THERMOTECH SYSTEMS LIMITED

AHMEDABAD, GUJARAT

COMMENTS RESPONSE SHEET (CRS)

Job No. 1920-77 P.O. No. SIPL/TSL/1501/19-20


Project Thermic Fluid Heater Package
Customer Name M/s. Sunita Impex Private Limited
End User Name M/s. Super Petro
Document No. TSL-SIPL-E&I-004 & 521 076 20 02 Rev. No. R01
Document Title PLC Panel Documents
Date 04-07-2020

Sr.
Comments Response SPPL Comment
No.
Please confirm that the PLC Panel will be IP 66 certified and Provide us Certificate and
panel is NEMA 4X, explosion- purge controller from P&F which catalogue for Control
proof and certified by will be Atex certified. The Panel
ATEX/IECEx. Provide us the considered purge controller is
Model and Data Sheet. suitable to mount and operate in
Zone 2 area.
1
As per contract there is an
option for the IP 66 or NEMA 4X
standard with purging. We are
providing IP 66 with Purging.

2 Request you to use Compactlogix As a package supplier normally, Till now we have
PLC (1769-L24ER-QB1B with we supply Micrologix 1400 from procured, installed and
1734 Point IO as reference) Rockwell. used a lot of heaters from
instead of Micrologix 1400.  Even in contract there was no different vendor of
reference of Compactlogix, we different country but
had not considered the same. none provided Micrologix
Kindly give confirmation on instead of Compactlogix
Micrologix as already our for heater. That is why we
procurement of parts is only mentioned vendor
completed. name as Allen Bradley.

If you want Compactlogix, there However, Micrologix


will be price implication of Rs. memory is only 10KB,
1,44,800. normally it is used for
You are requested to confirm the very small project. If you
same to enable to proceed think it will work for this
further. project without interrupt
than it is ok.

Page 1 of 2
Micrologix 1400 can be used for You are requested to confirm We need Modbus RTU for
Modbus RTU communication point no 2 for proceed further. DCS Communication,
3
with DCS. please confirm.

Please use the Safety During our discussions, client Use fuse instead.
barrier(pepperl-fuchs) for all had not mentioned any safety
instruments connection. barrier requirement.

If required, there will be price


implication of Rs. 4,55,000 as
4
there will be increase in panel
size due to addition of barriers.
You are requested to confirm the
same to enable to proceed
further.

There is no AO connection from Burner control valve will be Confirm that the Control
PLC. Please confirm that the operating via burner sequence Valve can be controlled
Control Valve can be controlled controller. (Manual setpoint of Valve
(Manual setpoint of Valve Burner modulation set point opening percentage) from
5
opening percentage) from HMI given through communication HMI and also can set the
and also can set the media between PLC and Burner seq. media temperature
temperature Setpoint at auto controller, hence no need for AO Setpoint at auto mode
mode from HMI. connection. from HMI.
There is no BMS connection in BMS connection diagram will be
the Panel. Please provide details shown in complete panel wiring
6
Connection drawing including diagram.
instrument connection to BMS.
Provide us Control system Complete wiring diagram will be
architecture with details submitted once point no 2 is
connection drawing, logic, and clear.
interlock diagram. Cause n Effect and control
7
philosophy will be submitted
instead of interlock diagram
once P&ID will be approved.

Prepared by,

Daxesh Patel

Page 2 of 2