Rice hull-
Bataan 2020 Inc. Bataan 2020 Inc. Bataan 7.5 Oct 2014 Dec 2014
fired Cogen Plant
Southwest Luzon Power
150 MW SLPGC Coal-Fired Power Brgy. San Rafael,
Generation Corporation DMCI Power Corporation 150.0 Dec-2014 Mar-2015
Plant Phase I Unit 1 Calaca, Batangas
(SLPGC)
Isabela Biomass Energy Isabela Biomass Energy
20 MW IBEC Biomass Power Plant Isabela 18.0 Mar 2015 Mar 2015
Corporation (IBEC) Corporation (IBEC)
Southwest Luzon Power
150 MW SLPGC Coal-Fired Power Brgy. San Rafael,
Generation Corporation DMCI Power Corporation 150.0 Dec-2014 Jun-2015
Plant Phase I Unit 2 Calaca, Batangas
(SLPGC)
Sabangan HEPP Hedcor Sabangan, Inc. Aboitiz Power Corporation Mt. Province 13.2 Jun 2015 Jun 2015
Pililla Wind Power Project Alternergy Wind One Brgy. Halayhayin,
Alternergy 67.5 Jul 2015 Jul 2015
(Phase 1) Corporation Pililla, Rizal

* Excluding Off-grid power projects


** New Entry from Indicative list
As of 30 September 2014
LUZON GRID COMMITTED POWER PROJECTS (2,682.1 MW)
Target Testing & Target Commercial
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Commissioning Operation

Anda Power Corporation's 82 MW Brgy. Bundagul,


Ciculating Fluidized Bed Coal Fired Anda Power Corporation Anda Power Corporation Mabalacat, 82.0 Jun 2015 Oct-2015
Power Plant Pampanga

Trans Asia Oil and Energy Brgy. Puting Bato


135 MW Puting Bato Coal Fired South Luzon Thermal
Development Corporation West, Calaca, 135.0 Oct 2014 Nov-2015
Power Plant Phase II Energy Corp. (SLTEC)
(TAOil) Batangas

3.5 MW Bicol Biomass Energy Bicol Biomass Energy Bicol Biomass Energy
Camarines Sur 3.2 Dec 2015 Dec-2015
Corporation Corporation Corporation
Green Innovations for Green Innovations for
12 MW GITC Biomass Power Plant
Tomorrow Corporation Tomorrow Corporation Nueva Ecija 10.8 Dec-2015 Jan-2016
Project
(GITC) (GITC)
First Gen Power San Gabriel,
San Gabriel Plant Phase II First Gas Power Corp. 450.0 Jan-2016 Mar 2016
Corporation Batangas
Limay Power Plant Project Phase I SMC Consolidated Power SMC Consolidated Power Brgy. Lamao, Limay,
150.0 Mar 2016 May-2016
Unit 1 Corporation Corporation Bataan
Limay Power Plant Project Phase I SMC Consolidated Power SMC Consolidated Power Brgy. Lamao, Limay,
150.0 Jul-2016 Sep-2016
Unit 2 Corporation Corporation Bataan

Pagbilao Power
Pagbilao Coal-Fired Thermal Pagbilao Energy TeaM Energy / Aboitiz Station, Nrgy.
420.0 May-2017 Nov-2017
Power Plant Corporation Power Ibabang Polo,
Pagbilao, Quezon

San Buenaventura Power Ltd. Co. San Buenaventura Power


QPPL/EGCO Mauban, Quezon 460.0 Dec-2017 Jun-2018
(SBPL) Project *** Ltd. Co. (SBPL)

