Professional Documents
Culture Documents
ITP Log - (QC)
ITP Log - (QC)
Amman - Jordan
8-Aug-11
Excavation
5 ST-SD-07 SD-ECl-02 Excavation Structure
Coordination levels
Blinding
6 SD-BCl-01 Coordination- Structure
Entrance building
Foundation 23-Jun-11
7 SD-FFCL-01 Coordination- Structure 2-Aug-11
Entrance building An
17-Jul-11
8 ST-SD-06 S-SD-FD04 Strip footing Structure 29-Aug-11
Reinforcement
A
Reinforcement 17-Jul-11 8-Sep-11
Detail Bottom Layer
8 ST-SD-06 S-SD-FD05 Structure 29-Aug-11
An*
Ditto top layer 17-Jul-11 8-Sep-11
8 ST-SD-06 S-SD-FD06 Structure 29-Aug-11
An*
Slab on Grade 17-Jul-11 8-Sep-11
8 ST-SD-06 S-SD-FD07 Basement floor Structure 29-Aug-11
A
Tie Beams (Main 17-Jul-11 8-Sep-11
Buildings)
16 ST-SD-06 S-SD-FD08 Structure 29-Aug-11
An*
17-Jul-11 8-Sep-11
8 ST-SD-06 S-SD-FD09 B.B.S Axis Structure 29-Aug-11
An*
8-Aug-11
Blinding Coordinates
8 ST-SD-07 Structure
& Levels
27-Aug-11
ENSDSUSOG70 S-C&W-N.C-01 Walls &Columns Structure
neck coordinates
SN ITP Ref No. Description Location/Zone Inspection Date Inspection Time Assinged Inspector Comments Status
1 UMN-QAQC-AFI-051 Application for Inspection (Rebar) - RTW Basement/Zone 3A 1-Feb-2020 - Engr. Oliver Banas COMPLETED
2 UMN-QAQC-FER-051 Form Enclosure Request - RTW Basement/Zone 3A 1-Feb-2020 - Engr. Oliver Banas COMPLETED
3 UMN-QAQC-CPR-051 Concrete Pouring Request - RTW Basement/Zone 3A 1-Feb-2020 - Engr. Oliver Banas COMPLETED
4 UMN-QAQC-FSR-051 Form Stripping Request - RTW Basement/Zone 3A 1-Feb-2020 - Engr. Oliver Banas COMPLETED
5 UMN-QAQC-AFI-052 Application for Inspection (Rebar) -COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
6 UMN-QAQC-FER-052 Form Enclosure Request - COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
7 UMN-QAQC-CPR-052 Concrete Pouring Request - COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
8 UMN-QAQC-FSR-052 Form Stripping Request - COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
9 UMN-QAQC-AFI-054 Application for Inspection (Rebar) -COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
10 UMN-QAQC-FER-054 Form Enclosure Request - COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
11 UMN-QAQC-CPR-054 Concrete Pouring Request - COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
12 UMN-QAQC-FSR-054 Form Stripping Request - COLUMN Basement/Zone 3A 2-Feb-2020 - Engr. Oliver Banas COMPLETED
13 UMN-QAQC-AFI-055 Application for Inspection (Rebar) - SLAB/BEAM/COLUMN 3rd Floor/Zone 2B 2-Feb-2020 - Engr. Oliver Banas COMPLETED
14 UMN-QAQC-FER-055 Form Enclosure Request - SLAB/BEAM/COLUMN 3rd Floor/Zone 2B 2-Feb-2020 - Engr. Oliver Banas COMPLETED
15 UMN-QAQC-CPR-055 Concrete Pouring Request - SLAB/BEAM/COLUMN 3rd Floor/Zone 2B 2-Feb-2020 - Engr. Oliver Banas COMPLETED
16 UMN-QAQC-FSR-055 Form Stripping Request - SLAB/BEAM/COLUMN 3rd Floor/Zone 2B 2-Feb-2020 - Engr. Oliver Banas COMPLETED
17 LRNAG-200203-005 Concrerete Compressive Strength Test Result Varies 3-Feb-2020 Engr. Oliver Banas COMPLETED
