VISAYAS
FUEL TYPE Capacity (MW) Percent Share (%) Coal
Installed Dependable Installed Dependable 31.97 Oil Based
38.30
Coal 806 777 31.97 35.97 Diesel
MINDANAO 10.79
10,000
9,000
8,000
7,000
2,000
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
January February March April May June July August September October
Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve
Source: NGCP Daily Operations Report
LUZON SUPPLY-DEMAND OUTLOOK 2014-2020
2014 2015 2016 2017
Nov: 19 MW NWPDC Wind Ph3* Mar : 150 MW SLPGC Coal U1 Jan: 12 MW Green Innov Bio Nov: 420 MW Pagbilao 3
87 MW Burgos Wind Ph1* 18 MW IBEC Bio Mar: 450 MW San Gabriel NG
81 Caparispisan Wind* Jun: 150 MW SLPGC Coal U2 May: 150 MW Limay Coal U1 2018
Dec: 135 MW SLTEC Puting Bato U1* 13 MW Sabangan HEPP Sep: 150 MW Limay Coal U2 Jun: 460 MW SBPL**
10 MW Pampanga Solar Jul: 67.5 MW Pililia Wind
63 MW Burgos Wind Ph2* Oct: 82 MW Anda Coal
24 MW SCJIpower Bio Nov: 150 MW SLTEC Puting Bato Coal U2
7.5 MW Bataan Cogen Dec: 4 MW Bicol Biomass
Actual
Notes
a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement
b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 7
percent GDP growth rate (GR) target for 2014-2015.
c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 8
percent GDP growth rate (GR) target for 2016-2020.
d. Assumed average forced outage of the total available capacity * On-going testing and commissioning
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ** Upon Secretary’s consideration
(%) 5.3 6.2 6.3 4.9 7.7 7.0 6.3 4.7 5.5 8.2 5.89 5.6 Note: 100 MW Avion and 40 MW Majestics considered as additional
MW 677 794 801 621 983 888 800 601 708 1041 738 716 capacity (not in the committed power projects)
LUZON GRID COMMITTED POWER PROJECTS (2,682.1 MW)
Target Testing & Target Commercial
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Commissioning Operation
Bangui Bay Wind Power Project NorthWind Power NorthWind Power
Bangui, Ilocos Norte 18.9 Sep-2014 Nov-2014
(Phase 3) Development Corporation Development Corporation
Burgos Wind Power Project EDC Burgos Wind Power Energy Development Nagsurot-Saoit,
87.0 Nov-2014 Nov-2014
(Phase 1) Corporation Corporation (EDC) Burgos, Ilocos Norte
Brgy. Caparispisan,
Northern Luzon UPC Asia
Caparispisan Wind Energy Project UPC Asia Corporation Pagudpud, Ilocos 81.0 Nov-2014 Nov-2014
Corporation
Norte
Trans Asia Oil and Energy Brgy. Puting Bato
135 MW Puting Bato Coal Fired South Luzon Thermal
Development Corporation West, Calaca, 135.0 Oct 2014 Dec-2014
Power Plant Phase I Energy Corp. (SLTEC)
(TAOil) Batangas
Brgy. Suclaban,
Pampanga Solar Power Project Raslag Corporation Raslag Corporation 10.0 Dec 2014 Dec 2014
Mexico, Pampanga
Burgos Wind Power Project EDC Burgos Wind Power Energy Development Nagsurot-Saoit,
63.0 Dec 2014 Dec 2014
(Phase 2) Corporation Corporation (EDC) Burgos, Ilocos Norte
12 MW SJCiPower Rice Husk-Fired
San Jose City I Power San Jose City I Power Brgy. Tulat, San
Biomass power Plant Project 10.0 Dec 2014 Dec 2014
Corporation Corporation Jose, Nueva Ecija
Phase 1
12 MW SJCiPower Rice Husk-Fired
San Jose City I Power San Jose City I Power Brgy. Tulat, San
Biomass power Plant Project 10.0 Dec 2014 Dec 2014
Corporation Corporation Jose, Nueva Ecija
Phase 2
12.5 MW Bataan 2020 Rice hull-
