Analysis of Rates

dk;Z dk uke& ftyk ;kstuk 2015&16 ds vUrZxr lqD[kh VkWi ls


fot; flag jkSrsyk ds ?kj rd lEidZ ekxZ A
Sr No Description Unit Cost Rs Remarks/
Input ref.
1 Excavation in Foundation for R/wall & B/wall in all type of soils and
rocks including lead, lift and disposal of surplus material as per
direction of engineer-in -charge.

Sor item No. 97511-16-1 Cum 291.20


Total :- 291.20 Per Cum
2 Random Rabble stone masonary laid dry in R/wall,B/ wall, Kharanja
etc. including supply of all material, labour T&P etc. required fo
proper completion of the work ( As per PWD Uttarakhand
specificatioin)

SOR item No. 97513-16-3 Cum 1985.00


Total 1985.00 Per Cum

J.E. A.E
DETAIL OF MEASUREMENT
dk;Z dk uke& ftyk ;kstuk 2015&16 ds vUrZxr lqD[kh VkWi ls fot;
flag jkSrsyk ds ?kj rd lEidZ ekxZ A
Sl. No. Item of work Unit No L. B. H/D Quantity
Excavation in Foundation for R/wall & B/wall in
all type of soils and rocks including lead, lift and
disposal of surplus material as per direction of
1 engineer-in -charge.

for kharanja Cum 8 1 15.00 1.50 0.10 18.00


for kharanja Cum 6 1 15.00 1.50 0.10 13.50
for kharanja Cum 6 1 12.00 1.50 0.10 10.80
Total :- Cum 42.30

Random Rabble stone masonary laid dry in


R/wall,B/ wall, Kharanja etc. including supply of
all material, labour T&P etc. required fo proper
2 completion of the work ( As per PWD
Uttarakhand specificatioin)

for kharanja Cum 8 1 15.00 1.50 0.20 36.00


for kharanja Cum 6 1 15.00 1.50 0.20 27.00
for kharanja Cum 8 1 12.00 1.50 0.20 28.80
Total :- Cum 91.80

JUNIOR ENGINEER ASSITANT ENGINEER


P.D.P.W.D. BHATWARI P.D.P.W.D. BHATWARI
P.D. P.W.D. BHATWARI
UTTARKASHI UTTARKASHI
BILL OF QUANTITY
dk;Z dk uke& ftyk ;kstuk 2015&16 ds vUrZxr lqD[kh VkWi ls fot; flag
jkSrsyk ds ?kj rd lEidZ ekxZ A
Si.No. Item of Works Quantity Unit Rate Amount
Excavation in Foundation for R/wall & B/wall in all
type of soils and rocks including lead, lift and disposal
1 of surplus material as per direction of engineer-in 42.30 Cum 291.20 12317.76
-charge.

Random Rabble stone masonary laid dry in R/wall,B/


wall, Kharanja etc. including supply of all material,
2 labour T&P etc. required fo proper completion of the 91.80 Cum 1985.00 182223.00
work ( As per PWD Uttarakhand specificatioin)

Total :- 194540.76

JUNIOR ENGINEER ASSITANT ENGINEER


P.D.P.W.D.BHATWARI P.D.P.W.D.BHATWARI
UTTARKASHI UTTARKASHI
SUMMERY OF ESTIMATED COST

dk;Z dk uke& ftyk ;kstuk 2015&16 ds vUrZxr lqD[kh VkWi ls fot; flag
jkSrsyk ds ?kj rd lEidZ ekxZ A
Si. No. Item of Work Amount

1 tyk ;kstuk 2015&16 ds vUrZxr lqD[kh VkWi ls


fot; flag jkSrsyk ds ?kj rd lEidZ ekxZ A 194540.76
contingecies (lum-sum) 5500.00
TOTAL 200040.76
Say :- 2.00 Lacs

JUNIOR ENGINEER ASSITANT ENGINEER EXECUTIVE ENGINEER


P.D.P.W.D. BHATWARI P.D.P.W.D. BHATWARI P.D.P.W.D.BHATWARI
UTTARKASHI UTTARKASHI UTTARKASHI
SCHEDULE - "B"
dk;Z dk uke& ftyk ;kstuk 2015&16 ds vUrZxr lqD[kh VkWi ls fot; flag jkSrsyk ds ?kj r
Earnest Money :- Rs.4000.00
lEidZ ekxZ A
Date of Calling Tender :-
Cost of Tender Form :- Rs. 75.00+13.50% VAT Date of Receiving Tender :-
Validity of Tender :- Date of Opening Tender :-
Time of Completion :- :-

Rate
Sl No Item Of Work Qty Unit Per
In Figure In Words
1 Excavation in Foundation for R/wall & B/wall in
all type of soils and rocks including lead, lift and
disposal of surplus material as per direction of 42.30 Cum Cum 291.20
Rs.TwO hundred Fifty
engineer-in -charge. one only

2 Random Rabble stone masonary laid dry in


R/wall,B/ wall, Kharanja etc. including supply of
all material, labour T&P etc. required fo proper Rs. One Thousand Five
completion of the work ( As per PWD 91.80 Cum Cum 1985.00 Hundred Eighty nine
Uttarakhand specificatioin)
only.

I/we hereby agree to execute the above work..............……………….....................% above/below/at par the rates filled
as above.
2
I/We tender my/our rates as above after taking fully into consideration the specification, special condition of the department for
the above work and rate quoted above are inclusive of all leads, lifts, royalty, municipal and toll charges and other incidential
expenses.
3 I/ We give below my/ our permanent postal address, any change in the address shall be intimated by me/us time to
time in writing to the engineer in charge. We shall make necessary arrangement at all time to receive any notice,
orders and communications that will be issued and sent to me/ us at this address. If any letter, communication sent
to the contractor received back by department undelivered, it will be deemed to have been delivered to me/us and
the department will be free to take action in view of the same without intimating me/ us. For any claim whatsoever
on this account. .

Contractor

Permanent postal address

Officer Inviting Officer Opening Officer Recommending Officer Accepting


Tender Tender Tender Tender
; flag jkSrsyk ds ?kj rd

You might also like