MATERIAL REQUEST

No MR : 09/MR/06/20
Tanggal : 19 Juni 2020

NO MATERIAL QTY SAT HARGA JUMLAH PERUNTUKAN AREA

1 Kawat Bendrat 10 Roll Cash 300,000 3,000,000 Dinding PTT


2 Paku 10 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
3 Paku 7 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
4 Paku 5 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
5 Paku 3 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
6 Paku Beton 7cm 3 Dus Cash 35,000 105,000 Pinjeman benang pasangan hebel Control Room lt.1
7 Paku Beton 5cm 3 Dus Cash 35,000 105,000 Pinjeman benang pasangan hebel Control Room lt.1
8 Pasir 1 m3 Cash 240,000 240,000 Screed lt. 2 Control Room & Beton Decking
9 Semen 25 Zak Cash 56,000 1,400,000 Screed lt. 2 Control Room & Beton Decking
10 Curing compound 25 L Cash 320,000 8,000,000 Curing dinding PTT
11 Beton k400 75 m3/ADM Cash 785,000 58,875,000 Cor Dinding (tdk termasuk chamber) PTT stage 1 & 2
12 Sewa concrete pump 2 Unit cash 4,000,000 8,000,000 Cor Dinding (tdk termasuk chamber)
13 Waterstop PVC 3 Roll Cash 1,300,000 3,900,000 Pertemuan stage 1 dan 2 dindig PTT
14 Waterproofing Integral 112.5 L Cash 60,000 6,750,000 Integral cor dinding PTT
15 Pipa PVC Schedule 40. 10' 1 m Cash 300,000 300,000 Sparing Pipa PTT
16 Pipa PVC Schedule 40. 4' 4 m Cash 250,000 1,000,000 Sparing Pipa PTT
17 Lem Pipa PVC 5 klg Cash 52,000 260,000 Pemasangan sayap pipa PVC PTT
18 Terpal Uk.10x6 M 4 Roll Cash 250,000 1,000,000 Tutup Material Gudang lapangan
19 Busa 5mm 10 Kg Cash 20,000 200,000 Penahan air semen bekisting PTT
20 Meteran Tajima 7.5 M 5 Pcs Cash 105,000 525,000 Supervisor guntur, raban, piyan, bowo, cahyana
21 Stereofoam 20 lembar Cash 85,000 1,700,000 Stek lipat PTT
22 Lakban Coklat 5cm 2 roll Cash 16,000 32,000 Stek lipat PTT
23 Cutter & Pisau 3 pcs Cash 36,000 108,000 Stek lipat PTT
24 Isolasi Kertas 2cm 2 roll Cash 15,000 30,000 Marking Survey
25 Phylox Merah 1 Dus Cash 300,000 300,000 Marking Survey
26 Phylox Biru 1 Dus Cash 300,000 300,000 Marking Survey
27 Waterpass 60cm 2 pcs Cash 60,000 120,000 ngelot Survey
28 Sipatan Survey 1 pcs Cash 90,000 90,000 Marking Survey
29 Battery Theodolith cadangan 1 unit Cash 800,000 800,000 Alat theodolith Survey
30 Benang Lotan 2 Lusin Cash 80,000 160,000 ngelot Control room & PTT
31 Linggis/ Sikong 2 pcs Cash 75,000 150,000 Bongkar bekisting PTT
32 Gerobak/Angkong 1 pcs Cash 600,000 600,000 Langsir material PTT
33 Kunci Inggris 4 pcs Cash 105,000 420,000 Buka tutup baut separator PTT
34 Kunci sok 17 2 pcs Cash 75,000 150,000 Buka Plastikon PTT
35 Kunci 'L' 16 2 pcs Cash 20,000 40,000 Setel Barbender pabrikasi Besi
36 Wofer Head 5 dus Cash 80,000 400,000 Fabrikasi bekisting PTT
37 Tremi 8'' 20 m Cash 50,000 1,000,000 Pengecoran dinding
38 Token (Mess Pekerja) 1 bulan Cash 200,000 200,000 Umum Mess Pekerja
39 Token (Mess Staff) 1 bulan Cash 200,000 200,000 Umum Mess Pekerja
40 Senter LED 2 pcs Cash 120,000 240,000 Checklist malam hari QC & Survey
41 Lampu HPIT 10 unit Cash 170,000 1,700,000 Penerangan area kerja All
42 Kabel 3x1.5 100 m Cash 13,000 1,300,000 Power Penerangan area kerja
43 Gagang Las 1 set Cash 90,000 90,000 Ganti yg rusak
44 Oli SAE 40 10 L Cash 25,000 250,000 maintanance alat Kompresor, molen
45 Oli SAE 50 10 L Cash 25,000 250,000 maintanance alat Stemper, Vibrator
46 Tang Betet 1 Pcs Cash 90,000 90,000 alat kerja mekanik
47 Soket Male/Female 20 set Cash 70,000 1,400,000 alat kerja mekanik
48 Gris/ Stemped 2 kg Cash 45,000 90,000 maintanance alat
49 Safety Boots warna kuning 10 psg Cash 45,000 450,000 No. 41 dan 42 Pekerja mandor
TOTAL CASH 114,720,000
50 U head 60 370 pcs 45,000 16,650,000 Perkuatan bekisting PTT
51 Leader 90' 1 set 30 set 300,000 9,000,000 Perkuatan bekisting PTT
52 Clamp Pipa Mati 2 Inch 150 pcs 25,000 3,750,000 Penahan scaffolding
52 Clamp Pipa Hidup 2 Inch 150 pcs 25,000 3,750,000 Penahan scaffolding
TOTAL SEWA 33,150,000
TOTAL PENGELUARAN MINGGU INI 147,870,000

