T.O.

List

Substructure
Preliminaries
1 Top Soil Removal

Pad Fdn.
1 Pit Excvtn
2 Disposal
3 Screed Conc.
4 Base Conc.
5 Col. Shaft Conc.
6 Fmwrk. for Base
7 Frnwk. For Column Shaft
8 Backfill

Strip Fdn.
1 Trench Excavation
2 Disposal
3 RRM
4 DPC
5 Backfill
Location Floor Element Item NRM2 REF.
Site preparation, removal of top soil for thkns of 150mm 5.5.2

Sub Struc Fdn Pad Fdn Pit excvtn for pad fdn, depth <2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Sub Struc Fdn Pad Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Sub Struc Fdn Pad Fdn <300mm,poured against ground 11.2.1.1.1
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col base, thickness <300mm 11.2.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Fmwrk for sides of col base,height<500mm 11.13.1
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col shaft, thickness <300mm 11.5.1.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Frmwrk for sides of isolated col shaft,square shaped

Sub Struc Fdn Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Sub Struc Fdn Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Sub Struc Fdn Strip Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Sub Struc Fdn Strip Fdn <300mm,poured against ground 11.2.1.1.1
Sub Struc Fdn Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Strip Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Strip Fdn 450mm thk RRM wall 14.1.1
Sub Struc Fdn Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Filling to fdn using mat obtained frm
Sub Struc Fdn Strip Fdn excvtn,depth>500mm 5.11.2
Sub Struc Fdn Strip Fdn DPC, width>300mm, applied hori

Sub Str Fdn Pad Fdn Reinfo T16 bar, sraight, for col and base
Sub Str Fdn Pad Fdn Reinfo T25 bar, bend, for col base
Type Unit No Length Width Dpth/Hght Girth Area
mm3 1.00 495,739,911.74

C1 mm3 18.00 1,000.00 1,000.00 2,400.00


mm3
C1
mm3
C1 18.00 1,000.00 1,000.00 50.00
C1 mm 3

C1 mm3
C1 mm3 18.00 1,000.00 1,000.00 225.00
C1 mm3
C1 mm3
C1 mm 18.00 4,000.00
C1 mm 3
18.00 225.00 225.00 775.00
C1 mm 3

C1 mm3
C1 mm2 18.00 775.00 900.00

Ext mm3 114,915.00 450.00 775.00


Ext mm3 -18.00 1,000.00 450.00 775.00
mm3
Ext
mm3
Ext 114,915.00 450.00 50.00
Ext mm3
Ext mm3
Ext mm2 114,915.00 725.00
Ext mm3 114,915.00 450.00 725.00
Ext mm3 -18.00 225.00 225.00 725.00
mm3
Ext
Ext mm2 114,915.00 450.00

C1 ton 800.00
C1 ton 1,800.00
Qty Remarks
495,739,911.74

43,200,000,000.00

43,200,000,000.00

900,000,000.00
900,000,000.00
(900,000,000.00)
4,050,000,000.00
4,050,000,000.00
(4,050,000,000.00)
72,000.00
706,218,750.00
706,218,750.00
(706,218,750.00)
12,555,000.00

40,076,606,250.00
(6,277,500,000.00) for C1

33,799,106,250.00

2,585,587,500.00
2,585,587,500.00
(2,585,587,500.00)
83,313,375.00
37,491,018,750.00
(660,656,250.00) for C1

(36,830,362,500.00)
51,711,750.00
Query Sheet

Name of the Project House for Mrs. Chamila - Nawala


Name of the Engineer Mr. Vijitha Asanka
Name of the Quantity Surveyor Mr. Shashika Maduranga

Item No. Date

01 6/7/2016

02 8/7/2016

03 10/7/2016

05 15/7/2016

06 16/07/2016

07 17/7/2016

…………………………………………
Quantity Surveyor
Query Sheet

mila - Nawala

ranga

Query Date

Please specify the height of the top soil to be removed. 6/7/2016

Please specify the water table level of the land 9/7/2016

Please specify the distance the waste materials to be


10/7/2016
displaced.