TOTAL 2,682.1

* Excluding Off-grid power projects


** New Entry from Indicative list
*** by informal consideration from indicative to committed upon approval of Secretary
As of 30 September 2014
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
2 X 20 MW FDC
Camarines CFB Coal FDC Utilities, Inc. FDC Utilities, Inc. Camarines Sur 40.0 Mar 2016
Power Plant
MERALCO MGEN Power
Unit I - Oct 2016
2 X 300 MW Coal-Fired Redondo Peninsula Corporation/ Aboitiz Power Sitio Naglatore, Cawag,
600.0 Unit II - Dec 2016
Power Plant Energy, Inc. Corporation/ Taiwan Subic Bay Freeport Zone
Cogeneration Corporation
Southwest Luzon Power
2 X 150 MW SLPGC Coal- Brgy. San Rafael, Calaca, Unit I - Dec 2016
Generation Corporation DMCI Power Corporation 300.0
Fired Power Plant Phase II Batangas Unit II - Dec 2016
(Project Company)
2 X 300 MW Masinloc AES Masinloc Power AES Philippines Power Unit 3 (300 MW) - Oct 2017
Zambales 600.0
Expansion Partners Co., Inc. Partners Co., LTD. Unit 4 (300 MW) - Oct 2017
300 MW Limay Power Plant
SMC Consolidated Power SMC Consolidated Power Brgy. Lamao, Limay, Unit 1 - 150 MW - Jan 2017
Project Phase II 300.0
Corporation Corporation Bataan
(2x150MW) Unit 2 - 150 MW - Jul 2017
1x300 MW LEI Coal Power
Lucidum Energy, Inc. (LEI) Lucidum Energy, Inc. (LEI) Silanguin Bay, Zambales 300.0 Jun 2017
Plant
Limay Power Plant Project SMC Consolidated Power SMC Consolidated Power Brgy. Lamao, Limay,
300.0 Oct-17
Phase III Unit 1 Corporation Corporation Bataan
Limay Power Plant Project SMC Consolidated Power SMC Consolidated Power Brgy. Lamao, Limay,
300.0 Dec-17
Phase III Unit 2 Corporation Corporation Bataan
JGS Coal Fired Thermal Brgy. Pinamukan Ibaba,
JG Summit Holdings, Inc. JG Summit Holdings, Inc. 150.0 Unit 1 - June 2018
Power Plant Unit 1 Batangas City
JGS Coal Fired Thermal Brgy. Pinamukan Ibaba,
JG Summit Holdings, Inc. 150.0 Unit 2 - Dec 2018
Power Plant Unit 2 Batangas City
2 X 600 MW Mariveles GNPower Mariveles Coal
GNPower Ltd. Co. Mariveles, Bataan 1,200.0 Dec 2018
Expansion Project Plant Ltd. Co.
JGS Coal Fired Thermal Brgy. Pinamukan Ibaba,
JG Summit Holdings, Inc. 150.0 Unit 3 - June 2019
Power Plant Unit 3 Batangas City
JGS Coal Fired Thermal Brgy. Pinamukan Ibaba,
JG Summit Holdings, Inc. 150.0 Unit 4 - Dec 2019
Power Plant Unit 4 Batangas City
2 x 600 MW (net) Coal- Meralco PowerGen
Atimonan One Energy Atimonan, Quezon 1,200.0 Dec 2019
Fired Power Plant Corporation
TOTAL COAL 5,740.0

* Excluding Off-grid power projects


As of 30 September 2014
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Aero Derivative Combined Calamba Aero Power MERALCO MGEN Power
Calamba, Laguna 150.0 TBD
Cycle Power Plant Corporation Corporation
TOTAL OIL-BASED 150.0
Pagbilao 600 MW U1 (200 MW)- Jan 2015
Energy World Corporation Energy World Corporation Isla Grande, Pagbilao,
Combined Cycle Gas Fired 600.0 U2 (200 MW)- Dec 2015
(EWC) (EWC) Quezon Province
Power Plant* U3 (200 MW)- Dec 2016
2 x 1,200 MW Combined Limay, Bataan Unit 1 - Mar 2017
Atlantic, Gulf and Pacific
Cycle Gas Turbine Power AG&P (PNOC-AFC Industrial 2,400.0
Company of Manila, Inc Unit II - Mar 2018
Plant Project Estate)
Pilipinas Shell Petroleum
415 MW San Isidro Trans Asia Oil and Energy Trans Asia Oil and Energy Co.'s Tabangao Refinery,
Combined Cycle Gas Development Corporation Development Corporation Brgy. San Isidro and 415.0 Sep 2017
Turbine Plant Project (TAOil) (TAOil) Tabangao-Ambulong,
Batangas City
2x450 San Gabriel Power
U1 - 2017
Plant First Gen Corproration First Gen Corproration San Gabriel, Batangas 900.0
U2 - 2019
(Phase II)
TOTAL NATGAS 4,315.0
Bacman 3 (Tanawon) Energy Development Energy Development
Guinlajon, Sorsogon 40.0 Dec 2016
Geothermal Project Corporation (EDC) Corporation (EDC)
Rangas Geothermal Energy Development Energy Development
Bacon District, Sorsogon 40.0 Jun 2017
Project Corporation (EDC) Corporation (EDC)
Kayabon Geothermal Energy Development Energy Development
Manito, Albay 40.0 Dec 2019
Project Corporation (EDC) Corporation (EDC)
TOTAL GEOTHERMAL 120.0
Ibulao Hydroelectric Power
Hydrocore, Inc. Hydrocore, Inc. Lagawe, Ifugao 4.5 May 2015
Project
Dupinga Hydroelectric Constellation Energy
Exelon Corporation Gabaldon, Nueva Ecija 3.0 Oct 2015
Power Project Corporation
Sunwest Water & Electric Sunwest Water & Electric
Main Aklan Libacao, Albay 15.0 Jul 2016
Co., Inc. (SUWECO) Co., Inc. (SUWECO)
Philnew Hydro Power Philnew Hydro Power
Tinoc 2 Tinoc, Ifugao 11.0 Dec 2016
Corporation Corporation
Philnew Hydro Power Philnew Hydro Power
Tinoc 3 Tinoc, Ifugao 5.0 Jun 2017
Corporation Corporation