Bataan 2020 Inc. Bataan 2020 Inc. Bataan 7.5 Oct 2014 Dec 2014
fired Cogen Plant
Southwest Luzon Power
150 MW SLPGC Coal-Fired Power Brgy. San Rafael,
Generation Corporation DMCI Power Corporation 150.0 Dec-2014 Mar-2015
Plant Phase I Unit 1 Calaca, Batangas
(SLPGC)
Isabela Biomass Energy Isabela Biomass Energy
20 MW IBEC Biomass Power Plant Isabela 18.0 Mar 2015 Mar 2015
Corporation (IBEC) Corporation (IBEC)
Southwest Luzon Power
150 MW SLPGC Coal-Fired Power Brgy. San Rafael,
Generation Corporation DMCI Power Corporation 150.0 Dec-2014 Jun-2015
Plant Phase I Unit 2 Calaca, Batangas
(SLPGC)
Sabangan HEPP Hedcor Sabangan, Inc. Aboitiz Power Corporation Mt. Province 13.2 Jun 2015 Jun 2015
Pililla Wind Power Project Alternergy Wind One Brgy. Halayhayin,
Alternergy 67.5 Jul 2015 Jul 2015
(Phase 1) Corporation Pililla, Rizal
3.5 MW Bicol Biomass Energy Bicol Biomass Energy Bicol Biomass Energy
Camarines Sur 3.2 Dec 2015 Dec-2015
Corporation Corporation Corporation
Green Innovations for Green Innovations for
12 MW GITC Biomass Power Plant
Tomorrow Corporation Tomorrow Corporation Nueva Ecija 10.8 Dec-2015 Jan-2016
Project
(GITC) (GITC)
First Gen Power San Gabriel,
San Gabriel Plant Phase II First Gas Power Corp. 450.0 Jan-2016 Mar 2016
Corporation Batangas
Limay Power Plant Project Phase I SMC Consolidated Power SMC Consolidated Power Brgy. Lamao, Limay,
150.0 Mar 2016 May-2016
Unit 1 Corporation Corporation Bataan
Limay Power Plant Project Phase I SMC Consolidated Power SMC Consolidated Power Brgy. Lamao, Limay,
150.0 Jul-2016 Sep-2016
Unit 2 Corporation Corporation Bataan
Pagbilao Power
Pagbilao Coal-Fired Thermal Pagbilao Energy TeaM Energy / Aboitiz Station, Nrgy.
420.0 May-2017 Nov-2017
Power Plant Corporation Power Ibabang Polo,
Pagbilao, Quezon
TOTAL 2,682.1
TOTAL 10,769.1
* Excluding Off-grid power projects
As of 30 September 2014
VISAYAS POWER SUPPLY-DEMAND SITUATION
1 JANUARY to 31 OCTOBER 2014 (Daily)
2,000 Actual Peak Demand =
1,636 MW (27 May)
1,900
1,800
1,700
1,600
1,500
1,400
1,300
1,200
800
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
January February March April May June July August September October
Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve
Actual
Notes
a. Reserve Margin (RM) i.e. 4% regulating reserve and largest online unit for contingency and dispatchable reserve requirement (100 MW
to increase by 135 MW in 2016)
b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015.
c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016-2020.
* On-going testing and commissioning
d. Assumed 4.35 percent average forced outage of the total available capacity
** TBD – To be determined (target commercial operation)
VISAYAS GRID COMMITTED POWER PROJECTS (527.0 MW)
Target Testing & Target Commercial
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Commissioning Operation
Sunwest Water & Sunwest Water &
Brgy. Igsoro,
Villasiga HEP Electric Co., Inc. Electric Co., Inc. 8.0 Sep 2014 Nov 2014
Bugasong, Antique
(SUWECO) (SUWECO)
8.0 MW HPCo Bagasse Hawaiian Philippines Hawaiian Philippines
Negros Occidental 3.0 Nov 2014 Nov 2014
Cogeneration Plant Company Company
46 MW Universal
Robina Corporation Universal Robina JG Summit Holdings
Negros Occidental 31.0 Dec 2014 Dec 2014
Bagasse Cogeneration Corporation Inc.