Please specify the cutting length of the BM2


15/07/2016
reinforcemant bar

Please specify the clear cover (above the base) 16/07/2016

Please specify the type of the reinforcemnt bar used for


18/07/2016
the base of the pad foundation
Answere

150mm height to be removed as top soil

1000mm below the ground level level

5km away from the site

800mm

30mm

T16 reinforcemnt bar is used for the base of the


foundatiion

…………………………………………………………….
Architect/ Engineer
Location Floor Element Item NRM2 REF.
Site preparation, removal of top soil for thkns of 150mm 5.5.2
Type Unit No Length Width Dpth/Hght Girth Area
mm3 1.00 495,739,911.74
Qty Remarks
495,739,911.74
Location Floor Element Item NRM2 REF.
Sub Struc Fdn Pad Fdn Pit excvtn for pad fdn, depth <2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Sub Struc Fdn Pad Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Sub Struc Fdn Pad Fdn <300mm,poured against ground 11.2.1.1.1
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col base, thickness <300mm 11.2.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Fmwrk for sides of col base,height<500mm 11.13.1
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col shaft, thickness <300mm 11.5.1.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Frmwrk for sides of isolated col shaft,square shaped
Type Unit No Length Width Dpth/Hght Girth Area
C1 mm3 18.00 1,000.00 1,000.00 2,400.00
mm3
C1
mm3
C1 18.00 1,000.00 1,000.00 50.00
C1 mm 3

C1 mm3
C1 mm3 18.00 1,000.00 1,000.00 225.00
C1 mm 3

C1 mm3
C1 mm 18.00 4,000.00
C1 mm3 18.00 225.00 225.00 775.00
C1 mm3
C1 mm3
C1 mm2 18.00 775.00 900.00
Qty Remarks
43,200,000,000.00

43,200,000,000.00

900,000,000.00
900,000,000.00
(900,000,000.00)
4,050,000,000.00
4,050,000,000.00
(4,050,000,000.00)
72,000.00
706,218,750.00
706,218,750.00
(706,218,750.00)
12,555,000.00
Location Floor Element Item NRM2 REF.
Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Strip Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Strip Fdn <300mm,poured against ground 11.2.1.1.1
Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Strip Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Strip Fdn 450mm thk RRM wall 14.1.1
Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Filling to fdn using mat obtained frm
Strip Fdn excvtn,depth>500mm 5.11.2
Strip Fdn DPC, width>300mm, applied hori
Type Unit No Length Width Dpth/Hght Girth Area
Ext mm3 114,915.00 450.00 775.00
Ext mm 3
-18.00 1,000.00 450.00 775.00
mm3
Ext
mm3
Ext 114,915.00 450.00 50.00
Ext mm 3

Ext mm3
Ext mm2 114,915.00 725.00
Ext mm 3
114,915.00 450.00 725.00
Ext mm 3
-18.00 225.00 225.00 725.00
mm3
Ext
Ext mm2 114,915.00 450.00
Qty Remarks
40,076,606,250.00
(6,277,500,000.00) for C1

33,799,106,250.00

2,585,587,500.00
2,585,587,500.00
(2,585,587,500.00)
83,313,375.00
37,491,018,750.00
(660,656,250.00) for C1

(36,830,362,500.00)
51,711,750.00
Location Floor Element Item NRM2 REF. Type Unit

Sub Str Fdn Pad Fdn T16 bar, straight, for col and base C1 ton

Sub Str Fdn Pad Fdn T25 bar bend for col Base C1 ton
No Length Width Dpth/Hght Girth Area Qty Remarks

192 800.00
153,600.00
64 1,800.00 115,200.00
Location Item
Sub Struc
Disposal of ecvtd mat offsite

DPC, width>300mm, applied hori

Filling to fdn using mat frm exc

Filling to fdn using mat obtain

Fmwrk for sides of col base,he

Frmwrk for sides of isolated col

G15 in-situ mass conc, in scree

G30 in-situ RC, in col base, thi

G30 in-situ RC, in col shaft, thi

Pit excvtn for pad fdn, depth <2

Trench excvtn for strip fdn, dep

450mm thk RRM wall

(empty)
(empty)

