You are on page 1of 24

Public

Our credentials

1 © Tieto Corporation
Public
Our midstream customers

2 © Tieto Corporation
Public
Maximizing Profits for LNG Operations
through Decision Support

Prasad Deshpande Bharath Gangavelli


Senior Lead Business Analyst Senior Lead Business Analyst
Tieto, Oil & Gas Solutions Tieto, Oil & Gas Solutions
prasad.deshpande@tieto.com bharath.gangavelli@tieto.com
Public
LNG value chain

Loading

Field Development Liquefaction Plant LNG Tankers

Loaded
Ballast
Voyage
Voyage

Distribution
System (LDC)
Unloading

Receiving terminal
(Storage & Vaporization)
Power Generation

4 © Tieto Corporation
Public
Increasing complexity

Global LNG High increase in Shift away


demand LNG importing and from long-term
growth exporting countries contracts

Larger and more complex LNG distribution networks

5 © Tieto Corporation
Public
What the market needs

Integrated actionable
data for quicker decisions

Portfolio based planning to


improve efficiency

Creation of better plans


to increase profitability

6 © Tieto Corporation
Public
Decision Support
through Optimization
The game changer
Public
Value chain challenges

Reservoir Wellbore Pipelines Process Transport Sales

Reservoir Production Process Engineers Schedulers / Marketing


Engineers Engineers Dispatchers

8 © Tieto Corporation
Public
Cargo Management concept

9 © Tieto Corporation
Public
Cargo Management concept

Storage

Liftings Voyages Deliveries

Fleet

Entities

Decisions Optimization
Decision support

10 © Tieto Corporation
Public
Cargo Management concept

Storage

L D
L D
Liftings L Voyages DDeliveries
L D
L D

Fleet

Cost Revenue Profit


M$ M$ M$
Entities

Decisions Optimization
380 510 130
Decision support ↑▲+1.2% ↑▲+4.2% ↑▲+3.2%

11 © Tieto Corporation
Public
Goal
Integrated solution for modelling & optimization across value chain

Reservoir Wellbore Pipelines Process Transport Sales

VAR EOR VAR Choke Opening VAR Routing VAR Separator Cond. VAR Fleet Routing OBJ Max Revenue

CON Max Drawdown VAR Gas Lift Rates VAR MEG Injection CON Gas Capacity VAR Grid Routing OBJ Min Cost

CON Max Velocity CON Hydrates CON Product Quality CON Fleet Capabilities CON Contract Obligations
CON Grid Capabilities

12 © Tieto Corporation
Public
Energy Components
Cargo Management
Public
Energy Components Cargo Management
Decision support

Tools Benefits
Manage optimized portfolio Create Optimized Plans
wide plans
Increased Profitability
Tailored Workspace in EC Reduce Cost
KPI Driven Evaluation Quicker Decision Making
Efficient Scenario Management Portfolio Based Planning
EC Optimizer Framework Improve Fleet utilization
Powerful Visualization

14 © Tieto Corporation
Public
LNG Planner

Branch out from live


plan to new scenario
Adjust parameters &
information in new scenario
Make new plan based on
updated data

Comparison
of plans
Write plan back to live plan or
parent scenario

15 © Tieto Corporation
Public
Storage / Inventory

16 © Tieto Corporation
Public
Storage / Inventory

17 © Tieto Corporation
Public
Storage / Inventory

18 © Tieto Corporation
Public
Liftings / Unloads

19 © Tieto Corporation
Public
Liftings / Unloads

20 © Tieto Corporation
Public
Deliveries

21 © Tieto Corporation
Public
Fleet Planner

22 © Tieto Corporation
Public
Optimization oppertunties

Carrier allocation Repair schedule Repair inventory Scheduling

Assign carriers to Repair infeasible SDS If schedule adjustment Optimize shipping


planned voyages, while schedules by adjusting does not produce a schedule for ADP or
respecting “carrier time of load/unload, swap feasible inventory profile, SDS, while respecting
locks”, port acceptance carriers, adjust speed, or adjust production profile contractual obligations
and tank capacity. charter in capacity. to avoid tank tops. and shipping constraint.

Goal: Assign carriers to Goal: Create feasible Goal: Create feasible Goal: Minimize shipping
voyages schedule schedule cost

c
23 © Tieto Corporation
Public
For a live demo please visit our booth

You might also like