* Excluding Off-grid power projects


As of 30 September 2014
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Sunwest Water & Electric Sunwest Water & Electric
Pinacanauan Peñablanca, Cagayan 6.0 Jul 2017
Co., Inc. Co., Inc. (SUWECO)
Tinoc 1 Quadriver Energy Corp. Quadriver Energy Corp. Tinoc, Ifugao 4.1 Apr 2018
Philnew Hydro Power Philnew Hydro Power
Tinoc 4 Tinoc, Ifugao 5.0 Apr 2018
Corporation Corporation
Colasi Mini Hydro Electric Colasi Mini Hydro Electric
Colasi Mercedes, Camarines Norte 1.0 Feb 2019
Power Plant Corporation Power Plant Corporation
Majayjay Hydro Power Majayjay Hydro Power Majayjay,
Majayjay 2.2 Apr 2019
Company, Inc. Company, Inc. Laguna
AV Garcia Power Systems AV Garcia Power Systems
Biyao Balbalan, Kalinga 0.8 TBD
Corp Corp
Cordillera Hydro Electric Cordillera Hydro Electric
Kapangan & Kibungan,
Kapangan HEP Power Corporation Power Corporation 60.0 TBD
Benguet
(COHECO) (COHECO)
AV Garcia Power Systems
Abdao HEP Tabaan Sur, Tuba, Benguet 1.0 TBD
Corp.
Barit (Irrigation Discharge) NASCENT Technologies
Buhi, Camarines Sur 0.4 TBD
Hydroelectric Power Project Corporation

2.6 MW Maapon River Mini- Renesons Energy Renesons Energy


Brgy. Piis, Lucban, Quezon 2.6 TBD
Hydro Power Project (MHP) Corporation Corporation
TOTAL HYDRO 121.6
Currimao Solar Photovoltaic Mirae Asia Energy Mirae Asia Energy
Currimao, Ilocos Norte 20.0 Mar 2015
Power Project Corporation Corporation
Solar Philippines Solar Philippines
SM North Edsa Solar Power SM North Edsa, Quezon
Commercial Rooftop Commercial Rooftop 1.5 Mar 2015
Project City
Projects, Inc. Projects, Inc.
Energy Development Energy Development
Burgos Solar Power Project Burgos, Ilocos Norte 4.0 Jul 2015
Corporation Corporation
Macabud Solar Photovoltaic ATN Philippines Solar ATN Philippines Solar Brgy. Macabud, Rodriguez,
30.0 Feb 2016
Power Project Energy Group, Inc. Energy Group, Inc. Rizal
TOTAL SOLAR 55.5
* Excluding Off-grid power projects
As of 30 September 2014
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Northern Luzon UPC Asia Brgy. Balaoi, Pagudpud,
Balaoi Wind Power Project UPC Asia Corporation 45.0 Sep 2015
Corporation Ilocos Norte
Pasuquin East Wind Power Energy Logics Philippines, Delgado Group of
Pasuquin, Ilocos Norte 48.0 Oct 2015
Project (Phase 1) Inc. Companies
Sembrano Wind Power
Project Alternergy Sembrano Wind Mt. Sembrano, Mabitac,
Alternergy 72.0 Apr 2017
(Formerly Mabitac Wind Corporation Laguna
Power Project Phase 2)
Brgy. Balaoi and
Pagudpud Wind Power EDC Pagudpud Wind Energy Development
Caunayan, Pagudpud, 84.0 Dec 2018
Project Power Corporation Corporation
Ilocos Norte
TOTAL WIND 249.0
20 MW Waste-to-Energy
CJ Global Green Energy CJ Global Green Energy
Project using Thermal Camarines Sur 18.0 Dec 2015
Philippine Corp. Philippine Corp.
Gasifier Conversion
TOTAL BIOMASS 18.0

TOTAL 10,769.1
* Excluding Off-grid power projects
As of 30 September 2014
VISAYAS POWER SUPPLY-DEMAND SITUATION
1 JANUARY to 31 OCTOBER 2014 (Daily)
2,000 Actual Peak Demand =
1,636 MW (27 May)
1,900

1,800

1,700

1,600

1,500

1,400

1,300

1,200

PEDC 1 Forced Outage: 18-24 May 2014


1,100 PEDC 2 Forced Outage: 24-29 May 2014
CEDC 1 Forced Outage: 16-23 May 2014
Holy Week CEDC U3 Forced Outage: 28 May-3 Jun 2014
1,000 26 Jan 2014:
Earthquake in Leyte
Affected Power Plants:
900 CEDC 1 Planned Outage: 5 Jun-5 Jul 2014
Mahiao Geo (120 MW)
KSPC 1 Coal Planned Outage: 5-24 Jul 2014

800
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
January February March April May June July August September October

Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve

Source: NGCP Daily Operations Report


VISAYAS SUPPLY-DEMAND OUTLOOK 2014-2020
2014 2015 2017
Nov: 8 MW Villasiga HEP Jan: 34 MW Nabas Wind Ph1 Jun: 8 MW Cantakoy HEPP
Dec: 82 MW TPC Expansion* Sep: 16 MW Nabas Wind Ph2 34 MW VMCI Bio (TBD**)
54 MW San Lorenzo Wind Dec: 20 MW SCBiopower
46 MW URC Bio
12 MW Hpo Bagasse 2016
Jun: 135 MW Concepcion Coal 1
Nov: 135 MW Concepcion Coal 2

Actual

Notes
a. Reserve Margin (RM) i.e. 4% regulating reserve and largest online unit for contingency and dispatchable reserve requirement (100 MW
to increase by 135 MW in 2016)
b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015.
c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016-2020.
* On-going testing and commissioning
d. Assumed 4.35 percent average forced outage of the total available capacity
** TBD – To be determined (target commercial operation)
VISAYAS GRID COMMITTED POWER PROJECTS (527.0 MW)
Target Testing & Target Commercial
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Commissioning Operation
Sunwest Water & Sunwest Water &
Brgy. Igsoro,
Villasiga HEP Electric Co., Inc. Electric Co., Inc. 8.0 Sep 2014 Nov 2014
Bugasong, Antique
(SUWECO) (SUWECO)
8.0 MW HPCo Bagasse Hawaiian Philippines Hawaiian Philippines
Negros Occidental 3.0 Nov 2014 Nov 2014
Cogeneration Plant Company Company
46 MW Universal
Robina Corporation Universal Robina JG Summit Holdings
Negros Occidental 31.0 Dec 2014 Dec 2014
Bagasse Cogeneration Corporation Inc.
Facility
Trans Asia Oil and
54 MW San Lorenzo Trans-Asia Renewable San Lorenzo, Guimaras
Energy Development 54.0 Dec 2014 Dec 2014
Wind Power Project Energy Corporation Island
Corporation (TAOil)
TPC Coal-Fired Power
Toledo Power Global Business Power
Plant Expansion Toledo City, Cebu 82.0 Oct 2014 Dec 2014
Company Corporation
Project*
Nabas Wind Power Petrogreen Energy Petrogreen Energy Brgy. Pawa, Nabas,
36.0 Jan 2015 Jan 2015
Project Phase 1 Corporation Corporation Aklan
Nabas Wind Power Petrogreen Energy Petrogreen Energy Brgy. Pawa, Nabas,
14.0 Sep 2015 Sep 2015
Project Phase 2 Corporation Corporation Aklan
20 MW SCBiopower
San Carlos Biopower
Bagasse-Fired Power Bronzeoak Philippines Negros Occidental 18.0 Dec 2015 Dec 2015
Inc.
Generation Project
AC Energy Holdings,
2 X 135 MW Palm Thermal Inc./ Palm Thermal
Brgy. Nipa, U1 - Sep 2015 U1 - Jun 2016
Concepcion Coal-fired Consolidated Holdings Consolidated Holdings 270.0
Concepcion, Iloilo U2 – May 2016 U2 - Nov 2016
Power Plant Corp. Corporation/ Jin
Navitas Resource, Inc.
Cantakoy HEP Quadriver Energy Corp. Quadriver Energy Corp. Danao, Bohol 8.0 Jun 2017 Jun 2017
34 MW VMCI Bagasse-
Victorias Milling Victorias Milling
Fired Cogeneration Negros Occidental 3.0 TBD TBD
Company Inc. Company Inc.
Plant
TOTAL 527.0
* Excluding Off-grid power projects
** New Entry from Indicative list As of 30 September 2014
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Panay Energy
PEDC Expansion Project
Development Corporation
Former report (1x150 Global Business Power Brgy. Ingore, La Paz,
150.0 May 2016
MW Circulating Fluidized (Global Business Power Corporation Iloilo
Bed (CFB) Coal-Fired Corporation)
Power Plant)
1 X 20 MW FDC Danao
FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016
CFB Coal Power Plant
300 MW Therma Visayas Aboitiz Power Brgy. Bato, Toledo City,
Therma Visayas Inc. 300.0 Mar 2017
Energy Project Corporation Cebu
TOTAL COAL 470.0
Energreen Power
18.9MW Calumangan Brgy. Calumangan, Bago
Development & 18.9 Dec 2014
Diesel Power Plant City, Negros Occidental
Management, Inc.
TOTAL OIL-BASED 18.9
49 MW Biliran Biliran Geothermal Orka Energy Philippines
Biliran, Biliran 49.0 Dec 2015
Geothermal Plant Project Incorporated (Iceland)
Dauin Geothermal Energy Development Energy Development
Dauin, Negros Oriental 40.0 Dec 2021
Project Corporation (EDC) Corporation (EDC)
Southern Leyte
Geothermal Plant
Energy Development Energy Development
Geothermal Project Cabalian, Southern Leyte TBA TBA
Corporation Corporation (EDC)
(formerly known as Mt.
Cabalian Geothermal)
TOTAL GEOTHERMAL 89.0
Leyte Solar Photovoltaic Phil. Solar Farm-Leyte, Phil. Solar Farm-Leyte,
Ormoc City, Leyte 30.0 Jan 2015
Power Project Inc. Inc.
San Carlos Solar Power
Project San Carlos Solar Energy San Carlos City, Negros
30.0 Feb 2015
Phase C-10 Inc. Occidental
Phase D-13
Cadiz Solar Power Phil.Power Exploration & Brgy., Tinampa-an Cadiz
100.0 Jul 2015
Project Development Corporation City, Negros Occidental
TOTAL SOLAR 160.0

As of 30 September 2014
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Panay Energy
PEDC Expansion Project
Development Corporation
Former report (1x150 Global Business Power Brgy. Ingore, La Paz,
150.0 May 2016
MW Circulating Fluidized (Global Business Power Corporation Iloilo
Bed (CFB) Coal-Fired Corporation)
Power Plant)
1 X 20 MW FDC Danao
FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016
CFB Coal Power Plant
300 MW Therma Visayas Aboitiz Power Brgy. Bato, Toledo City,
Therma Visayas Inc. 300.0 Mar 2017
Energy Project Corporation Cebu
TOTAL COAL 470.0
Energreen Power
18.9MW Calumangan Brgy. Calumangan, Bago
Development & 18.9 Dec 2014
Diesel Power Plant City, Negros Occidental
Management, Inc.
TOTAL OIL-BASED 18.9
49 MW Biliran Biliran Geothermal Orka Energy Philippines
Biliran, Biliran 49.0 Dec 2015
Geothermal Plant Project Incorporated (Iceland)
Dauin Geothermal Energy Development Energy Development
Dauin, Negros Oriental 40.0 Dec 2021
Project Corporation (EDC) Corporation (EDC)
Southern Leyte
Geothermal Plant
Energy Development Energy Development
Geothermal Project Cabalian, Southern Leyte TBA TBA
Corporation Corporation (EDC)
(formerly known as Mt.
Cabalian Geothermal)
TOTAL GEOTHERMAL 89.0
Leyte Solar Photovoltaic Phil. Solar Farm-Leyte, Phil. Solar Farm-Leyte,
Ormoc City, Leyte 30.0 Jan 2015
Power Project Inc. Inc.
San Carlos Solar Power
Project San Carlos Solar Energy San Carlos City, Negros
30.0 Feb 2015
Phase C-10 Inc. Occidental
Phase D-13
Cadiz Solar Power Phil.Power Exploration & Brgy., Tinampa-an Cadiz
100.0 Jul 2015
Project Development Corporation City, Negros Occidental
TOTAL SOLAR 160.0

As of 30 September 2014
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Pulupandan Wind Power First Maxpower International First Maxpower International Pulupandan, Negros
50.0 Sep 2015
Project Corporation Corporation Occidental
TOTAL WIND 50.0
Igbulo (Bais) Hydroelectric Century Peak Energy Century Peak Metals
Igbaras, Iloilo 5.1 Jan 2015
Power Project Corporation Holdings Corp
Century Peak Energy Century Peak Metals Kabankalan, Negros
Hilabangan (Upper Cascade) 4.8 Aug 2015
Corporation Holdings Corp Occidental
Century Peak Energy Century Peak Metals Kabankalan, Negros
Hilabangan (Lower Cascade) 3.0 Aug 2015
Corporation Holdings Corp Occidental
Century Peak Energy Century Peak Metals
Maninila (Lower Cascade) San Remigio, Antique 4.5 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Maninila (Upper Cascade) San Remigio, Antique 3.1 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Sibalom (Upper Cascade) San Remigio, Antique 4.2 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Sibalom (Middle Cascade) San Remigio, Antique 4.0 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Sibalom (Lower Cascade) San Remigio, Antique 3.3 Oct 2016
Corporation Holdings Corp
Meadowland Developers,
Basak II Badian, Cebu 0.5 Apr 2017
Inc.
Timbaban Hydroelectric Oriental Energy and Power Oriental Peninsula
Madalag, Aklan 18.0 Aug 2017
Power Project Generation Corporation Resources Group Inc (ORE)
Main Aklan River Sunwest Water & Electric
Libacao, Aklan 15.0 TBD
Hydroelectric Power Project Company, Inc.
Natural Power Sources
Amlan (Plant A) Amlan, Negros Oriental 3.2 TBD
Integration, Inc.
Natural Power Sources
Amlan (Plant B) Amlan, Negros Oriental 1.5 TBD
Integration, Inc.
Natural Power Sources
Amlan (Plant C) Amlan, Negros Oriental 0.8 TBD
Integration, Inc.
Loboc Hydro Power Project Sta Clara Power Corporation Sta Clara Int’l Corporation Loboc, Bohol 1.2 TBD
TOTAL HYDRO 72.2
South Negros 25 MW Brgy. Cubay, La Carlota City,
South Negros Biopower Inc. 22.4 Dec 2016
Biomass Power Plant Negros Occidental
35.0 MW Mina Multi-Fuel
Green Power Panay Phils.,
Biomass Power Generation Iloilo 32.0 TBD
Inc.
Facility
TOTAL BIOMASS 54.4
40 MW Battery Storage AES Philippines Power AES Philippines Power Kabankalan, Negros
40.0 Mar 2015
Project Partners Co., LTD. Partners Co., LTD. Occidental
TOTAL BATTERY 40.0