Application for Inspection (Rebar) - CANTILEVER
18 UMN-QAQC-AFI-056 2nd Floor/Zone 2A 4-Feb-2020 - Engr. Oliver Banas
SLAB/BEAM COMPLETED
19 UMN-QAQC-FER-056 Form Enclosure Request- CANTILEVER SLAB/BEAM 2nd Floor/Zone 2A 4-Feb-2020 - Engr. Oliver Banas COMPLETED
20 UMN-QAQC-CPR-056 Concrete Pouring Request- CANTILEVER SLAB/BEAM 2nd Floor/Zone 2A 4-Feb-2020 - Engr. Oliver Banas COMPLETED
21 UMN-QAQC-FSR-056 Form Stripping Request- CANTILEVER SLAB/BEAM 2nd Floor/Zone 2A 4-Feb-2020 - Engr. Oliver Banas COMPLETED
22 UMN-QAQC-AFI-057 Application for Inspection (Rebar) - FOOTING Foundation/Zone 3B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
23 UMN-QAQC-FER-057 Form Enclosure Request - FOOTING Foundation/Zone 3B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
24 UMN-QAQC-CPR-057 Concrete Pouring Request - FOOTING Foundation/Zone 3B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
25 UMN-QAQC-FSR-057 Form Stripping Request - FOOTING Foundation/Zone 3B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
26 UMN-QAQC-AFI-058 Application for Inspection (Rebar) - RTW Basement/Zone 3A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
27 UMN-QAQC-FER-058 Form Enclosure Request - RTW Basement/Zone 3A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
28 UMN-QAQC-CPR-058 Concrete Pouring Request - RTW Basement/Zone 3A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
29 UMN-QAQC-FSR-058 Form Stripping Request - RTW Basement/Zone 3A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
30 UMN-QAQC-AFI-059 Application for Inspection (Rebar) - COLUMN Basement/Zone 1B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
31 UMN-QAQC-FER-059 Form Enclosure Request - COLUMN Basement/Zone 1B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
32 UMN-QAQC-CPR-059 Concrete Pouring Request - COLUMN Basement/Zone 1B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
33 UMN-QAQC-FSR-059 Form Stripping Request - COLUMN Basement/Zone 1B 5-Feb-2020 - Engr. Oliver Banas COMPLETED
34 UMN-QAQC-AFI-060 Application for Inspection (Rebar) - COLUMN 3rd Floor/Zone 2A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
35 UMN-QAQC-FER-060 Form Enclosure Request - COLUMN 3rd Floor/Zone 2A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
36 UMN-QAQC-CPR-060 Concrete Pouring Request - COLUMN 3rd Floor/Zone 2A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
37 UMN-QAQC-FSR-060 Form Stripping Request - COLUMN 3rd Floor/Zone 2A 5-Feb-2020 - Engr. Oliver Banas COMPLETED
38 UMN-QAQC-AFI-061 Application for Inspection (Rebar) - FTG Basement/Zone 2A 9-Feb-2020 - Engr. Oliver Banas COMPLETED
39 UMN-QAQC-FER-061 Form Enclosure Request - FTG Basement/Zone 2A 9-Feb-2020 - Engr. Oliver Banas COMPLETED
40 UMN-QAQC-CPR-061 Concrete Pouring Request - FTG Basement/Zone 2A 9-Feb-2020 - Engr. Oliver Banas COMPLETED
41 UMN-QAQC-FSR-061 Form Stripping Request - FTG Basement/Zone 2A 9-Feb-2020 - Engr. Oliver Banas COMPLETED
42 UMN-QAQC-AFI-062 Application for Inspection (Rebar) - RTW Basement/Zone 3A 7-Feb-2020 - Engr. Oliver Banas COMPLETED
43 UMN-QAQC-FER-062 Form Enclosure Request - RTW Basement/Zone 3A 7-Feb-2020 - Engr. Oliver Banas COMPLETED
44 UMN-QAQC-CPR-062 Concrete Pouring Request - RTW Basement/Zone 3A 7-Feb-2020 - Engr. Oliver Banas COMPLETED
45 UMN-QAQC-FSR-062 Form Stripping Request - RTW Basement/Zone 3A 7-Feb-2020 - Engr. Oliver Banas COMPLETED
46 LRNAG-200210-000 Concrerete Compressive Strength Test Result Varies 10-Feb-2020 - Engr. Oliver Banas COMPLETED
47 UMN-QAQC-AFI-063 Application for Inspection (Rebar) - RTW Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
48 UMN-QAQC-FER-063 Form Enclosure Request - RTW Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
49 UMN-QAQC-CPR-063 Concrete Pouring Request - RTW Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
50 UMN-QAQC-FSR-063 Form Stripping Request - RTW Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
51 UMN-QAQC-AFI-064 Application for Inspection (Rebar) - RTW FOOTING Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
52 UMN-QAQC-FER-064 Form Enclosure Request - RTW FOOTING Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
53 UMN-QAQC-CPR-064 Concrete Pouring Request - RTW FOOTING Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
54 UMN-QAQC-FSR-064 Form Stripping Request - RTW FOOTING Basement/Zone 3B 11-Feb-2020 - Engr. Oliver Banas COMPLETED
55 LRNAG-200211-0001 Concrerete Compressive Strength Test Result Varies 11-Feb-2020 - Engr. Oliver Banas COMPLETED
56 UMN-QAQC-AFI-065 Application for Inspection (Rebar) - RTW Basement/Zone 3B 12-Feb-2020 - Engr. Oliver Banas COMPLETED
57 UMN-QAQC-FER-065 Form Enclosure Request - RTW Basement/Zone 3B 12-Feb-2020 - Engr. Oliver Banas COMPLETED
58 UMN-QAQC-CPR-065 Concrete Pouring Request - RTW Basement/Zone 3B 12-Feb-2020 - Engr. Oliver Banas COMPLETED
59 UMN-QAQC-FSR-065 Form Stripping Request - RTW Basement/Zone 3B 12-Feb-2020 - Engr. Oliver Banas COMPLETED
60 UMN-QAQC-AFI-066 Application for Inspection (Rebar) - COLUMN Basement/Zone 3A 13-Feb-2020 - Engr. Oliver Banas COMPLETED
61 UMN-QAQC-FER-066 Form Enclosure Request - COLUMN Basement/Zone 3A 13-Feb-2020 - Engr. Oliver Banas COMPLETED
62 UMN-QAQC-CPR-066 Concrete Pouring Request - COLUMN Basement/Zone 3A 13-Feb-2020 - Engr. Oliver Banas COMPLETED
63 UMN-QAQC-FSR-066 Form Stripping Request - COLUMN Basement/Zone 3A 13-Feb-2020 - Engr. Oliver Banas COMPLETED
64 UMN-QAQC-AFI-067 Application for Inspection (Rebar) - FTG Basement/Zone 3B 14-Feb-2020 - Engr. Oliver Banas COMPLETED
65 UMN-QAQC-FER-067 Form Enclosure Request - FTG Basement/Zone 3B 14-Feb-2020 - Engr. Oliver Banas COMPLETED
66 UMN-QAQC-CPR-067 Concrete Pouring Request - FTG Basement/Zone 3B 14-Feb-2020 - Engr. Oliver Banas COMPLETED
67 UMN-QAQC-FSR-067 Form Stripping Request - FTG Basement/Zone 3B 14-Feb-2020 - Engr. Oliver Banas COMPLETED
