You are on page 1of 3

Client : Project:

Four laning of Parwanoo-Solan Section of No.:RBT -01


NH-22 Dated :-
Rev. No:-
Page : ___ of ___
BAROG TUNNEL

ROCK BOLT TEST


DATA SHEET
Date of Installation :---------------------- Date of Testing :----------------------------------------------

Chainage:- ---------------------------------------------Location :------------------------------------------------

Rock :- Classification :----------------Fracture Spacing :----------- Strength :-----------------

Bolt :- Diameter------------------------Strength :-----------------------------Length ---------------------

Displacement reading
Load (Kn) Remarks
Reading Displacement
load V/s Displacement

0 2 0 200

10 5 3
180
20 6 4

30 9 7
160

40 11 9

50 14 12 140

60 17 15
Load ( Ton)

120
70 19 17

80 21 19
100
90 24 22

100 25 23
80

110 28 26

130 29 27 60

140 30 28
40
150 31 29

160 32 30
20

170 33 31

180 34 32 0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50
190 35 33
Displacement(mm)

TEST RESULTS : Maximum Pull Force :-

Displacement at Maximum Pull Force :-----------------------Maximum Displacement in Test :-----------------------

Nature of Failure or Yeild :------------------------------------------------------------------------------------------------------------------

Other Remarks :----------------------------------------------------------------------------------------------------------------

Tested By Contractor : Checked By AE:

Name:---------------------------- Name:----------------------------

Sign:------------------------------ Sign:------------------------------

Date :----------------------------- Date :-----------------------------


Page-69
Tested By Contractor : Checked By AE:

Name:---------------------------- Name:----------------------------

Sign:------------------------------ Sign:------------------------------

Date :----------------------------- Date :-----------------------------

Page-69