TOTAL 954.5
As of 30 September 2014
MINDANAO POWER SUPPLY-DEMAND SITUATION
1 JANUARY to 31 OCTOBER 2014 (Daily)
2,000

1,900

1,800
2014 Actual Peak Demand =
1,444 MW (22 Oct)
1,700

1,600

1,500

1,400

1,300

1,200

1,100

Restoration of 200 MW MCF


1,000 Unit 2 : 8 May 2014
Unit 1 : 1 June 2014
900
27 Feb 2014
800 Mindanao Blackout
Affected Power Plant Holy Week
200 MW Mindanao Coal-fired (MCF)
700

600
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
January February March April May June July August September October
Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve

Source: NGCP Daily Operations Report


MINDANAO SUPPLY-DEMAND OUTLOOK 2014-2020
2014 2016 2017
Nov: 15 MW MEGC DPP* Feb: 150 MW SMC Davao U1 Jan: 9 MW Limbatangon HEPP
21 MW Peak Power PSI Mar: 25 MW Lake Mainit Jul: 30 MW Puyo HEP
5.2 MW Peak Power PSFI Jun: 135 MW FDC Coal U1 Dec: 540 MW GNPower Kauswagan
Jul: 150 MW SMC Davao U2 5 MW Asiga HEPP (TBD**)
2015 Sep: 135 MW FDC Coal U2 3 MW PTCI Bio (TBD**)
Mar: 150 MW Therma South 1 Dec: 135 MW FDC Coal U3
Jun: 150 MW Therma South 2 10 MW Malaybalay Bio
Sep: 2 x 100 MW SEC Coal
Dec: 15 MW LPC Bio

Actual

Notes
a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement
b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015.
c. 12.8 % peak demand growth rate resulted from observed 1.6 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016
d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2017-2020 * On-going testing and commissioning
e. Assumed 3.3 percent average forced outage of the total dependable capacity ** TBD – To be determined (target commercial operation)
MINDANAO GRID COMMITTED POWER PROJECTS (1,870MW)
Mother/ JV Rated Capacity Target Testing & Target Commercial
Name of the Project Project Proponent Location
Company (MW) Commissioning Operation
Mapalad Energy
15 MW MEGC Diesel Power Mapalad, Dalipuga, Iligan
Generating 15.0 Oct 2014 Nov 2014
Plant City
Corporation (MEGC)
Peak Power Peak Power Energy National Highway,
3x6.97 PSI MW Bunker-Fired
Soccsargen, Inc. Inc. (subsidiary of A Brgy.Apopong, General 20.9 Sep 2014 Nov 2014
Power Plant
(PSI) Brown) Santos City
ASELCO Compound,
Peak Power Energy
1x5.2 MW PSFI Bunker-Fired Peak Power San Brgy. San Isidro,San
Inc. (subsidiary of A 5.2 Sep 2014 Nov 2014
Power Plant Francisco (PSFI) Francisco, Agusan del
Brown)
Sur
Brgy. Binugao, Toril,
2 X 150 MW Coal-Fired Therma Aboitiz Power Davao City and Brgy. U1 – Nov 2014 U2 – Nov U1 – Mar 2015 U2 –
Therma South Inc. 300.0
South Energy Project Corporation Inawayan, Sta. Cruz, 2014 Jun 2015
Davao Del Sur

Southern Mindanao Coal Fired Sarangani Energy Alsons Power Brgy, Kamanga, Maasim, Unit 1 Sep 2015
100.0 Feb 2015
Power Station Unit 1 Corporation Corporation Sarangani

San Miguel San Miguel


SMC Davao Power Plant Project Brgy. Culaman, Malita,
Consolidated Power Consolidated Power 150.0 U1 - Jul 2015 U1 - Dec 2015
Phase I Unit 1 Davao del Sur
Corporation Corporation
15 MW LPC Biomass Power Lamsan Power Lamsan Power
Maguindanao 10.0 Dec 2015 Feb 2016
Plant Project Corporation Corporation
Agusan Power Jabonga, Agusan del
Lake Mainit Tranzen Group Inc. 25.0 Mar 2016 May 2016
Corporation Norte
San Miguel San Miguel
SMC Davao Power Plant Project Brgy. Culaman, Malita,
Consolidated Power Consolidated Power 150.0 U2 - May 2016 U2 - Jul 2016
Phase I Unit 2 Davao del Sur
Corporation Corporation
3 X 135 MW FDC-Misamis Phividec Industrial U1 – Dec 2015 U1 – Jun 2016
Circulating Fluidized Bed (CFB) FDC Utilities, Inc. FDC Utilities, Inc. Estate, Villanueva, 405.0 U2 – Mar 2016 U2 – Sep 2016
Coal-Fired Power Plant Project Misamis Oriental U3 – Jun 2016 U3 – Dec 2016