Diajukan Oleh Diestimasi

Asep Cahyana Joko S


SM Logistik
MATERIAL REQUEST
No MR : 09/MR/06/20
Tanggal : 19 Juni 2020

NO MATERIAL QTY SAT HARGA JUMLAH PERUNTUKAN AREA

1 Kawat Bendrat 10 Roll Cash 300,000 3,000,000 Dinding PTT


2 Paku 10 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
3 Paku 7 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
4 Paku 5 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
5 Paku 3 cm 5 Dus/ 25kg Cash 420,000 2,100,000 Bekisting PTT
6 Paku Beton 7cm 3 Dus Cash 35,000 105,000 Pinjeman benang pasangan hebel Control Room lt.1
7 Paku Beton 5cm 3 Dus Cash 35,000 105,000 Pinjeman benang pasangan hebel Control Room lt.1
8 Pasir 1 m3 Cash 240,000 240,000 Screed lt. 2 Control Room & Beton Decking
9 Semen 25 Zak Cash 56,000 1,400,000 Screed lt. 2 Control Room & Beton Decking
10 Semen MU - 830 5 Zak Cash 265,000 1,325,000 Exposed dinding & Kolom Control Room
11 Semen MU - 380 10 Zak Cash 100,000 1,000,000 Pasang Hebel Control Room
12 Semen MU - 200 10 Zak Cash 115,000 1,150,000 Plester Acian Control Room
13 Calbon 1 Pail Cash 1,350,000 1,350,000 Sambungan beton PTT
14 Curing compound 25 L Cash 320,000 8,000,000 Curing dinding PTT
15 SIKA - 107 5 Zak Cash 295,000 1,475,000 Waterproffing atap control room
16 Beton k400 75 m3/ADM Cash 785,000 58,875,000 Cor Dinding (tdk termasuk chamber) PTT stage 1 &2
17 Waterstop PVC 3 Roll Cash 1,900,000 5,700,000 Pertemuan stage 1 dan 2 dindig PTT
18 Waterproofing Integral 112.5 L Cash 60,000 6,750,000 Integral cor dinding PTT
19 Pipa PVC Schedule 40. 10' 1 m Cash 300,000 300,000 Sparing Pipa PTT
20 Pipa PVC Schedule 40. 4' 4 m Cash 250,000 1,000,000 Sparing Pipa PTT
21 Lem Pipa PVC 5 klg Cash 52,000 260,000 Pemasangan sayap pipa PVC PTT
22 Terpal Uk.10x6 M 4 Roll Cash 250,000 1,000,000 Tutup Material Gudang lapangan
23 Busa 5mm 10 Kg Cash 20,000 200,000 Penahan air semen bekisting PTT
24 Meteran Tajima 7.5 M 5 Pcs Cash 105,000 525,000 Supervisor guntur, raban, piyan, bowo, cahyana
25 Stereofoam 20 lembar Cash 85,000 1,700,000 Stek lipat PTT
26 Lakban Coklat 5cm 2 roll Cash 16,000 32,000 Stek lipat PTT
27 Cutter & Pisau 3 pcs Cash 36,000 108,000 Stek lipat PTT
28 Isolasi Kertas 2cm 2 roll Cash 15,000 30,000 Marking Survey
29 Phylox Merah 1 Dus Cash 300,000 300,000 Marking Survey
30 Phylox Biru 1 Dus Cash 300,000 300,000 Marking Survey
31 Waterpass 60cm 2 pcs Cash 60,000 120,000 ngelot Survey
32 Sipatan Survey 1 pcs Cash 90,000 90,000 Marking Survey
33 Battery Theodolith cadangan 1 unit Cash 800,000 800,000 Alat theodolith Survey
34 Benang Lotan 2 Lusin Cash 80,000 160,000 ngelot Control room & PTT
35 Linggis/ Sikong 2 pcs Cash 75,000 150,000 Bongkar bekisting PTT
36 Gerobak/Angkong 2 pcs Cash 600,000 1,200,000 Langsir material PTT
