BOQ Format - Arch - Struc PDF
BOQ Format - Arch - Struc PDF
Page 1 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
sub - total " General Requirements"
V. STRUCTURAL WORKS
1. Site Works
1 Site Clearing sq.m.
2. Excavation Works
1 Structural Excavation cu.m.
2 Backfilling / Compaction cu.m.
3 Earthfilling / Compaction cu.m.
4 Disposal -
5 Others (Pls. Specify)
sub - total "Excavation Works"
1 Footing cu.m.
2 Tie Beam cu.m.
3 Wall footing cu.m.
4 Slab on Fill cu.m.
5 Columns cu.m.
6 Suspended Beams & Girders cu.m.
Page 2 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
7 Suspended Slab cu.m.
8 Stairs cu.m.
9 Parking cu.m.
10 Septic Tank
11 Others:/ Pls specify
sub - total " Concreting Works"
1 Footing kgs
2 Tie Beam kgs
3 Wall footing kgs
4 Slab on Fill kgs
5 Columns kgs
6 Suspended Beams & Girders kgs
7 Suspended Slab kgs
8 Stairs kgs
9 Parking kgs
10 Septic Tank
11 Others:/ Pls specify
sub - total " Rebar Works"
5. Formworks
Supply, fabrication, installation, stripping and/or leaving of
formworks with the actual surface in contact with the
concrete, including provision of block-outs, chamfered
edges, notching and overlaps, necessary greasing and/or
coating with form oil, all necessary hardware, fixing
accessories, scaffolding, shoring, staging, usage of plant,
equipment and tools.
1 Footing sq.m.
2 Tie Beam sq.m.
3 Wall Footing sq.m.
4 Slab on Fill sq.m.
5 Columns sq.m.
6 Suspended Beams & Girders sq.m.
7 Suspended Slab / metal decking sq.m.
8 Stairs sq.m.
Page 3 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
9 Parking sq.m.
10 Septic Tank
12 Others ( please specify )
sub - total " Formworks"
2. Floor Finishes
3. Wall Finishes
1 Exterior Plastering m²
2 Interior Plastering m²
Page 4 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
3 6mm thk ficem board on metal furrings, double walling, sq.m.
4. Ceiling Finishes
1 12mm thk gypsum board on metal furring in paint fin. sq.m.
Page 5 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
sub - total "Ceiling Finishes "
5. Doors
Page 6 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
12 W - 9, 2.375 x 1.40m, fixed and awning, aluminum tubular set OSM OSM
13 W - 10, 1.39 x 1.35m, fixed and awning, aluminum tubular set OSM OSM
W - 11, 2.375 x 1.35m, fixed and awning, aluminum tubular
14 set OSM OSM
steel, with cleared tempered glass, powder coated fin
7. Tiles Work
Installation of "Owner Supplied Materials" / OSM tiles
including adhesives, grout, usage of tools and equipment to
complete the works.
1 0.60 x 0.60m, polished porcelain tiles, OSM sq.m. OSM
2 0.60 x 0.60m, unpolished porcelain tiles, OSM sq.m. OSM
3 0.3 x 0.3 unpolished porcelain tiles, OSM sq.m. OSM
Page 7 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
4 0.30 x 0.30m, unglazed ceramic tiles, OSM sq.m. OSM
5 0.60 x 0.60m, carpet tiles, OSM sq.m. OSM
6 Stair nosing l.m. OSM
7 Others:/ Pls specify
sub - total " Tiles Works"
8. Painting Works
Page 8 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
@ Rooftop
1 Polycarbonate roofing sq.m.
2 S/S gutter gauge 24 l.m.
3 Roof drain, unilex or approved equal pcs.
4 50mm x 150mm x 1.5mm, tubular bar purlins kls.
5 Miscellaneous / Consumables lot
6 Others:/ Pls specify
sub - total "Roofing Works @ rooftop"
@ GF Service Area
1 0.6mm pre-painted G.I. sheet sq.m.
3 S/S gutter gauge 24 l.m.
4 Roof drain, unilex or approved equal pcs.
5 Steel trusses, 50mm x50mm x kls.
6 50mm x 100mm x 1.5mm, c purlins kls.
7 Miscellaneous / Consumables lot
8 Others:/ Pls specify
sub - total "Roofing Works @ rooftop"
12' x 2" x 5', solid wood, stained finish, main stair pcs. OSM
Page 9 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
1 50mm diameter solid wood handrail, main stair l.m. OSM OSM
sub - total "Wood and Cabinet Works"
1 50mm x 50mm tubular stainless steel, stair @ commercial l.m. OSM OSM
Page 10 of 11
Item Material Labor / Equipt Total
Description Qty Unit
No. Unit Cost Amount Unit Cost Amount Unit Cost Amount
Notes:
1. The 12% VAT is included in the proposal.
Bidder:
Authorized Signatory
Date:
Page 11 of 11