Site preparation, removal of top

Total Result
Unit Sum - Qty
###
f ecvtd mat offsite ###
mm3 ###
h>300mm, applied hori ###
mm2 ###
dn using mat frm exc ###
mm3 ###
dn using mat obtain ###
mm3 ###
sides of col base,he ###
mm ###
r sides of isolated col ###
mm2 ###
u mass conc, in scree ###
mm3 ###
u RC, in col base, thi ###
mm3 ###
u RC, in col shaft, thi ###
mm3 ###
for pad fdn, depth <2 ###
mm3 ###
cvtn for strip fdn, dep ###
mm3 ###
hk RRM wall ###
mm2 ###
###

(empty)
ration, removal of top ###
mm3 ###
###
Bar Schedule
Descriptio
Type and №of Cutting Shape
Bar Mark n of №of Bars Total № A(mm) B(mm)
Size Elmts length Code
Elements

BM 1 Col. Base T16 16 12 192 № 800 20 800


BM 2 Col. Base T25 16 4 64 № 1800 25 350 1750
BM 3 Col. T25 16 4 64 № 1085.2 20 1085.2
BM 4 Col. T16 16 8 128 № 660 61 165 165

16
r Schedule
BAR
Bar Weight Specificati
C(mm) D(mm) E/R(mm) r (mm) d (mm) mass per
Length (kg) ons
kg/m

150 16 153.6 1.58 242.73 BM 1


50 25 115.2 3.86 444.44 BM 2
25 69.4528 3.86 267.95 BM 3
150 10 84.48 0.62 52.15 BM 4
Material Unit Rate (Rs.) Supplier
Quality Price

3 4
930.00 S.T.K. Enterprises
Cement Bag
930.00 Rajawaththa Enterprises 4 3
930.00 Kariyapperuma Enterprises 4 4
16,000.00 S.T.K. Enterprises 5 4
Sand Cube 15,600.00 Rajawaththa Enterprises 4 4
16,000.00 Kariyapperuma Enterprises 5 4
7,000.00 S.T.K. Enterprises 5 5
3/4" Metal Cube 7,200.00 Rajawaththa Enterprises 4 3
7,000.00 Kariyapperuma Enterprises 4 3
5,000.00 S.T.K. Enterprises 5 4
RRM Cube 5,600.00 Rajawaththa Enterprises 5 3
5,500.00 Kariyapperuma Enterprises 5 5
620.00 S.T.K. Enterprises 3 2
Tor Steel
Bar 650.00 Rajawaththa Enterprises 4 5
(12mm)
650.00 Kariyapperuma Enterprises 4 4
1,200.00 S.T.K. Enterprises 4 1
Tor Steel
Bar 1,300.00 Rajawaththa Enterprises 5 2
(16mm)
1,300.00 Kariyapperuma Enterprises 3 2
Hire of 1,500.00 Kivira Enterprises 4 4
Vibrator 1,000.00 Janith Enterprises (Pvt) Ltd 4 3

2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty ice rt ry nt y un
t
ue
s
uali Pr spo live plai cilit co eq
Q an e m Fa Di
s
Ch
Tr e D r co d it
tim o Cr
e
On s ef
on
e sp
R
P s eli
v pl ci o eq
Qu r an D om t Fa Di
sc
Ch
T e c di
tim f or C re
On se
p on
s
Re

Cement

2
Kariyapperuma Enterprises
1 S.T.K. Enterprises
Rajawaththa Enterprises
0
lit
y ice rt er
y in
t y un
t
ue
s
a Pr spo iv la cilit o q
Qu an el m
p Fa Di
sc
Ch
e
Tr e D r co d it
tim o Cr
e
On sef
on
e sp
R

3/4 Material

2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty t y t t es
ali ice or er in ity un
u Pr sp liv pla
acil
co equ
Q an e m tF Di
s
Ch
Tr e D r co di
m fo e
ti Cr
On nse
o
sp
Re

Tor Steel(12mm)

2
6

1 Kivira Enterprises
Janith Enterprises (Pvt) Ltd
0
ty ice rt ry nt y un
t
ue
s
u ali Pr spo live plai cilit co eq
Q an e a s
Tr eD co
m tF Di Ch
m r edi
ti fo Cr
On nse
o
e sp
R

Vibrator
Supplier Evaluation

Response
Transport On time for Credit Discount Cheques Total
Delivery Facility Points
complaint

3 5 4 1 3 2 25

4 4 1 1 4 2 23
5 5 5 1 2 3 29
3 4 5 1 3 1 26
4 4 1 1 2 2 22
3 5 5 1 4 3 30
2 4 4 1 5 4 30
3 4 2 2 1 2 21
5 5 4 1 2 1 25
4 4 4 1 2 1 25
4 3 3 4 3 1 26
2 4 4 1 5 3 29
4 1 4 1 4 2 21
4 3 3 2 5 2 28
3 3 3 2 3 1 23
5 2 2 4 2 2 22
3 4 4 5 1 3 27
5 4 4 3 2 3 26
4 3 1 1 1 4 22
4 1 1 2 1 5 21

2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
lit
y ice rt ry t y t s
a Pr spo live lain cilit oun que
Qu an e m
p Fa Di
sc
Ch
e
Tr e D r co d it
tim o Cr
e
On s ef
on
e sp
R
a P p v pl il o eq
Qu ns eli ac sc
Tr
a D co
m t F Di Ch
e di
tim f or Cre
On se
p on
s
Re

Sand

2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty ice rt er
y in
t y un
t
ue
s
uali Pr spo iv la cilit o q
an el p Fa sc e
Q
Tr e D r co
m it Di Ch
d
tim o Cr
e
On s ef
on
e sp
R

RRM

2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty t y t t es
ali ice or er in ity un
u Pr sp liv pla
acil
co equ
Q an e m tF Di
s
Ch
Tr e D r co di
m fo e
ti Cr
On nse
o
sp
Re

Tor Steel(16mm)
Legend

Quality Price On time delivery


4 Best Very High Deliver on time
3 Good High One - two days delay
2 Moderate Moderate One week delay
1 Poor Low More than one week delay

According to National Water Supply and Drainage Board Law, No. 2 of 1974 under Tariff 1

Price of Water per Unit (Rs.) 18.00

1 unit = 1m3
1m3 = 220 gal

Price of water per Gallon (Rs.) 0.08

According to Domestic Mobile Service

Skilled Labour Rate per day (Rs.) 2,000.00


Unskilled Labour Rate per day (Rs.) 1,500.00
Legend

Payment through bank


Transport Discount Deposit
account
High >20% >10,000 Highly Possible
Moderate 20% 5000 - 10,000 Possible
Low 10% 1000 - 5000 Moderately possible
No delivery / No cost No discount No deposit Impossible

2 of 1974 under Tariff 12 - Bulk Supply


MATERIALS LABOUR
Descriptio Price Descriptio Price
Item No. Code No. Unit Item No. Code No. Unit
n ( Rs.) n ( Rs.)
6 Bitumen M-006 Gal 530.00 3 SK Labour L-003 Day 1,200.00
SK Labour
26 Cement M-026 Bag 930.00 4 L-004 Day 900.00
(Vibrator)
Metal - 3/4 U / SK
66 M-066 Cube 7,000.00 7 L-007 Day 700.00
" Labourer
Plywood
74 Sash - 6' 9" M-074 No 650.00 9 Mason L-009 Day 1,200.00
X 2' 9"
Rubble -
111 M-111 Cube 5,600.00
6" - 9"
113 Sand M-113 Cube 16,000.00
Tor Steel
Rods
152 including M-152 Kg. 116.37
transport to
site
157 Water M-157 Gal 0.08
PLANT
Price
Item No. Description Code No. Unit
( Rs.)
1 Hire of Mixer P-001 Day 1,400.00

2 Hire of Vibrator P-002 Day 1,500.00

3 Vibrating Rammer P-003 Day 1,000.00


1 Site Preparation & Excavation
2 Earth work support and Filling
3 DPC
4 RRM
5 Concrete Work
6 Formwork
7 Reinforcement
01. Site Preparation & Excavation

Site Preparation
Removing top soil to a Depth not Exceeding 6" & Depositing as
01.A.03
Directed within Site