Facility
Trans Asia Oil and
54 MW San Lorenzo Trans-Asia Renewable San Lorenzo, Guimaras
Energy Development 54.0 Dec 2014 Dec 2014
Wind Power Project Energy Corporation Island
Corporation (TAOil)
TPC Coal-Fired Power
Toledo Power Global Business Power
Plant Expansion Toledo City, Cebu 82.0 Oct 2014 Dec 2014
Company Corporation
Project*
Nabas Wind Power Petrogreen Energy Petrogreen Energy Brgy. Pawa, Nabas,
36.0 Jan 2015 Jan 2015
Project Phase 1 Corporation Corporation Aklan
Nabas Wind Power Petrogreen Energy Petrogreen Energy Brgy. Pawa, Nabas,
14.0 Sep 2015 Sep 2015
Project Phase 2 Corporation Corporation Aklan
20 MW SCBiopower
San Carlos Biopower
Bagasse-Fired Power Bronzeoak Philippines Negros Occidental 18.0 Dec 2015 Dec 2015
Inc.
Generation Project
AC Energy Holdings,
2 X 135 MW Palm Thermal Inc./ Palm Thermal
Brgy. Nipa, U1 - Sep 2015 U1 - Jun 2016
Concepcion Coal-fired Consolidated Holdings Consolidated Holdings 270.0
Concepcion, Iloilo U2 – May 2016 U2 - Nov 2016
Power Plant Corp. Corporation/ Jin
Navitas Resource, Inc.
Cantakoy HEP Quadriver Energy Corp. Quadriver Energy Corp. Danao, Bohol 8.0 Jun 2017 Jun 2017
34 MW VMCI Bagasse-
Victorias Milling Victorias Milling
Fired Cogeneration Negros Occidental 3.0 TBD TBD
Company Inc. Company Inc.
Plant
TOTAL 527.0
* Excluding Off-grid power projects
** New Entry from Indicative list As of 30 September 2014
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Panay Energy
PEDC Expansion Project
Development Corporation
Former report (1x150 Global Business Power Brgy. Ingore, La Paz,
150.0 May 2016
MW Circulating Fluidized (Global Business Power Corporation Iloilo
Bed (CFB) Coal-Fired Corporation)
Power Plant)
1 X 20 MW FDC Danao
FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016
CFB Coal Power Plant
300 MW Therma Visayas Aboitiz Power Brgy. Bato, Toledo City,
Therma Visayas Inc. 300.0 Mar 2017
Energy Project Corporation Cebu
TOTAL COAL 470.0
Energreen Power
18.9MW Calumangan Brgy. Calumangan, Bago
Development & 18.9 Dec 2014
Diesel Power Plant City, Negros Occidental
Management, Inc.
TOTAL OIL-BASED 18.9
49 MW Biliran Biliran Geothermal Orka Energy Philippines
Biliran, Biliran 49.0 Dec 2015
Geothermal Plant Project Incorporated (Iceland)
Dauin Geothermal Energy Development Energy Development
Dauin, Negros Oriental 40.0 Dec 2021
Project Corporation (EDC) Corporation (EDC)
Southern Leyte
Geothermal Plant
Energy Development Energy Development
Geothermal Project Cabalian, Southern Leyte TBA TBA
Corporation Corporation (EDC)
(formerly known as Mt.
Cabalian Geothermal)
TOTAL GEOTHERMAL 89.0
Leyte Solar Photovoltaic Phil. Solar Farm-Leyte, Phil. Solar Farm-Leyte,
Ormoc City, Leyte 30.0 Jan 2015
Power Project Inc. Inc.
