LOAD-GENERATION BALANCE REPORT

Maximum Load/Demand till Date

Date: November 15, 2019 Date Time Load(MW)


Hours: 19:00 Hours 27-Dec-18 18:18hrs 399.35MW

Sl. No. Hydropower Plant Unit MW Name of Feeders Load (MW) Sign Remarks
Unit- I 99.58 400kV THP - Siliguri Fdr- I 110.45 +
Unit- II 116.81 400kV THP - Siliguri Fdr- II 0.00
Unit-IV & V under
Unit- III 0.00 400kV THP - Siliguri Fdr- IV 105.45 +
shutdown.
Unit- IV 0.00 400kV THP - Malbase Fdr- III 164.64 +
1 1020MW THP Unit-III at standby.
Unit- V 0.00 400kV Malbase - Siliguri 91.25 +
400kV THP_SILI II under
Unit- VI 170.08 - - -
Maintenace.
Error at Station/Auxiliary
Total 386.47 5.93
Consumption/Losses
Unit-I 0.00 400kV MHP - Jigmeling Fdr - I 93.80 +
Unit-II 0.00 400kV MHP - Jigmeling Fdr - II 95.30 +
Unit-III 86.39 400kV MHP - Jigmeling Fdr - III 0.00
Unit-IV 108.34 400kV MHP - Jigmeling Fdr - IV 0.00 Unit I at standby.
2 720MW MHP
- - 200MVA, 400/132kV ICT 0.00 Unit-II under shutdown
- - (Local Load) 0.00
Error at Station/Auxiliary
Total 194.73 5.63
Consumption/Losses
Unit- I 0.00 220kV CHP - Birpara Fdr- I 28.84 +
Unit- II 71.02 220kV CHP - Birpara Fdr- II 28.80 +
Unit- III 60.94 220kV CHP - Malbase Fdr- III 91.70 +
Unit- IV 60.73 220kV CHP - Semtokha Fdr- IV 23.06 +
- - 220kV Malbase - Birpara Fdr. -22.26 -
2 336MW CHP
- - 66kV CHP - Chumdo Fdr. 12.06 + Unit-I under shutdown
- - 66kV CHP - Gedu Fdr. 6.66 +
- - 3x3MVA, 66/11kV TFR 1.58 +
Error at Station/Auxiliary
Total 192.69 -0.01
Consumption/Losses
Unit- I 5.94 220kV BHP - Semtokha Fdr. 27.99 +
24MW BHP (U/S) Unit- II 5.94 66kV BHP - Lobeysa Fdr. 16.35 +
Total 11.88 220kV BHP - Tsirang Fdr. -9.21 -
3 Unit- I 12.29 5MVA, 66/11kV TFR 0.61 +
Unit- II 11.79 30MVA ICT, 220/66kV
40MW BHP (L/S)
Error at Station/Auxiliary
Total 24.08 0.22
Consumption/Losses
Unit-I 0.00 220kV DHPC - Tsirang Fdr. 37.30 +
Unit-II 37.56 220kV Jigmeling - Dagapela Fdr.
4 126MW DHPC - - 5MVA, 220/33kV TFR Unit I at Standby
Error at Station/Auxiliary
Total 37.56 0.26
Consumption/Losses
Unit- I 12.48 132kV KHP - Nangkhor Fdr- I 27.83 +
Unit-II 0.00 132kV KHP - Kilikhar Fdr- II 6.56 +
Unit- III 12.66 5MVA, 132/11kV TFR 0.50 +
Unit- IV 10.18 132kV Gelephu - Salakati Fdr. -9.64 -
5 60MW KHP Unit-II shutdown
- - 132kV Motanga - Rangia Fdr. 7.40 +
- - 220kV Tsirang - Jigmeling 25.53 +
Error at Station/Auxiliary
Total 35.32 0.43
Consumption/Losses

Note: Load summary on November 15, 2019 at 19:00hrs.

Total Generation Total Load [Generation - Total Load [Feeder


Sl. No Region Total Export/Import Load Balance
(MW) Export (MW)] Summation (MW)]
1 Western Grid 652.68 284.62 278.22 342.53 6.40
2 Eastern Grid 230.05 68.72 62.66 186.86 6.06
Total 882.73 353.34 340.88 529.39 12.46

Note: Load Summary on November 15, 2018 at 19:00hrs

19:00Hrs Load
Sl. No Region Day Peak Load (MW) Month Peak Load (MW)
(MW)
1 Western Grid 288.98 291.20 281.60
2 Eastern Grid 54.09 62.16 62.24
National 343.07 353.36 343.84
NOTES:

1. The Instantaneous load balance is calculated as (Total generation - (Total export-Import ) - Total domestic load) do not tend towards zero. This could be due to the following reasons:
i) Not all the meters are digital and nor are all the meter at all locations can be read at same time (say 9:00hrs) due to many meter to be read manually.
ii) The clocks of all the locations are not synchronized.
2. This report is generated to give an idea of the generation & load flow for the system at a particular instant.
LOAD-GENERATION BALANCE REPORT