37 Kunci Inggris 4 pcs Cash 105,000 420,000 Buka tutup baut separator PTT
38 Kunci sok 17 2 pcs Cash 75,000 150,000 Buka Plastikon PTT
39 Kunci 'L' 16 2 pcs Cash 20,000 40,000 Setel Barbender pabrikasi Besi
40 Wofer Head 5 dus Cash 80,000 400,000 Fabrikasi bekisting PTT
41 Tremi 8'' 20 m Cash 50,000 1,000,000 Pengecoran dinding
42 Token (Mess Pekerja) 1 minggu Cash 200,000 200,000 Umum Mess Pekerja
43 Token (Mess Staff) 1 minggu Cash 200,000 200,000 Umum Mess Pekerja
44 Senter LED 2 pcs Cash 120,000 240,000 Checklist malam hari QC & Survey
45 Lampu HPIT 10 unit Cash 170,000 1,700,000 Penerangan area kerja All
46 Kabel 3x1.5 100 m Cash 13,000 1,300,000 Power Penerangan area kerja
47 Gagang Las 1 set Cash 90,000 90,000 Ganti yg rusak
48 Oli SAE 40 10 L Cash 25,000 250,000 maintanance alat Kompresor, molen
49 Oli SAE 50 10 L Cash 25,000 250,000 maintanance alat Stemper, Vibrator
50 Tang Betet 1 Pcs Cash 90,000 90,000 alat kerja mekanik
51 Soket Male/Female 20 set Cash 70,000 1,400,000 alat kerja mekanik
52 Gris/ Stemped 2 kg Cash 45,000 90,000 maintanance alat
53 Safety Shoes (Staff) 6 psg Cash 150,000 900,000 Cahyana 42, Ardi 43, Saudi 41, Raban 41 , Fathan , Guntur 41
54 Safety Shoes (Harian) 4 psg Cash 90,000 360,000 Yahya 42, Hary 42, Dedi 41, Piyan 42
55 Safety Boots warna kuning 10 psg Cash 45,000 450,000 No. 41 dan 42 Pekerja mandor
56 Daleman Helem 10 pcs Cash 25,000 250,000 Pekerja
57 Sarung Tangan Kombinasi 10 pcs Cash 27,000 270,000 Tukang besi dan kayu
58 Helm Staff 5 pcs Cash 45,000 225,000
59 Masker 30 pcs Cash 10,000 300,000
60 Tambang 10mm 1 roll Cash 150,000 150,000 sangkutan body harnes
61 Body Harnes Hook Double 10 set Cash 380,000 3,800,000 Pekerja
62 Isi APAR 1 tbg Cash 260,000 260,000
63 Kacamata Googles 6 pcs Cash 30,000 180,000 Pekerja gerinda dan bobokan
64 Sticker Induction 50 pcs Cash 3,846 192,308 safety
65 Rompi Pekerja warna orange 10 pcs Cash 20,000 200,000 Pengganti yg rusak
66 Plastik laminating Id Card 2 dus Cash 70,000 140,000 ID card staff dan pekerja
67 Karung 50 pcs Cash 3,000 150,000 Kebersihan Proyek
68 Plester 1 Roll Cash 25,000 25,000 P3K
69 Kassa Gulung 2 dus Cash 20,000 40,000 P3K
70 Kassa Sterill 2 dus Cash 20,000 40,000 P3K
TOTAL CASH 122,902,308
71 U head 60 370 pcs 45,000 16,650,000 Perkuatan bekisting PTT
72 d 115 btg 55,000 6,325,000 Perkuatan bekisting PTT
73 Leader 90' 1 set 30 set 370,000 11,100,000 Perkuatan bekisting PTT
74 Clamp Pipa Mati 2 Inch 150 pcs 7,500 1,125,000 Penahan scaffolding
75 Clamp Pipa Hidup 2 Inch 150 pcs 7,500 1,125,000 Penahan scaffolding
76 Deposit Uang sewa 36,325,000
TOTAL SEWA 36,325,000
TOTAL PENGELUARAN MINGGU INI 159,227,308

Diajukan Oleh Diestimasi

SPV Joko