You are on page 1of 11

Project: PROPOSED THREE-STOREY with ROOFTOP COMMERCIAL /RESIDENTIAL BUILDING

FAVI LAGUNA BLDG.


Location: Pulo, Sta Cruz, Sta. Rosa, Laguna
Owner: First AVPR-Venture Incorporated
Subject: Bid Proposal - General Construction Works and Architectural Works
Date:

Item Material Labor / Equipt Total


Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
I. Mobization / Demobilization lot

II. Permit & Taxes


1 Building Permit (Not Applicable) lot
2 Occupancy Permit lot
3 Contractor's Tax lot
4 Others (Pls. specify)
sub -total "Permit & Tax"

III. Bonds & Insurances


1 Performance Bond, 25% lot
2 Surety Bond (for D/P ), 15% lot
3 Guarantee Bond, 10% lot
4 CARI Insurance lot
5 Contractors Employees Accident Insurance & CGLI lot
6 Others (Pls. specify)
sub-total "Bonds & Insurances"

IV. General Requirements


1.0 Temporary Facilities
1 Temporary Facilities units
2 Temporary utilities
Power mos
Water mos
Communication mos
3 Security mos
sub-total "Temporary Facilities"

2.0 Material Testing lot

3.0 Safety Requirements & Housekeeping

4.0 As-Built Plan lot

5.0 Others (Pls. Specify)

Page 1 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
sub - total " General Requirements"

V. STRUCTURAL WORKS
1. Site Works
1 Site Clearing sq.m.

Removal of vegetation at the site, etc, including stripping of


sod and top soil and tee pruning for the site clearing.

2 Soil Poisoning sq.m.


Supply and application of soil treatment chemicals to
prevent termites including usage of tools and equipment to
complete the works.
3 Gravel Bedding / Compaction sq.m.
Aggregate base course shall include spreading, compacting,
leveling, use of plant, tools, equipment and all necessary
items and fixing accessories to complete the works as
required by the specifications.
4 Layout & Staking sq.m.
5 Dewatering lot
6 Others (Pls. Specify)
sub - total "Site Works"

2. Excavation Works
1 Structural Excavation cu.m.
2 Backfilling / Compaction cu.m.
3 Earthfilling / Compaction cu.m.
4 Disposal -
5 Others (Pls. Specify)
sub - total "Excavation Works"

3. Concreting Works, 3000psi


Supply, delivery and placing of concrete including necessary
grouting, vibrating hammering, tamping, consolidating, curing
hardening, wetting, sealing, brooming, and scratching,
protecting, sampling, provision of necessary extended
chutes and mixing boards, usage of equipment and tools.

1 Footing cu.m.
2 Tie Beam cu.m.
3 Wall footing cu.m.
4 Slab on Fill cu.m.
5 Columns cu.m.
6 Suspended Beams & Girders cu.m.

Page 2 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
7 Suspended Slab cu.m.
8 Stairs cu.m.
9 Parking cu.m.
10 Septic Tank
11 Others:/ Pls specify
sub - total " Concreting Works"

4. Rebar Works / Grade 40

Supply, fabrication, installation, including all necessary


splices, dowels, haunches, control joints, chair bars,spacers,
all necessary hardwares and fixing accessories, usage of
tools and equipment., includes supply of G.I. wire # 16.

1 Footing kgs
2 Tie Beam kgs
3 Wall footing kgs
4 Slab on Fill kgs
5 Columns kgs
6 Suspended Beams & Girders kgs
7 Suspended Slab kgs
8 Stairs kgs
9 Parking kgs
10 Septic Tank
11 Others:/ Pls specify
sub - total " Rebar Works"

5. Formworks
Supply, fabrication, installation, stripping and/or leaving of
formworks with the actual surface in contact with the
concrete, including provision of block-outs, chamfered
edges, notching and overlaps, necessary greasing and/or
coating with form oil, all necessary hardware, fixing
accessories, scaffolding, shoring, staging, usage of plant,
equipment and tools.

1 Footing sq.m.
2 Tie Beam sq.m.
3 Wall Footing sq.m.
4 Slab on Fill sq.m.
5 Columns sq.m.
6 Suspended Beams & Girders sq.m.
7 Suspended Slab / metal decking sq.m.
8 Stairs sq.m.

Page 3 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
9 Parking sq.m.
10 Septic Tank
12 Others ( please specify )
sub - total " Formworks"

sub - total " Structural Works"

VI. ARCHITECTURAL WORKS


1. Masonry Works
Supply and installation of concrete masonry unit, including
1 6" CHB m²
2 4" CHB m²
3 Lintel beam l.m.
4 Stiffiner Column l.m.
5 25mm Groove Reveal @ Exterior Walls l.m.
1 12mm x 12mm groves, phase 1 ramp sq.m.
1 12mm x 12mm groves, phase 2 sq.m.
6 Wheel Stop (1.8m length/unit) l.m.
7 Others:/ Pls specify
sub - total "Masonry Works"

2. Floor Finishes

Supply and application of portland cement plaster in plain,


smooth finish on concrete masonry units and concrete
surfaces, concrete topping, including surface preparation,
removing of loose concrete and laitance, scaffolding and the
usage of necessary tools and equipment to complete the
works.