San Carlos Solar Power
Project San Carlos Solar Energy San Carlos City, Negros
30.0 Feb 2015
Phase C-10 Inc. Occidental
Phase D-13
Cadiz Solar Power Phil.Power Exploration & Brgy., Tinampa-an Cadiz
100.0 Jul 2015
Project Development Corporation City, Negros Occidental
TOTAL SOLAR 160.0
As of 30 September 2014
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Panay Energy
PEDC Expansion Project
Development Corporation
Former report (1x150 Global Business Power Brgy. Ingore, La Paz,
150.0 May 2016
MW Circulating Fluidized (Global Business Power Corporation Iloilo
Bed (CFB) Coal-Fired Corporation)
Power Plant)
1 X 20 MW FDC Danao
FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016
CFB Coal Power Plant
300 MW Therma Visayas Aboitiz Power Brgy. Bato, Toledo City,
Therma Visayas Inc. 300.0 Mar 2017
Energy Project Corporation Cebu
TOTAL COAL 470.0
Energreen Power
18.9MW Calumangan Brgy. Calumangan, Bago
Development & 18.9 Dec 2014
Diesel Power Plant City, Negros Occidental
Management, Inc.
TOTAL OIL-BASED 18.9
49 MW Biliran Biliran Geothermal Orka Energy Philippines
Biliran, Biliran 49.0 Dec 2015
Geothermal Plant Project Incorporated (Iceland)
Dauin Geothermal Energy Development Energy Development
Dauin, Negros Oriental 40.0 Dec 2021
Project Corporation (EDC) Corporation (EDC)
Southern Leyte
Geothermal Plant
Energy Development Energy Development
Geothermal Project Cabalian, Southern Leyte TBA TBA
Corporation Corporation (EDC)
(formerly known as Mt.
Cabalian Geothermal)
TOTAL GEOTHERMAL 89.0
Leyte Solar Photovoltaic Phil. Solar Farm-Leyte, Phil. Solar Farm-Leyte,
Ormoc City, Leyte 30.0 Jan 2015
Power Project Inc. Inc.
San Carlos Solar Power
Project San Carlos Solar Energy San Carlos City, Negros
30.0 Feb 2015
Phase C-10 Inc. Occidental
Phase D-13
Cadiz Solar Power Phil.Power Exploration & Brgy., Tinampa-an Cadiz
100.0 Jul 2015
Project Development Corporation City, Negros Occidental
TOTAL SOLAR 160.0
As of 30 September 2014
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Pulupandan Wind Power First Maxpower International First Maxpower International Pulupandan, Negros
50.0 Sep 2015
Project Corporation Corporation Occidental
TOTAL WIND 50.0
Igbulo (Bais) Hydroelectric Century Peak Energy Century Peak Metals
Igbaras, Iloilo 5.1 Jan 2015
Power Project Corporation Holdings Corp
Century Peak Energy Century Peak Metals Kabankalan, Negros
Hilabangan (Upper Cascade) 4.8 Aug 2015
Corporation Holdings Corp Occidental
Century Peak Energy Century Peak Metals Kabankalan, Negros
Hilabangan (Lower Cascade) 3.0 Aug 2015
Corporation Holdings Corp Occidental
Century Peak Energy Century Peak Metals
Maninila (Lower Cascade) San Remigio, Antique 4.5 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Maninila (Upper Cascade) San Remigio, Antique 3.1 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Sibalom (Upper Cascade) San Remigio, Antique 4.2 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Sibalom (Middle Cascade) San Remigio, Antique 4.0 Oct 2016
Corporation Holdings Corp
Century Peak Energy Century Peak Metals
Sibalom (Lower Cascade) San Remigio, Antique 3.3 Oct 2016
Corporation Holdings Corp
Meadowland Developers,
Basak II Badian, Cebu 0.5 Apr 2017
Inc.
Timbaban Hydroelectric Oriental Energy and Power Oriental Peninsula
Madalag, Aklan 18.0 Aug 2017
Power Project Generation Corporation Resources Group Inc (ORE)
Main Aklan River Sunwest Water & Electric
Libacao, Aklan 15.0 TBD
Hydroelectric Power Project Company, Inc.
Natural Power Sources
Amlan (Plant A) Amlan, Negros Oriental 3.2 TBD
Integration, Inc.
