NOTE 7

NOTE 8 NOTE 8
DECK STIFFENING RIB DECK STIFFENING DECK STIFFENING RIB
RIB
STUD "STRONG" POSITION STUD "WEAK" POSITION STUD "WEAK" POSITION STUD "STRONG" POSITION

NEAREST SUPPORT BEAM CENTERLINE BEAM CENTERLINE NEAREST SUPPORT

A A
BEAM
CENTERLINE
SUPPORT SUPPORT
B-B (GIRDER OR COLUMN) (GIRDER OR COLUMN)
SINGLE STUD ORIENTATION ELEVATION

DECK STIFFENING RIB CL

NEAREST SUPPORT BEAM CENTERLINE

ADDITIONAL SHEAR CONNECTORS


AT MAXIMUM SPACING, SEE NOTE 4
1" MINIMUM
(TYPICAL)

1 STUD
PER FLUTE
B B N N1 N2 N... Nn N 0

2 STUDS
S

PER FLUTE

4 x STUD DIAMETER
0

CASE A CASE B CASE C


NARROW
FLANGE
WIDTH

2 STUDS UNIFORM LOAD MULTIPLE GIRDER SEGMENTS CANTILEVER


PER FLUTE

3 STUDS NOTES:
SS

PER FLUTE 1. N = NUMBER OF SHEAR CONNECTORS SPECIFIED ON PLAN. SHEAR CONNECTORS SHALL BE DISTRIBUTED ALONG
THE LENGTH OF THE BEAM AS SHOWN IN CASES A THROUGH C.
2. REFER TO GENERAL NOTES FOR PLAN NOTATION.
3. REFER TO GENERAL NOTES FOR SHEAR CONNECTOR DIAMETER AND LENGTH.
NARROW
FLANGE

4. MAXIMUM SPACING OF SHEAR CONNECTORS SHALL BE AS FOLLOWS.


WIDTH

3 STUDS
a. BEAMS PERPENDICULAR TO DECK SPAN: SMALLER OF 36" OR 8 TIMES TOTAL SLAB THICKNESS
S

PER FLUTE
b. BEAMS PARALLEL TO DECK SPAN: 8 TIMES TOTAL SLAB THICKNESS
5. WHERE THE SPECIFIED NUMBER OF SHEAR CONNECTORS IS LESS THAN THE BEAM SPAN LENGTH DIVIDED BY THE
MAXIMUM SPACING (SEE NOTE 4), ADDITIONAL SHEAR CONNECTORS SHALL BE PROVIDED SUCH THAT THE
4 x STUD DIAMETER
0

MAXIMUM SPACING IS NOT EXCEEDED AT ANY LOCATION IN THE SPAN.


0

6. WHERE STEEL DECK CORRUGATIONS DO NOT ALLOW FOR AN EVEN SPACING OF SHEAR CONNECTORS WITH ONE
STUD IN EACH FLUTE, ADDITIONAL STUDS IN A SECOND ROW (OR THIRD ROW WHERE REQUIRED) SHALL BE PLACED
4 STUDS SUCH THAT THE HIGHEST DENSITY OF SHEAR CONNECTORS OCCURS NEAR THE BEAM SUPPORT.
S

PER FLUTE 7. EACH SHEAR CONNECTOR TO BE PLACED IN "STRONG" POSITION (FURTHEST FROM BEAM CENTERLINE).
8. SHEAR CONNECTORS MAY ONLY BE PLACED IN "WEAK" POSITION WHEN THERE ARE MULTIPLE STUDS PER FLUTE.
REFER TO PLAN VIEW AT LEFT FOR PERMISSIBLE CONFIGURATIONS.
9. SHEAR CONNECTORS HAVE HIGHEST CAPACITIES WHEN PLACED AS SHOWN. IF STUDS ARE NOT PLACED PER
S = LARGER OF 3" OR THIS DETAIL, 25% MORE STUDS MUST BE INSTALLED. EQUALLY SPACE ADDITIONAL STUDS ALONG THE BEAM.
4 x STUD DIAMETER
A-A
PLAN

TYPICAL SHEAR CONNECTOR PLACEMENT DIAGRAMS - STUDS IN "STRONG" POSITION


08 NO SCALE

Saturday, September 11:53:27 2022, 17PM


COMPANY PROJECT OFFICE
ERBIL BRANCH STREET # 100, AMBARI # T3
MAIN TRAFFIC CENTER
BAGHDAD, IRAQ
Mobile: +964-7716574775 +964-7707044119
Email: world.hawks@yahoo.com

You might also like