1 Smooth Cement sq.m.


2 Plain cement sq.m.
3 concrete topping sq.m.
4 Others:/ Pls specify
sub - total "Floor Finishes "

3. Wall Finishes
1 Exterior Plastering m²
2 Interior Plastering m²

Supply and application of portland cement plaster in plain,


smooth finish on concrete masonry units and concrete
surfaces including scaffolding and the usage of necessary
tools and equipment to complete the works.

Page 4 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
3 6mm thk ficem board on metal furrings, double walling, sq.m.

Supply and instalaltion of double walling ficem board


including fixing supports, furring. Channels, usage of tools
and equipment to complete the works.

4 Aluminum Composite panel m²

Supply and instalaltion of aluminum composite panel,


including fixing supports, anchorage, usage tools and OSM OSM
equipment to complete the works.

5 Others:/ Pls specify


sub - total "Wall Finishes "

4. Ceiling Finishes
1 12mm thk gypsum board on metal furring in paint fin. sq.m.

Supply and instalaltion of gypsum board including fixing


supports, furring. Channels, usage of tools and equipment to
complete the works.

2 12mm thk MR gypsum board on metal furring in paint fin. sq.m.

Supply and installation of gypsum board including fixing


supports, furring. Channels, usage of tools and equipment to
complete the works.

0.60 x0.60m acoustic ceiling board on powder coated


3 sq.m.
aluminum T-runners

Supply and installation of acoustic ceiling board including


fixing supports, furring. Channels, usage of tools and
equipment to complete the works.

4 slab softfit, skimcoat sq.m.


Supply and application of skimcoat on concrete surfaces,
usage of tools and equipment to complete the works.

5 6mm thk ficem board on metal furrings, painted sq.m.

Supply and installation of ficem board board including fixing


supports, furring. Channels, usage of tools and equipment to
complete the works.
8 Others:/ Pls specify

Page 5 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
sub - total "Ceiling Finishes "

5. Doors

D - 1 , 1.80m x 2.40m, double swing, w/ aluminum tubular


1 sets OSM OSM
steel frame,12mm thk tempered clear glass

D - 2, 1.0 x 2.40m, fixed & swing frameless, 12mm thk


2 set OSM OSM
tempered clear glass
D - 3, 1.0 x 2.40m, fixed & swing frameless, 12mm thk
3 sets OSM OSM
tempered clear glass
D - 3a, 1.0 x 2.40m, fixed & swing frameless, 12mm thk
4 sets OSM OSM
tempered clear glass
5 D-4, 0.80 x 2.40m , flush hollow core marine plywood with sets
6 D-4a, 0.80 x 1.80m , flush hollow core marine plywood, sets
7 D - 5, 0.80 x 2.40m 45mm thk panel door, kd tanguile, sets
8 D-6, 1.0 x 2.40m , flush hollow core marine plywood, sets
9 D - 7, 1.50 x 2.80m, fixed & swing aluminum tubular steel, sets OSM OSM
10 D - 8, 0.80 x 2.40m, fire rated door, aluminum tubular steel, sets
11 D - 9, 0.80 x 2.40m, swing door, aluminum tubular steel, sets OSM OSM
12 D-10, 0.80 x 2.10m , fire rated,aluminum tubular ste,painted sets

D - 11, 7.0 x 2.80m, fixed and double sliding door, aluminum


13 set OSM OSM
tubular steel, powder coated fin with 10mm thk clear glass

14 D - 12, 4.50 x 4.05m, fixed, accordian and swing metal set


15 D - 13, 4.125 x 3.80m, fixed, accordian and swing metal sets
16 D - 14, 2.00 x 4.050m, fixed, accordian and swing metal set
17 D - 15, 2.00 x 3.25m, fixed, accordian and swing metal set
18 D - 16, 4.50 x 3.60m, rool-up door set OSM OSM
19 Others:/ Pls specify
sub - total "Doors"