Natural Power Sources
Amlan (Plant B) Amlan, Negros Oriental 1.5 TBD
Integration, Inc.
Natural Power Sources
Amlan (Plant C) Amlan, Negros Oriental 0.8 TBD
Integration, Inc.
Loboc Hydro Power Project Sta Clara Power Corporation Sta Clara Int’l Corporation Loboc, Bohol 1.2 TBD
TOTAL HYDRO 72.2
South Negros 25 MW Brgy. Cubay, La Carlota City,
South Negros Biopower Inc. 22.4 Dec 2016
Biomass Power Plant Negros Occidental
35.0 MW Mina Multi-Fuel
Green Power Panay Phils.,
Biomass Power Generation Iloilo 32.0 TBD
Inc.
Facility
TOTAL BIOMASS 54.4
40 MW Battery Storage AES Philippines Power AES Philippines Power Kabankalan, Negros
40.0 Mar 2015
Project Partners Co., LTD. Partners Co., LTD. Occidental
TOTAL BATTERY 40.0
TOTAL 954.5
As of 30 September 2014
MINDANAO POWER SUPPLY-DEMAND SITUATION
1 JANUARY to 31 OCTOBER 2014 (Daily)
2,000
1,900
1,800
2014 Actual Peak Demand =
1,444 MW (22 Oct)
1,700
1,600
1,500
1,400
1,300
1,200
1,100
600
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
January February March April May June July August September October
Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve
Actual
Notes
a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement
b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015.
c. 12.8 % peak demand growth rate resulted from observed 1.6 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016
d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2017-2020 * On-going testing and commissioning
e. Assumed 3.3 percent average forced outage of the total dependable capacity ** TBD – To be determined (target commercial operation)
MINDANAO GRID COMMITTED POWER PROJECTS (1,870MW)
Mother/ JV Rated Capacity Target Testing & Target Commercial
Name of the Project Project Proponent Location
Company (MW) Commissioning Operation
Mapalad Energy
15 MW MEGC Diesel Power Mapalad, Dalipuga, Iligan
Generating 15.0 Oct 2014 Nov 2014
Plant City
Corporation (MEGC)
Peak Power Peak Power Energy National Highway,
3x6.97 PSI MW Bunker-Fired
Soccsargen, Inc. Inc. (subsidiary of A Brgy.Apopong, General 20.9 Sep 2014 Nov 2014
Power Plant
(PSI) Brown) Santos City
ASELCO Compound,
Peak Power Energy
1x5.2 MW PSFI Bunker-Fired Peak Power San Brgy. San Isidro,San
Inc. (subsidiary of A 5.2 Sep 2014 Nov 2014
Power Plant Francisco (PSFI) Francisco, Agusan del
Brown)
Sur
Brgy. Binugao, Toril,
2 X 150 MW Coal-Fired Therma Aboitiz Power Davao City and Brgy. U1 – Nov 2014 U2 – Nov U1 – Mar 2015 U2 –
Therma South Inc. 300.0
South Energy Project Corporation Inawayan, Sta. Cruz, 2014 Jun 2015
Davao Del Sur
Southern Mindanao Coal Fired Sarangani Energy Alsons Power Brgy, Kamanga, Maasim, Unit 1 Sep 2015
100.0 Feb 2015
Power Station Unit 1 Corporation Corporation Sarangani
Southern Mindanao Coal Fired Sarangani Energy Alsons Power Brgy, Kamanga, Maasim,
100.0 Feb 2015 Nov-16
Power Station Unit 2 Corporation Corporation Sarangani
Puyo Hydroelectric Power First Gen Mindanao First Gen Power Jabonga, Agusan del
30.0 Jul 2017 Jul 2017
Project Hydropower Corp. Corporation Norte
TOTAL 1,870.7
* Excluding Off-grid power projects
As of 30 September 2014
** New Entry from Indicative list
MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
2x55 MW Balingasag
Thermal Power Plant
Brgy. Mandangoa,
(Circulating Fluidized Bed Minergy Coal Corporation Minergy 110.0 Jan 2017
Balingasag, Misamis Oriental
Combustion (CFBC) Coal-
Fired Power Plant Plant)
As of 30 September 2014
MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8 MW)