Maximum Load/Demand till Date

Date: November 16, 2019 Date Time Load(MW)


Hours: 09:00 Hours 27-Dec-18 18:18hrs 399.35MW

Sl. No. Hydropower Plant Unit MW Name of Feeders Load (MW) Sign Remarks
Unit- I 100.26 400kV THP - Siliguri Fdr- I 82.20 +
Unit- II 99.03 400kV THP - Siliguri Fdr- II 0.00
Unit-IV & V under
Unit- III 0.00 400kV THP - Siliguri Fdr- IV 77.74 +
shutdown.
Unit- IV 0.00 400kV THP - Malbase Fdr- III 122.88 +
1 1020MW THP Unit-III at standby.
Unit- V 0.00 400kV Malbase - Siliguri 67.72 +
400kV THP_SILI-II under
Unit- VI 90.65 - - -
Maintenace.
Error at Station/Auxiliary
Total 289.94 7.12
Consumption/Losses
Unit-I 0.00 400kV MHP - Jigmeling Fdr - I 91.00 +
Unit-II 0.00 400kV MHP - Jigmeling Fdr - II 91.60 +
Unit-III 85.90 400kV MHP - Jigmeling Fdr - III 0.00
Unit-IV 100.20 400kV MHP - Jigmeling Fdr - IV 0.00 Unit-I at standby.
2 720MW MHP
- - 200MVA, 400/132kV ICT 0.00 Unit-II under shutdown
- - (Local Load)
Error at Station/Auxiliary
Total 186.10 3.50
Consumption/Losses
Unit- I 0.00 220kV CHP - Birpara Fdr- I 22.27 +
Unit- II 47.19 220kV CHP - Birpara Fdr- II 22.30 +
Unit- III 49.72 220kV CHP - Malbase Fdr- III 93.37 +
Unit- IV 51.19 220kV CHP - Semtokha Fdr- IV -6.17 -
- - 220kV Malbase - Birpara Fdr. -34.16 -
3 336MW CHP Unit-I under shutdownn.
- - 66kV CHP - Chumdo Fdr. 8.08 +
- - 66kV CHP - Gedu Fdr. 6.25 +
- - 3x3MVA, 66/11kV TFR 1.04 +
Error at Station/Auxiliary
Total 148.10 0.96
Consumption/Losses
Unit- I 5.89 220kV BHP - Semtokha Fdr. 44.72 +
24MW BHP (U/S) Unit- II 5.89 66kV BHP - Lobeysa Fdr. 14.55 +
Total 11.78 220kV BHP - Tsirang Fdr. -24.11 -
4 Unit- I 12.10 5MVA, 66/11kV TFR 0.37 +
Unit- II 11.60 30MVA ICT, 220/66kV
40MW BHP (L/S)
Error at Station/Auxiliary
Total 23.70 -0.05
Consumption/Losses
Unit-I 0.00 220kV DHPC - Tsirang Fdr. 35.91 +
Unit-II 36.12 220kV Jigmeling - Dagapela Fdr.
5 126MW DHPC - - 5MVA, 220/33kV TFR Unit-I Standby
Error at Station/Auxiliary
Total 36.12 0.21
Consumption/Losses
Unit- I 12.61 132kV KHP - Nangkhor Fdr- I 30.50 +
Unit-II 0.00 132kV KHP - Kilikhar Fdr- II 3.97 +
Unit- III 12.60 5MVA, 132/11kV TFR 0.20 +
Unit- IV 10.15 132kV Gelephu - Salakati Fdr. 1.84 +
6 60MW KHP Unit-II under shutdown
- - 132kV Motanga - Rangia Fdr. -8.97 -
- - 220kV Tsirang - Jigmeling 9.50 +
Error at Station/Auxiliary
Total 35.36 0.69
Consumption/Losses

Note: Load summary on November 16, 2019 at 09:00hrs.

Total Generation Total Load [Generation - Total Load [Feeder


Sl. No Region Total Export/Import Load Balance
(MW) Export (MW)] Summation (MW)]
1 Western Grid 509.64 271.57 263.33 238.07 8.24
2 Eastern Grid 221.46 37.02 32.83 184.44 4.19
Total 731.10 308.59 296.16 422.51 12.43

Note: Load Summary on November 16, 2018 at 09:00hrs

09:00Hrs Load
Sl. No Region Day Peak Load (MW) Month Peak Load (MW)
(MW)
1 Western Grid 244.79 282.89 293.93
2 Eastern Grid 46.68 57.21 62.30
National 291.47 340.10 356.23
NOTES:

1. The Instantaneous load balance is calculated as (Total generation - (Total export-Import ) - Total domestic load) do not tend towards zero. This could be due to the following reasons:
i) Not all the meters are digital and nor are all the meter at all locations can be read at same time (say 9:00hrs) due to many meter to be read manually.
ii) The clocks of all the locations are not synchronized.
2. This report is generated to give an idea of the generation & load flow for the system at a particular instant.