PROJECT: Sts.

Francis and Paul Hospital


DATE: JUNE 25,2019
WEATHER: CLOUDY (AM), RAINING (PM)

As of June 25,2019 the works being done are :

Morning

 GROUND FLOOR
 Installation of HARDIFLEX
 Installation of metal furring
 Painting Works
 Electrical works
 SECOND FLOOR
 Installation if scaffoldings
 CHB laying of CR’s for the rooms
 Installations of steel door jamb
 OUTSIDE
 Assembling of steel bars for the beam and stirrups for the columns
 CHB laying

Afternoon

 GROUND FLOOR
 Installation of HARDIFLEX
 Installation of metal furring
 Painting Works
 Electrical works
 SECOND FLOOR
 Installation of scaffoldings
 CHB laying of CR’s for the rooms
 Installation of steel door jamb
 OUTSIDE
 Assembling of steel bars for the beams and stirrups for the columns
 CHB laying
DOCUMENTATION OF WORKS
ACCOMPLISHMENT
REPORT