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Cabadbaran Hydroelectric First Gen Mindanao First Gen Power Cabadbaran, Agusan del
9.8 Dec 2015
Power Project Hydropower Corp. Corporation Norte
Euro Hydro Power (Asia) New Bataan, Compostela
New Bataan 2.4 Jan 2017
Holdings, Inc. Valley
Pasonanca Philcarbon, Inc. Philcarbon, Inc. Zamboanga City 0.1 Mar 2017
Culaman Hydroelectric Oriental Energy and Power Oriental Energy and Power
Manolo Fortich, Bukidnon 10.0 Jun 2018
Power Project Generation Corporation Generation Corporation
Mangima Hydroelectric Philnew Hydro Power
Manolo Fortich, Bukidnon 10.0 TBD
Power Project Corporation
Philnew Hydro Power
Clarin Clarin, Misamis Occidental 5.0 TBD
Corporation
Philnew Hydro Power
Mat-i-I Claveria, Cagayan de Oro 2.0 TBD
Corporation
Philnew Hydro Power Cagayan de Oro, Misamis
Mat-i-2 4.0 TBD
Corporation Oriental
Philnew Hydro Power Cagayan de Oro, Misamis
Mat-i-3 4.0 TBD
Corporation Oriental
TOTAL HYDRO 118.3
Centralla Solar Power NV Vogt Philippines Solar Brgy. Centralla, Surallah,
6.3 Mar 2015
Project Energy One, Inc. South Cotabato
Brgy.
Kirahon Solar Power Kirahon Solar Energy
Kirahon,Villanueva,Misamis 12.5 May 2015
Project Phase 1 Corporation
Oriental
Digos Solar Photovoltaic Enfinity Philippines
Enfinity Digos City, Davao del Sur 10.0 Oct 2015
Power Project Renewable Resources, Inc.
TOTAL SOLAR 28.8
12 MW Biomass Power Misamis Oriental Bio- Misamis Oriental Bio-
Misamis Oriental 10.8 Dec 2015
Plant Project Energy Corporations Energy Corporations
10MW Kalilangan Bio-
Energy Corporation Multi- Kalilangan Bio-Energy
Bukidnon 9.0 Dec 2016
Feedstock Power Corporation
Generating Facility
10MW Don Carlos Bio-
Energy Corporation Multi- Don Carlos Bio-Energy
Bukidnon 9.0 Dec 2016
Feedstock Power Corporations
Generating Facility
TOTAL BIOMASS 28.8
TOTAL 1,755.8
As of 30 September 2014
Measures Undertaken to Address Power Supply Issues
• Enforceable minimum energy • Develop role of utilities as key • Towards energy efficient
standards for appliances, with a implementation partners and housing precincts
Residential focus on space cooling and information providers • inclusion of residential measures 20
2030 Objectives:
Buildings refrigeration • Specific EE programs for low- in Building Code
• Building envelope measures – income households %
cool roofs and insulation
• Reformulate group to oversee • EE measures for inclusion in • Incentive funds in place for EE,
EE measures in Building Code national building code including private financiers
Commercial • Retro-commissioning program • Government demonstration • Mandatory disclosure of 25
Buildings for existing buildings retrofits to showcase ESCOs and commercial building performance
• Benchmarking and ratings for financing models %
building information and reporting • Promote green building ratings
• Support passage of Enercon • National strategy for efficiency • Energy Efficiency and
Bill in power supply sector Conservation Center mandated
Cross- • Establish EE database, data • Stronger coordination with other and established
Sectoral collection regime, M&E framework levels of government (LGUs)
• Establish enforcement regimes • Regular reporting and
• Strengthen ESCO capacity monitoring to commence
• Continue awareness-raising
Sending market signals to provide incentives for EE
Strengthening existing policy, advocacy, programs and institutional structures
Harnessing private sector / partner finance
Enabling innovation and new technologies