6. Windows (By Others)


1 W - 1, 7.60 x 3.80m, fixed, aluminum tubular steel with set OSM OSM
2 W - 2, 4.00 x 3.80m, fixed and awning, aluminum tubular set OSM OSM
3 W - 3, 4.00 x 3.80m, fixed and awning, aluminum tubular set OSM OSM
4 W - 4, 1.40 x 3.80m, frameless, with 10mm thk cleared set OSM OSM
5 W - 5, 3.0 x 2.80m fixed and awning, frameless, blue sets OSM OSM
6 W - 5, 9.65 x 2.80m fixed and awning, frameless, blue sets OSM OSM
7 W - 6, 7.50 x 1.40m, fixed and sliding, aluminum tubular sets OSM OSM
8 W - 7, 3.55 x1.40m, fixed and sliding, aluminum tubular sets OSM OSM
9 W - 7a, 3.50 x1.40m, fixed and sliding, aluminum tubular sets OSM OSM
10 W - 8, 3.38 x 2.80m, fixed and swing, frameless, with 10mm sets OSM OSM
11 W - 8a, 3.38 x 2.80m, fixed and swing, frameless, with sets OSM OSM

Page 6 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
12 W - 9, 2.375 x 1.40m, fixed and awning, aluminum tubular set OSM OSM
13 W - 10, 1.39 x 1.35m, fixed and awning, aluminum tubular set OSM OSM
W - 11, 2.375 x 1.35m, fixed and awning, aluminum tubular
14 set OSM OSM
steel, with cleared tempered glass, powder coated fin

W - 12, 2.15 x 0.60m, awning, aluminum tubular steel, with


15 set OSM OSM
8mm cleared tempered glass, powder coated fin

W - 13, 1.60 x 0.60m, awning, aluminum tubular steel, with


16 set OSM OSM
8mm cleared tempered glass, powder coated fin

W - 14, 2.0 x 0.40m, awning, aluminum tubular steel, with


17 set OSM OSM
8mm cleared tempered glass, powder coated fin

W - 15, 0.70 x 0.40m, fixed and awning, aluminum tubular


18 set OSM OSM
steel, with 8mm cleared tempered glass, powder coated fin

W - 16, 0.90 x 0.40m, fixed and awning, aluminum tubular


19 set OSM OSM
steel, with 8mm cleared tempered glass, powder coated fin

W - 17, 0.82 x 0.75m, fixed and awning, aluminum tubular


20 set OSM OSM
steel, with 8mm cleared tempered glass, powder coated fin

W - 18, 1.00 x 1.40m, awning, aluminum tubular steel, with


21 sets OSM OSM
cleared tempered glass, powder coated fin

W - 19, 1.40 x 0.40m, awning, aluminum tubular steel, with


22 sets OSM OSM
cleared tempered glass, powder coated fin

W - 20, 0.50 x 0.40m, awning, aluminum tubular steel, with


23 set OSM OSM
cleared tempered glass, powder coated fin

8 Others:/ Pls specify

sub - total "Windows"

7. Tiles Work
Installation of "Owner Supplied Materials" / OSM tiles
including adhesives, grout, usage of tools and equipment to
complete the works.
1 0.60 x 0.60m, polished porcelain tiles, OSM sq.m. OSM
2 0.60 x 0.60m, unpolished porcelain tiles, OSM sq.m. OSM
3 0.3 x 0.3 unpolished porcelain tiles, OSM sq.m. OSM

Page 7 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
4 0.30 x 0.30m, unglazed ceramic tiles, OSM sq.m. OSM
5 0.60 x 0.60m, carpet tiles, OSM sq.m. OSM
6 Stair nosing l.m. OSM
7 Others:/ Pls specify
sub - total " Tiles Works"

8. Painting Works

Supply and application of specified paint and coatings


including all necessary surface preparation treating,
neutralizing, patching, sanding, grinding, cleaning, primary
coating, usage of scaffolding, temporary platforms,
equipment and tools to complete the works. (BOYSEN)

1 Semi-gloss Paint @ Interior Walls sq.m.


2 Semi-Gloss Paint @ Slab Soffit sq.m.
3 Textured Paint Finish @ Exterior Walls sq.m.
4 Gypsum Board sq.m.
` 5 slab softfit in paint finish sq.m.
6 6mm thk ficem board on metal furrings, painted sq.m.
7 Door Paint sq.m.
8 Epoxy paint finish on Smooth Cement finish sq.m.
` 9 Painting works, Stair @ warehouse l.m.
` 10 Painting works, solid wood @ main stair l.m.
11 Yellow Traffic Paints @ Parking Slots & Directional Arrows sq.m.
12 Zebra Paint @ Wheel Stop & Column Guards sq.m.
13 Stair Railings sq.m.
` 14 Others:/ Pls specify
sub - total "Painting Works"

9. Thermal & Moisture Protection

Supply and installation of required materials for


waterproofing in accordance with the manufacturer's
specification including preparation, chipping, cleaning ,
usage of tools and equipment to complete the works.

