You are on page 1of 1

1 TYPUCAL CHB WALL OPENING ELEVATION

S-2 3 SIDE ANCHORAGE DETAIL


2 TYPICAL MASONRY ELEVATION S-2
SCHEDULE OF MASONRY WORKS S-2 10 TYPICAL LINTEL BEAM DETAIL
S-2
BEAM MASONRY
CHB WALL HORIZONTAL
B (mm.) H (mm.) STIRRUPS HORIZONTAL BARS VERTICAL BARS
t (mm) BARS
100 100 200 2-10mm. Ø 10mm. Ø @ 300 10mm. Ø @ 600 mm. O.C. 10mm. Ø @ 600 mm. O.C.
150 150 200 4-10mm. Ø 10mm. Ø @ 300 10mm. Ø @ 600 mm. O.C. 10mm. Ø @ 600 mm. O.C.
200 200 200 4-10mm. Ø 10mm. Ø @ 300 10mm. Ø @ 600 mm. O.C. 10mm. Ø @ 600 mm. O.C.

5 TYPICAL BEAM & GIRDER RE-BAR LAYOUT 6 CORNER/EXTERIOR COLUMN TERMINATION BEND
S-2 S-2

4 BEAM RE-BAR TERMINATION END


S-2 NOTE: NOTE:
1. CENTER TO CENTER SPACING OF PIPE CLEAR DISTANCE BETWEEN
SLEEVES SHALL IN NO CASE BE LESS RE - BARS ARE TO BE
THAN 3 TIMES THE SLEEVE DIAMETER. STRICTLY MAINTAINED

2. PIPE SLEEVES OF ALUMINUM SHALL


NOT BE EMBEDDED IN STRUCTURAL
CONCRETE.

3. PIPE SLEEVES SHALL NOT BE LARGER


IN OUTSIDE DIMENSION THAN 1/3
THE OVERALL DEPTH OF THE BEAM.

4. PIPE SLEEVES SHALL BE LOCATED


WITHIN THE MIDDLE THIRD OF THE
BEAM DEPTH.

8 TYPICAL BEAM PENETRATION DETAIL 5. PIPE SLEEVES SHALL BE LOCATED


WITHIN THE MIDDLE THIRD OF BEAM 9 TYPICAL PLAN OF BEAM/GIRDER COLUMN JOINT
S-2 CLEAR SPAN.
S-2
7 INTERIOR COLUMN TERMINATION END
S-2

SHEET CONTENTS: SET NO. SHEET NO.


TYPICAL CHB WALL OPENING ELEVATION
TYPICAL MASONRY ELEVATION
R.C. EXTERIOR WALL SIDE ANCHORAGE DETAIL
TYPICAL LINTEL BEAM DETAIL 7
BEAM RE-BAR TERMINATION END
S
TYPICAL BEAM AND GIRDER RE-BAR LAYOUT
CORNER EXTERIOR COLUMN TERMINATION BEND 2 7 12
INTERIOR COLUMN TERMINATION BEND
TYPICAL BEAM PENETRATION DETAIL
TYPICAL PLAN OF BEAM/GIRDER COLUMN JOINT

You might also like