68 UMN-QAQC-AFI-068 Application for Inspection (Rebar) - FOOTING Foundation/Zone 3B 13-Feb-2020 - Engr. Oliver Banas COMPLETED
69 UMN-QAQC-FER-068 Form Enclosure Request - FOOTING Foundation/Zone 3B 13-Feb-2020 - Engr. Oliver Banas COMPLETED
70 UMN-QAQC-CPR-068 Concrete Pouring Request - FOOTING Foundation/Zone 3B 13-Feb-2020 - Engr. Oliver Banas COMPLETED
71 UMN-QAQC-FSR-068 Form Stripping Request - FOOTING Foundation/Zone 3B 13-Feb-2020 - Engr. Oliver Banas COMPLETED
72 LRNAG-200213-003 Concrerete Compressive Strength Test Result Varies 13-Feb-2020 - Engr. Oliver Banas COMPLETED
73 UMN-QAQC-AFI-069 Application for Inspection (Rebar) - COLUMN/BEAM/SLAB 3rd Floor/Zone 2B 14-Feb-2020 - Engr. Oliver Banas
COMPLETED
74 UMN-QAQC-FER-069 Form Enclosure Request - COLUMN/BEAM/SLAB 3rd Floor/Zone 2B 14-Feb-2020 - Engr. Oliver Banas COMPLETED
75 UMN-QAQC-CPR-069 Concrete Pouring Request - COLUMN/BEAM/SLAB 3rd Floor/Zone 2B 14-Feb-2020 - Engr. Oliver Banas COMPLETED
76 UMN-QAQC-FSR-069 Form Stripping Request - COLUMN/BEAM/SLAB 3rd Floor/Zone 2B 14-Feb-2020 - Engr. Oliver Banas COMPLETED
77 UMN-QAQC-AFI-070 Application for Inspection (Rebar) - RTW Basement/Zone 3B 15-Feb-2020 - Engr. Oliver Banas COMPLETED
78 UMN-QAQC-FER-070 Form Enclosure Request - RTW Basement/Zone 3B 15-Feb-2020 - Engr. Oliver Banas COMPLETED
79 UMN-QAQC-CPR-070 Concrete Pouring Request - RTW Basement/Zone 3B 15-Feb-2020 - Engr. Oliver Banas COMPLETED
80 UMN-QAQC-FSR-070 Form Stripping Request - RTW Basement/Zone 3B 15-Feb-2020 - Engr. Oliver Banas COMPLETED
81 UMN-QAQC-AFI-071 Application for Inspection (Rebar) - RTW Basement/Zone 3A 16-Feb-2020 - Engr. Oliver Banas COMPLETED
82 UMN-QAQC-FER-071 Form Enclosure Request - RTW Basement/Zone 3A 16-Feb-2020 - Engr. Oliver Banas COMPLETED
83 UMN-QAQC-CPR-071 Concrete Pouring Request - RTW Basement/Zone 3A 16-Feb-2020 - Engr. Oliver Banas COMPLETED
84 UMN-QAQC-FSR-071 Form Stripping Request - RTW Basement/Zone 3A 16-Feb-2020 - Engr. Oliver Banas COMPLETED
85 UMN-QAQC-AFI-072 Application for Inspection (Rebar) - COLUMN 3rd Floor/Zone 2B 16-Feb-2020 - Engr. Oliver Banas COMPLETED
86 UMN-QAQC-FER-072 Form Enclosure Request - COLUMN 3rd Floor/Zone 2B 16-Feb-2020 - Engr. Oliver Banas COMPLETED
87 UMN-QAQC-CPR-072 Concrete Pouring Request - COLUMN 3rd Floor/Zone 2B 16-Feb-2020 - Engr. Oliver Banas COMPLETED
88 UMN-QAQC-FSR-072 Form Stripping Request - COLUMN 3rd Floor/Zone 2B 16-Feb-2020 - Engr. Oliver Banas COMPLETED
89 UMN-QAQC-AFI-073 Application for Inspection (Rebar) - RTW Basement/Zone 3B 17-Feb-2020 - Engr. Oliver Banas COMPLETED
90 UMN-QAQC-FER-073 Form Enclosure Request - RTW Basement/Zone 3B 17-Feb-2020 - Engr. Oliver Banas COMPLETED
91 UMN-QAQC-CPR-073 Concrete Pouring Request - RTW Basement/Zone 3B 17-Feb-2020 - Engr. Oliver Banas COMPLETED
92 UMN-QAQC-FSR-073 Form Stripping Request - RTW Basement/Zone 3B 17-Feb-2020 - Engr. Oliver Banas COMPLETED
93 UMN-QAQC-AFI-074 Application for Inspection (Rebar) - FTG Basement/Zone 3B 18-Feb-2020 - Engr. Oliver Banas COMPLETED
94 UMN-QAQC-FER-074 Form Enclosure Request - FTG Basement/Zone 3B 18-Feb-2020 - Engr. Oliver Banas COMPLETED
95 UMN-QAQC-CPR-074 Concrete Pouring Request - FTG Basement/Zone 3B 18-Feb-2020 - Engr. Oliver Banas COMPLETED
96 UMN-QAQC-FSR-074 Form Stripping Request - FTG Basement/Zone 3B 18-Feb-2020 - Engr. Oliver Banas COMPLETED
97 UMN-QAQC-AFI-075 Application for Inspection (Rebar) - RTW Basement/Zone 3A 19-Feb-2020 - Engr. Oliver Banas COMPLETED
98 UMN-QAQC-FER-075 Form Enclosure Request - RTW Basement/Zone 3A 19-Feb-2020 - Engr. Oliver Banas COMPLETED
99 UMN-QAQC-CPR-075 Concrete Pouring Request - RTW Basement/Zone 3A 19-Feb-2020 - Engr. Oliver Banas COMPLETED
100 UMN-QAQC-FSR-075 Form Stripping Request - RTW Basement/Zone 3A 19-Feb-2020 - Engr. Oliver Banas COMPLETED
101 UMN-QAQC-AFI-076 Application for Inspection (Rebar) - RTW Basement/Zone 3B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
102 UMN-QAQC-FER-076 Form Enclosure Request - RTW Basement/Zone 3B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
103 UMN-QAQC-CPR-076 Concrete Pouring Request - RTW Basement/Zone 3B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
104 UMN-QAQC-FSR-076 Form Stripping Request - RTW Basement/Zone 3B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
105 UMN-QAQC-AFI-077 Application for Inspection (Rebar) - COLUMN 3rd Floor/Zone 2B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
106 UMN-QAQC-FER-077 Form Enclosure Request - COLUMN 3rd Floor/Zone 2B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
107 UMN-QAQC-CPR-077 Concrete Pouring Request - COLUMN 3rd Floor/Zone 2B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
108 UMN-QAQC-FSR-077 Form Stripping Request - COLUMN 3rd Floor/Zone 2B 19-Feb-2020 - Engr. Oliver Banas COMPLETED
109 UMN-QAQC-AFI-078 Application for Inspection (Rebar) - COLUMN Basement/Zone 3B 20-Feb-2020 - Engr. Oliver Banas COMPLETED
110 UMN-QAQC-FER-078 Form Enclosure Request - COLUMN Basement/Zone 3B 20-Feb-2020 - Engr. Oliver Banas COMPLETED
111 UMN-QAQC-CPR-078 Concrete Pouring Request - COLUMN Basement/Zone 3B 20-Feb-2020 - Engr. Oliver Banas COMPLETED
112 UMN-QAQC-FSR-078 Form Stripping Request - COLUMN Basement/Zone 3B 20-Feb-2020 - Engr. Oliver Banas COMPLETED
113 UMN-QAQC-AFI-079 Application for Inspection (Rebar) - COLUMN/BEAM/SLAB Grnd Floor/Zone 3A 20-Feb-2020 - Engr. Oliver Banas
COMPLETED
114 UMN-QAQC-FER-079 Form Enclosure Request - COLUMN/BEAM/SLAB Grnd Floor/Zone 3A 20-Feb-2020 - Engr. Oliver Banas COMPLETED
115 UMN-QAQC-CPR-079 Concrete Pouring Request - COLUMN/BEAM/SLAB Grnd Floor/Zone 3A 20-Feb-2020 - Engr. Oliver Banas COMPLETED
116 UMN-QAQC-FSR-079 Form Stripping Request - COLUMN/BEAM/SLAB Grnd Floor/Zone 3A 20-Feb-2020 - Engr. Oliver Banas COMPLETED