Analysis for 10 Sqrs

No. Item DescriptionItem Ref Unit Quantity Rate Amount

U / SK
1 L-007 Day 10 700.00 7,000.00
Labourer
Allow
2.5% of
1.01 Items 175.00
( 1.01 ) for
Tools
Total for 2.25 700 7,175.00
Rate for 1 700 717.50
Rate(Say) 1Sqr 717.50
Rate(Say) 1ft2 7.18
Rate(Say) 1m 2
77.20

Excavation
Excavation in trenches for walls column pits in ordinary soil from
01.B.03 0' 0" to 5' 0" deep and depositing excavated material not exceeding
30' 0"
Analysis for 1 Cube
No Item DescriptionItem Ref Unit Quantity Rate Amount
U / SK
1 L-007 Day 2.25 700.00 1,575.00
Labourer
Allow
2.5% of
1.02 Items 39.38
( 1.01 ) for
Tools
Total for 0 0 1,614.38
Rate for 1 0 1,614.38
Rate(Say) 1Cube 1,614.38
Rate(Say) 1ft 3
16.14
Rate(Say) 1m 3
570.00
02. Earth Work Support
Earth Work Support

Earth Work Support (Open Planking) in trenches up to a depth of 5'


02.B.01
0"
Analysis for 1.5 Sqr

Item
No Item Ref Unit Quantity Rate Amount
Description

Class II
1.01 Timber (17.5 M-140 Cu.ft 4.375 750.00 3,281.25
ft3 for 4 uses)

1.02 Carpenter L-008 Day 1 1,200.00 1,200.00


U / SK
1.03 L-007 Day 3 700.00 2,100.00
Labourer
Total for 0 0 6,581.25
Rate for 1 0 4,387.50
Rate(Say) 1 Sqr 4,387.50
Rate(Say) 1m2 472.10
03. DPC
03.B.01 3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.00999999 Cement M-026 Bag 2.25 930.00
1.01999998 Sand M-113 Cube 0.11 16,000.00
1.02999997 Bitumen M-006 Gal 1.5 530.00
1.03999996 Fire Wood M-046 Lbs 10 650.00
1.04999995 Water M-157 Gal 10 0.08
1.05999994 Mason L-009 Day 1.25 1,200.00
1.07000005 U / SK Labourer L-007 Day 2.5 700.00
Total for 1 0
Rate for 1 0
Rate(Say) 1Sqr
Rate(Say) 1ft2
Rate(Say) 1m2
Amount
2,092.50
1,760.00
795.00
6,500.00
0.82
1,500.00
1,750.00
14,398.32
14,398.32
14,398.00
143.98
1,549.22
04. Random Rubble Masonry Work

04.01 Random Rubble Masonry in cement mortar 1:5 in foundation


Analysis for 1 Cube
No Item DescriptionItem Ref Unit Quantity Rate Amount
6" - 9"
1.01 M-111 Cube 1.3 5,600.00 7,280.00
Rubble
1.02 Cement M-026 Bag 5 930.00 4,650.00
1.03 Sand M-113 Cube 0.3 16,000.00 4,800.00
1.04 Water M-157 Gal 100 0.08 8.18
1.05 Mason L-009 Day 4 1,200.00 4,800.00
U / SK
1.06 L-007 Day 6 700.00 4,200.00
Labourer
Total for Quantity Rate 25,738.18
Rate for 1 Rate 25,738.18
Rate(Say) 1Cube 25,738.00
Rate(Say) 1ft3 257.38
Rate(Say) 1m 3
9,094.70

04.02 Random Rubble Masonry in cement mortar 1:5 in Superstructure


Analysis for 1 Cube
No Item DescriptionItem Ref Unit Quantity Rate Amount
6" - 9"
1.01 M-111 Cu 1.3 5,600.00 7,280.00
Rubble
1.02 Cement M-026 Bag 5 930.00 4,650.00
1.03 Sand M-113 Cu 0.3 16,000.00 4,800.00
1.04 Water M-157 Gal 100 0.08 8.18
1.05 Mason L-009 Day 4.5 1,200.00 5,400.00
U / SK
1.06 L-007 Day 7 700.00 4,900.00
Labourer
Allow 3%
of Items
( 1.05, 1.06
1.07 - - - - 309.00
) for
Scaffoldin
g
Total for Quantity Rate 27,347.18
Rate for 1 Rate 27,347.18
Rate(Say) 1Cube 27,347.00
Rate(Say) 1ft3 273.47
Rate(Say) 1m 3
9,663.25
05. Concrete Work

Concrete Work
05.A.04 Mixing Concrete 1:2:4(3/4")
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Cement M-026 Bag 18 930.00 16,740.00
1.02 Sand M-113 Cube 0.5 16,000.00 8,000.00

1.03 3/4 " Metal M-066 Cube 0.88 5,600.00 4,928.00

1.04 Hire of Mixer P-001 Day 0.333 1,400.00 466.20

1.05 Water M-157 Gal 120 0.08 9.82


1.0599999 SK Labour L-003 Day 0.333 1,200.00 399.60

1.0700001 U / SK Labourer L-007 Day 2 700.00 1,400.00

Total for 0 0 31,943.62


Rate for 1 0 31,943.62
Rate(Say) 1Cube 31,940.00
Rate(Say) 1m3 11,286.22

05.D.04 Cement concrete 1:2:4(3/4") in 9" X 9" columns in ground floor.


Analysis for 80 L.ft or 0.45
No Item Description Item Ref Unit Quantity Rate Amount
Mixed Concrete
1.01 05.A.04 Cu 0.45 11,286.22 5,078.80
1:2:4(3/4")
Allow 5% of Items
253.94
( 1.01 ) for Wastage
1.025 Hire of Vibrator P-002 Day 1 1,500.00 1,500.00
1.03 Mason L-009 Day 1 1,200.00 1,200.00
1.04 U / SK Labourer L-007 Day 3 700.00 2,100.00
SK Labourer
1.05 L-004 Day 1 900.00 900.00
(Vibrator)
1.0599999 Jute Hessian M-063 Sq.ft 60 3.50 210.00
1.0700001 Water M-157 Gal 100 0.08 8.18
U / SK Labourer
1.08 L-007 Day 0.5 700.00 350.00
(curing)
Total for 0 0 11,600.92 0.45 Cubes
Rate for 1 0 145.01 1 Cube
Rate(Say) 1 ft 150.00 1Cube
Rate(Say) 1m 492.00 1m3
Ground floor - First Floor 1m 492.00 1m3
First Floor - Second Floor 1m 541.20 1m3
Second Floor - Third Floor 1m 595.32 1m3
Third Floor - Fourth Floor 1m 654.85 1m3
05.A.02 Mixing Concrete 1:3:6(1 1/2")
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Cement M-026 Bag 13 930.00 12,090.00
1.02 Sand M-113 Cube 0.53 16,000.00 8,480.00
1.03 1 1/2 " Metal M-065 Cube 0.92 7,000.00 6,440.00
1.04 Hire of Mixer P-001 Day 0.333 1,400.00 466.20
1.05 Water M-157 Gal 110 0.08 9.00
1.0599999 SK Labour L-003 Day 0.333 1,200.00 399.60
1.0700001 U / SK Labourer L-007 Day 2 700.00 1,400.00
Total for 29,284.80
Rate for 1 29,284.80
Rate(Say) 1Cube 29,280.00
Rate(Say) 1m3 10,346.29

3" Thick cement concrete 1:3:6(1-1/2") screed in foundation at depths not


05.B.02
exceeding 5' 0"
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
Mixing Concrete
1.01 05.A.02 Cube 0.25 10,346.29 2,586.57
1:3:6(1 1/2")
1.02 SK Labour L-003 Day 0.125 1,200.00 150.00
1.03 U / SK Labourer L-007 Day 0.75 700.00 525.00
Total for 0 0 3,261.57
Rate for 1 0 3,261.57
Rate(Say) 1 Sqr 3,260.00
Rate(Say) 1ft2 32.60
Rate(Say) 1m 2
350.78
Cubes

11,600.92
25,779.82
25,780.00
9,109.54
9,109.54
10,020.49
11,022.54
12,124.80
Column

Sawn timber formwork to 9" x 9" cement concrete column in


06.A.01
ground floor.
Analysis for 0.15 Sq
No Item DescriptionItem Ref Unit Quantity Rate Amount

Sawn
timber
formwork
to 9" x 9"
cement
1.01 concrete 06.A.02 1 Use 1 650.00 650.00
column in
ground
floor -
Making
Mould

Bolts
16mm 18"
1.02 M-010 No 0.6 75.00 45.00
(12 nos 20
uses)
1.03 Mould Oil M-071 litre 0.5 35.00 17.50
Timber
1.04 props 4" x M-144 L.ft 3.5 65.00 227.50
2"

Carpenter -
1.05 L-008 Day 0.25 1,200.00 300.00
assembling

U / SK
1.0599999 Labourer - L-007 Day 0.25 700.00 175.00
assembling

Carpenter -
dismantlin
1.0700001 g, cleaning L-008 Day 0.25 1,200.00 300.00
&
repairing

U / SK
Labourer -
dismantlin
1.08 L-007 Day 0.25 700.00 175.00
g, cleaning
&
repairing

Total for 0.25 700 1,890.00


Rate for 1 700 12,600.00
Rate(Say) 1Sq 12,600.00
Rate(Say) 1ft2 126.00
Rate(Say) 1m2 1,355.76
Ground floor - First Floor 1m2 1,355.76
First Floor - Second Floor 1m2
1,491.34
Second Floor - Third Floor 1m2
1,640.47
Third Floor - Fourth Floor 1m2
1,804.52
07. Reinforcement

Tor steel reinforcement to lintels, slabs, beams or columns bent to


7.01
shape, laid in position and tied with G.I. Wire as directed.
Analysis for 1 Cwt.
No Item DescriptionItem Ref Unit Quantity Rate Amount
M.S./Tor
Steel Rods
1.01 including M-152 kg 50 5.00 250.00
transport to
site

Allow 15%
of Items
1.02 - - - - 37.50
( 1.01 ) for
Wastage

16 BWG
1.03 Binding M-005 Lbs 1.5 100.00 150.00
Wire
Allow
1.5% of
Items
1.04 - - - - 3.75
( 1.01 ) for
spaces or
chairs
1.05 SK Labour L-003 Day 1 1,200.00 1,200.00
U / SK
1.0599999 L-007 Day 1 700.00 700.00
Labourer
Total for Quantity Rate 2,341.25
Rate for 1 Rate 2,341.25
Rate(Say) 1Cwt 2,341.00
Rate(Say) 1Kg 46.82
Bill Of Quantity
Item Description Unit Quantity
Substructure

Site preparation, removal of top soil for thkns of 150mm mm2 495,739,911.74

Trench excvtn for strip fdn, depth<2.00m mm3 33,799,106,250.00

Pit excvtn for pad fdn, depth <2.00m mm3 42,828,660,000.00

G30 in-situ RC, in col shaft, thickness <300mm mm3 706,218,750.00

G30 in-situ RC, in col base, thickness <300mm mm3 4,050,000,000.00

G15 in-situ mass conc, in screed, thickness <300mm,poured


against ground mm3 3,485,587,500.00

Frmwrk for sides of isolated col shaft,square shaped mm2 12,555,000.00

Fmwrk for sides of col base,height<500mm mm2 72,000.00

DPC, width>300mm, applied hori mm2 51,711,750.00

450mm thk RRM wall mm2 83,313,375.00

Disposal of ecvtd mat offsite mm3 45,072,168,750.00

Grand Total(Rs.)
uantity
Unit Quantity Rate Amount

m2 495.74 77.20 38,272.61

m3 33.80 570.00 19,265.49

m3 42.83 570.00 24,412.34

m3 0.71 9,109.54 6,433.33

m3 4.05 9,109.54 36,893.64

m3 3.49 350.78 1,222.66

m2 12.56 1,355.76 17,021.57

m2 0.07 1,355.76 97.61

m2 51.71 1,549.22 80,113.13

m3 83.31 9,094.70 757,710.12

m3 45.07

981,442.49