Southern Mindanao Coal Fired Sarangani Energy Alsons Power Brgy, Kamanga, Maasim,
100.0 Feb 2015 Nov-16
Power Station Unit 2 Corporation Corporation Sarangani

10 MW Malaybalay Bio-Energy Malaybalay Malaybalay


FIBECO, Anahawan,
Corporation Multi Feedstock Bioenergy Bioenergy 9.0 Dec 2016 Dec 2016
maramag, Bukidnon
Power Generating Facility Corporation Corporation
* Excluding Off-grid power projects
As of 30 September 2014
** New Entry from Indicative list
MINDANAO GRID COMMITTED POWER PROJECTS (1,870MW)
MW
Name of the Project Project Proponent
Mother/ JV
Company
Location
Rated Capacity
(MW)
Target Testing &
Commissioning
Target Commercial
Operation

Turbines Resource Turbines Resources


Limbatangon Hydroelectric Cagayan de Oro City,
& Development and Development 9.0 Jan 2017 Mar 2017
Power Project Misamis Oriental
Corp. Corp. (TRDC)

Puyo Hydroelectric Power First Gen Mindanao First Gen Power Jabonga, Agusan del
30.0 Jul 2017 Jul 2017
Project Hydropower Corp. Corporation Norte

GNPower Kauswagan Ltd.


GN Power Kauswagan, Lanao del
540MW Clean Coal-Fired GN Power Ltd. Co. 540.0 Feb 2017 Dec 2017
Kausawagan Norte
Power Plant

3 MW Biomass Cogeneration Philippine Trade Philippine Trade


Maguindanao 1.6 TBD TBD
Facility Center, Inc. Center, Inc.

TOTAL 1,870.7
* Excluding Off-grid power projects
As of 30 September 2014
** New Entry from Indicative list
MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8MW)

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning

Davao del Norte 20 MW


Circulating Fluidized Bed
FDC Utilities, Inc. FDC Utilities, Inc. Maco, Davao del Norte 20.0 Mar 2015
Biomass-Coal Fired Thermal
Power Plant

ZAM 100 MW Circulating


Sitio San Ramon, Bgry.
Fluidized Bed (CFB) Coal- San Ramon Power Inc. Mapalad Power Corporation 100.0 Dec 2015
Talisayan, Zamboanga City
Fired Power Station
150 MW - Jan 2016
600 MW SMC Davao Power San Miguel Consolidated San Miguel Consolidated Brgy. Culaman, Malita, Davao
600.0 150 MW - Jun 2016
Plant Project Phase III Power Corporation Power Corporation del Sur
300 MW - Dec 2018
Philippine National Oil Philippine National Oil
Sibuguey Power Plant Project Sibugay, Zamboanga 100.0 Sep 2016
Company (PNOC-EC) Company (PNOC)

2x55 MW Balingasag
Thermal Power Plant
Brgy. Mandangoa,
(Circulating Fluidized Bed Minergy Coal Corporation Minergy 110.0 Jan 2017
Balingasag, Misamis Oriental
Combustion (CFBC) Coal-
Fired Power Plant Plant)

300 MW Coal Fired Power


Plant Ozamiz Power Generation, Brgy. Pulot,Ozamiz Phase 1 - Mar 2018 Phase 2 - Dec
300.0
Phase 1 - 2 x 100MW Inc. City,Misamis Occidental 2018
Phase 2 - 1 x 100MW
300 MW SMC Davao Power San Miguel Consolidated San Miguel Consolidated Brgy. Culaman, Malita, Davao
300.0 Dec 2018
Plant Project Phase II Power Corporation Power Corporation del Sur
TOTAL COAL 1,530.0
Energy Development Energy Development
Mindanao 3 Geothermal Kidapawan, North Cotabato 50.0 Dec 2017
Corporation Corporation
TOTAL GEO 50.0
First Gen Mindanao Impasugong & Sumilao,
Tagoloan Hydropower First Gen Power Corporation 39.0 Oct 2015
Hydropower Corp. Bukidnon
Bubunawan Hydroelectric First Gen Mindanao Baungon and Libona,
First Gen Power Corporation 23.0 Oct 2015
Power Project Hydropower Corp. Bukidnon
Tumalaong Hydroelectric First Gen Mindanao
First Gen Power Corporation Baungon, Bukidnon 9.0 Oct 2015
Power Project Hydropower Corp.