117 LRNAG-200220-0017 Concrerete Compressive Strength Test Result Varies 20-Feb-2020 - Engr. Oliver Banas COMPLETED
118 UMN-QAQC-AFI-080 Application for Inspection (Rebar) - SUMPIT Basement/Zone 3B 21-Feb-2020 - Engr. Oliver Banas COMPLETED
119 UMN-QAQC-FER-080 Form Enclosure Request - SUMPIT Basement/Zone 3B 21-Feb-2020 - Engr. Oliver Banas COMPLETED
120 UMN-QAQC-CPR-080 Concrete Pouring Request - SUMPIT Basement/Zone 3B 21-Feb-2020 - Engr. Oliver Banas COMPLETED
121 UMN-QAQC-FSR-080 Form Stripping Request - SUMPIT Basement/Zone 3B 21-Feb-2020 - Engr. Oliver Banas COMPLETED
122 UMN-QAQC-AFI-081 Application for Inspection (Rebar) - COLUMN/BEAM/SLAB 5th Floor/Zone 2A 22-Feb-2020 - Engr. Oliver Banas
COMPLETED
123 UMN-QAQC-FER-081 Form Enclosure Request - COLUMN/BEAM/SLAB 5th Floor/Zone 2A 22-Feb-2020 - Engr. Oliver Banas COMPLETED
124 UMN-QAQC-CPR-081 Concrete Pouring Request - COLUMN/BEAM/SLAB 5th Floor/Zone 2A 22-Feb-2020 - Engr. Oliver Banas COMPLETED
125 UMN-QAQC-FSR-081 Form Stripping Request - COLUMN/BEAM/SLAB 5th Floor/Zone 2A 22-Feb-2020 - Engr. Oliver Banas COMPLETED
126 UMN-QAQC-AFI-082 Application for Inspection (Rebar) - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
127 UMN-QAQC-FER-082 Form Enclosure Request - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
128 UMN-QAQC-CPR-082 Concrete Pouring Request - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
129 UMN-QAQC-FSR-082 Form Stripping Request - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
130 UMN-QAQC-AFI-083 Application for Inspection (Rebar) - COLUMN Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
131 UMN-QAQC-FER-083 Form Enclosure Request - COLUMN Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
132 UMN-QAQC-CPR-083 Concrete Pouring Request - COLUMN Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
133 UMN-QAQC-FSR-083 Form Stripping Request - COLUMN Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
134 UMN-QAQC-AFI-084 Application for Inspection (Rebar) - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
135 UMN-QAQC-FER-084 Form Enclosure Request - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
136 UMN-QAQC-CPR-084 Concrete Pouring Request - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
137 UMN-QAQC-FSR-084 Form Stripping Request - RTW Basement/Zone 3B 24-Feb-2020 - Engr. Oliver Banas COMPLETED
138 UMN-QAQC-AFI-085 Application for Inspection (Rebar) - RTW FOOTING Foundation/Zone 3B 26-Feb-2020 - Engr. Oliver Banas COMPLETED
139 UMN-QAQC-FER-085 Form Enclosure Request - RTW FOOTING Foundation/Zone 3B 26-Feb-2020 - Engr. Oliver Banas COMPLETED
140 UMN-QAQC-CPR-085 Concrete Pouring Request- RTW FOOTING Foundation/Zone 3B 26-Feb-2020 - Engr. Oliver Banas COMPLETED
141 UMN-QAQC-FSR-085 Form Stripping Request - RTW FOOTING Foundation/Zone 3B 26-Feb-2020 - Engr. Oliver Banas COMPLETED
142 LRNAG-200227-0006 Concrerete Compressive Strength Test Result Varies 27-Feb-2020 - Engr. Oliver Banas COMPLETED
- Engr. Oliver Banas