1 4.5kg Waterproofing Membrane m²


2 Poured Concrete with Waterproofing sq.m.
3 Roof insulation sq.m.
4 Others:/ Pls specify
sub - total "Waterproofing"

10. Roofing Works

Page 8 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount

Supply and installation of roofing sheet, structural roof


framing including support, fixing accessories, connector
plates,etc..including consumables and the usage of
necessary tools and equipment as require to complete the
works

@ Rooftop
1 Polycarbonate roofing sq.m.
2 S/S gutter gauge 24 l.m.
3 Roof drain, unilex or approved equal pcs.
4 50mm x 150mm x 1.5mm, tubular bar purlins kls.
5 Miscellaneous / Consumables lot
6 Others:/ Pls specify
sub - total "Roofing Works @ rooftop"

@ GF Service Area
1 0.6mm pre-painted G.I. sheet sq.m.
3 S/S gutter gauge 24 l.m.
4 Roof drain, unilex or approved equal pcs.
5 Steel trusses, 50mm x50mm x kls.
6 50mm x 100mm x 1.5mm, c purlins kls.
7 Miscellaneous / Consumables lot
8 Others:/ Pls specify
sub - total "Roofing Works @ rooftop"

11. Wood and Cabinet Works


Supply and installation of laminated cabinet, solid surface
countertop including support, fixing accessories, connector
1 plates,etc..including consumables and the usage of
necessary tools and equipment as require to complete the
works.
Wash Area @ GF, 1.80 l.m. lot OSM OSM
Kitchen @ 2F, 2.42 l.m. lot OSM OSM
Pantry @ 3F , 2.45 l.m. lot OSM OSM
Dirty Kitchen @ Rooftop, 2.30 l.m. lot OSM OSM
Supply and installation of wooden stair steps including
2 support, fixing accessories, finishes, usage of tools and OSM
equipment to complete the works.

12' x 2" x 5', solid wood, stained finish, main stair pcs. OSM

50mm x 25mm solid wood handrail, stain finish in stainless


1 l.m. OSM OSM
steel floor mounted railing, main stair

Page 9 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount

1 50mm diameter solid wood handrail, main stair l.m. OSM OSM
sub - total "Wood and Cabinet Works"

12. Window Grills (By others)

Supply, fabrication and installation of window grills 12mm


dia. round bar including fixing supports and accessories,
usage of tools and equipment to complete the works.

1 W - 14, 2.0 x 0.40m set OSM OSM


2 W - 15, 0.70 x 1.0m set OSM OSM
3 W - 16, 0.90 x 1.0m set OSM OSM
4 W - 18, 1.00 x 1.40m sets OSM OSM
5 W - 19, 1.40 x 0.40m sets OSM OSM
sub - total "Window Grills"

13. Floor Mounted Railing


Stainless steel railing, 25mm x 50mm tubular and 16mm dia
1 l.m. OSM OSM
s/s balluster , main stair
50mm x 50mm tubular stainless steel handrail, stair @
2 l.m. OSM OSM
commercial

3 50mm x 25mm tubular bar hand rail, stair @ warehouse l.m.


4 50mm dia. Stainless steel railing, phase 1 and phase 2 l.m. OSM OSM
5 Balcony Railing l.m. OSM OSM
6 Rooftop railing l.m. OSM OSM
` 7 Others:/ Pls specify
sub - total "Floor Mounted Railing"

14. Wall Mounted Railing

1 50mm x 50mm tubular stainless steel, stair @ commercial l.m. OSM OSM

2 50mm x 25mm tubular bar,stair @ warehouse l.m.


3 50mm dia. Stainless steel railing, phase 1 and phase 2 l.m. OSM OSM
` 4 Others:/ Pls specify
sub - total "Wall Mounted Railing"

15. Steel Works

1 50mm x 300mm x 5/8", I-beam, stair @ warehouse pcs.

2 25mm x 25mm x 6mm thk angular frame,@ stair warehouse pcs.

Page 10 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount

3 3/16" thk checkered plate, in paint finish, @ stair warehouse pcs.

0.17m x 0.30m x 10mm thk plate with 4pcs - 16mm dia.


4 pcs.
Expansion bolt x 100mm long, stair warehouse

5 Steel fence @ rooftop, 2.3m x 21.5l.m. OSM OSM


6 Billboard, 4.50m x 6.00m
7 Water tank support kls.
8 Fire Exit Ladder lot
9 Others:/ Pls specify
sub - total "Steel Works"

16. Other Miscellaneous Works


1 Mirror (6mm thk. Mirror on Marine Plywood Backing) sq.m. OSM OSM
2 Others:/ Pls specify
sub - total "Other Misc. Works"

Total Structural & Architectural Works

Notes:
1. The 12% VAT is included in the proposal.

Prepared and Submiited by:

Bidder:

Authorized Signatory
Date: