Non-Conformance Report: Date: Client: Location: Inspector: Inspected Item
Non-Conformance Report: Date: Client: Location: Inspector: Inspected Item
INSPECTOR :
Contrary to the requirements of: Project Specification # 051200 Page 6 - part 1.5 .B.7 saying
“Fabrication of any material or performance of any work shall not proceed until shop drawings have been
approved by Engineer”. The above columns are fabricated with drawings without approval by Engineer of
Record. The revised drawings are not similar to the approved drawing. Please See attached Summary of
revised drawing being used for fabrication compared against EOR approved drawing.