As of 30 September 2014
MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Cabadbaran Hydroelectric First Gen Mindanao First Gen Power Cabadbaran, Agusan del
9.8 Dec 2015
Power Project Hydropower Corp. Corporation Norte
Euro Hydro Power (Asia) New Bataan, Compostela
New Bataan 2.4 Jan 2017
Holdings, Inc. Valley
Pasonanca Philcarbon, Inc. Philcarbon, Inc. Zamboanga City 0.1 Mar 2017
Culaman Hydroelectric Oriental Energy and Power Oriental Energy and Power
Manolo Fortich, Bukidnon 10.0 Jun 2018
Power Project Generation Corporation Generation Corporation
Mangima Hydroelectric Philnew Hydro Power
Manolo Fortich, Bukidnon 10.0 TBD
Power Project Corporation
Philnew Hydro Power
Clarin Clarin, Misamis Occidental 5.0 TBD
Corporation
Philnew Hydro Power
Mat-i-I Claveria, Cagayan de Oro 2.0 TBD
Corporation
Philnew Hydro Power Cagayan de Oro, Misamis
Mat-i-2 4.0 TBD
Corporation Oriental
Philnew Hydro Power Cagayan de Oro, Misamis
Mat-i-3 4.0 TBD
Corporation Oriental
TOTAL HYDRO 118.3
Centralla Solar Power NV Vogt Philippines Solar Brgy. Centralla, Surallah,
6.3 Mar 2015
Project Energy One, Inc. South Cotabato
Brgy.
Kirahon Solar Power Kirahon Solar Energy
Kirahon,Villanueva,Misamis 12.5 May 2015
Project Phase 1 Corporation
Oriental
Digos Solar Photovoltaic Enfinity Philippines
Enfinity Digos City, Davao del Sur 10.0 Oct 2015
Power Project Renewable Resources, Inc.
TOTAL SOLAR 28.8
12 MW Biomass Power Misamis Oriental Bio- Misamis Oriental Bio-
Misamis Oriental 10.8 Dec 2015
Plant Project Energy Corporations Energy Corporations
10MW Kalilangan Bio-
Energy Corporation Multi- Kalilangan Bio-Energy
Bukidnon 9.0 Dec 2016
Feedstock Power Corporation
Generating Facility
10MW Don Carlos Bio-
Energy Corporation Multi- Don Carlos Bio-Energy
Bukidnon 9.0 Dec 2016
Feedstock Power Corporations
Generating Facility
TOTAL BIOMASS 28.8

TOTAL 1,755.8
As of 30 September 2014
Measures Undertaken to Address Power Supply Issues

• Introduced Interruptible Load Program (ILP)


• Implemented Modular Genset Program in Mindanao
• Implemented Interim Mindanao Electricity Market (IMEM)
• Managed Maintenance Program of Generation Facilities jointly with NGCP
(GOMP)
• Increased Institutional/Technical Capacities of DUs in Formulating Distribution
Development Planning
• Created Task Force on Electricity
• Developed Policy on Demand Aggregation and Supply Auctioning
• Institutional strengthening through more aggressive information Education and
Communication Campaign on developments in the power industry, energy
programs and projects including energy efficiency
• More aggressive Energy Efficiency and Conservation Programs
Energy Efficiency Roadmap for the Philippines, 2014-2030

Energy Savings over


Short Term (2014-15) Medium Term (2016-20) LongTerm (2021-30) baseline (by 2030)

Savings of approx. 10,665 KTOE p.a. (one-third of current demand) by 2030


Decreased energy consumption of 1.6% per year against baseline forecasts
• Link existing training projects • Develop standards for motors • Review inward investment rules
with ESCO capacity building • Facilitate example models for EE to remove distortions

40% reduction in energy intensity compared to 2010 baseline


Industry • Develop sectoral focus programs including ESCOs, finance 15
to facilitate EE in energy intensive • Implement demand response
industries (e.g. cement and programs %
construction, sugar) • Review of energy pricing

• Enforceable minimum energy • Develop role of utilities as key • Towards energy efficient
standards for appliances, with a implementation partners and housing precincts
Residential focus on space cooling and information providers • inclusion of residential measures 20

2030 Objectives:
Buildings refrigeration • Specific EE programs for low- in Building Code
• Building envelope measures – income households %
cool roofs and insulation

• Reformulate group to oversee • EE measures for inclusion in • Incentive funds in place for EE,
EE measures in Building Code national building code including private financiers
Commercial • Retro-commissioning program • Government demonstration • Mandatory disclosure of 25
Buildings for existing buildings retrofits to showcase ESCOs and commercial building performance
• Benchmarking and ratings for financing models %
building information and reporting • Promote green building ratings

• Support passage of Enercon • National strategy for efficiency • Energy Efficiency and
Bill in power supply sector Conservation Center mandated
Cross- • Establish EE database, data • Stronger coordination with other and established
Sectoral collection regime, M&E framework levels of government (LGUs)
• Establish enforcement regimes • Regular reporting and
• Strengthen ESCO capacity monitoring to commence
• Continue awareness-raising
Sending market signals to provide incentives for EE
Strengthening existing policy, advocacy, programs and institutional structures
Harnessing private sector / partner finance
Enabling innovation and new technologies