You are on page 1of 18

Republic of the Philippines

Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF JUNE 2019

JHS ACADEMIC DEPARTMENT (FIL-SCI)

TARGET ACCOMPLISMENT REMARKS


A. ACCESS

A.1 Learners Development


 On going  On going
1.1 Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.

1.2 Pre-Test Quarter

2. Learners Extra Curricular Activities

2.1 Assist students in participating the  ACR and Students  Done


DRRM (Earthquake Drill) Output
B. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

1. Used Instructional Materials in  On going  On going


delivery of the lesson.
2. LCD / DLL  On going  On going
3. Teachers using technology.  On going  On going
4. Teachers teaching.  On going  On going
C. CURRICULUM DEVELOPMENT
1. DLL/DLP weekly submitted with the  Submitted  On going
integration of 4A’s DLL/DLP weekly
2. Curriculum Guide and LCD  Competencies are  On going
submitted. followed according
to the CG / LCD.
D. STAFF DEVELOPMENT
1. Attended SLAC session / FGD  Attended and  On going
participated SLAC
2. Trainings/Workshops/Seminars Session/FGD
 Attended  Done
3. Staff Meeting Training/Seminar
on June 26, 2019
Ciriaco Hotel,
Calbayog City
 Attended Staff
Conference
(June 21, 2019)
E. NETWORKING/ LINKAGES
PARTNERSHIP

1. Maintaining harmonious relationship  Join forces with  Successfully


and strengthening collaboration with stakeholders for implemented
the parents, community and other continuous
stakeholders. support for the
2. Attended GPTA meeting for 1st programs and
quarter. projects.
F. REPORTS REQUIRED SUBMITTED

1. Submit reports to the immediate head  Submit reports  Accomplished


as a part of weekly/monthly needed to be
requirements (DTR,DLL,MAR) consolidated
ahead of time.
G. PHYSICAL FACILITIES DEVELOPMENT

1. Maintain cleanliness in the classroom  On going  On going


and ground improvement.
H. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
1. Lack of students’ discipline 1. Instilling classroom policies and rules to be
followed by the students.
2. Teacher-student relationship 2. Call the attention of the student with present of
(disrespectful) their parent/ guardian. Apologize to their Adviser
3. Early Pregnancy and promised not to do it again, with a
promissory note.
3. Talked courteously to the student involved and let
her know the consequences of everything.
Prepared by:

VICKY RANCE-CATUBIG, MAED


Teacher
Noted:

JULIE CRISTY E. LOBOS


Filipino-Science Department Head
Republic of the Philippines
Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF JULY 2019

JHS ACADEMIC DEPARTMENT (FIL-SCI)

TARGET ACCOMPLISMENT REMARKS


A. ACCESS

A.1 Learners Development


 On going  On going
1.1. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter

2. Learners Extra Curricular Activities

2.1 Assist students in participating the


Nutrition Month Celebration,  ACR  Done
Acquaintance & Mass Induction of
Officers, Intramurals
B. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

1. Used Instructional Materials in delivery  On going  On going


of the lesson.
2. LCD / DLL  On going  On going
3. Teachers using technology.  On going  On going
4. Teachers teaching.  On going  On going
C. CURRICULUM DEVELOPMENT
1. DLL/DLP weekly submitted with the  Submitted  On going
integration of 4A’s DLL/DLP weekly
2. Curriculum Guide and LCD submitted.  Competencies are  On going
followed according
to the CG / LCD.

D. STAFF DEVELOPMENT
1. Attended SLAC session / FGD  Attended and  Accomplished
participated SLAC
2. Trainings/Workshops/Seminars Session/FGD
(July 9, 2019)
3. Staff Meeting  Attended Staff
Conference
(July 10, 2019 with
Sir Jaime Cabili)
E. NETWORKING/ LINKAGES
PARTNERSHIP

1. Maintaining harmonious relationship  Join forces with  On going


and strengthening collaboration with stakeholders for
the parents, community and other continuous
stakeholders. support for the
2. Attended GPTA meeting for 2nd quarter. programs and
projects.
F. REPORTS REQUIRED SUBMITTED

1. Submit reports to the immediate head  Submit reports  On going


as a part of weekly/monthly needed to be
requirements (DTR,DLL,MAR) consolidated ahead
of time.
G. PHYSICAL FACILITIES DEVELOPMENT

1. Maintain cleanliness in the classroom  On going  On going


and ground improvement.
H. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
1 Lack of students’ discipline (Bullying) a. Instilling classroom policies and
2 Teacher-student relationship rules to be followed by the
(disrespectful) students.
3 Early Pregnancy b. Call the attention of the student
with present of their parent/
guardian. Apologize to their Adviser
and promised not to do it again,
with a promissory note.
c. Talked courteously to the student
involved and let her know the
consequences of everything.

Prepared by:

VICKY RANCE-CATUBIG, MAED


Teacher
Noted:
JULIE CRISTY E. LOBOS
Filipino-Science Department Head

Republic of the Philippines


Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF AUGUST 2019

LANGUAGE DEPARTMENT

TARGET ACCOMPLISMENT REMARKS


B. ACCESS

A.1 Learners Development


 On going  On going
1.2. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter  DONE  DONE

2. Learners Extra Curricular Activities

2.1 Assist students in participating the


BUWAN NG WIKA Celebration,  ACR  Done
MUNICIPAL MEET (PENTA)
I. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

5. Used Instructional Materials in delivery  On going  On going


of the lesson.
6. LCD / DLL  On going  On going
7. Teachers using technology.  On going  On going
8. Teachers teaching.  On going  On going
J. CURRICULUM DEVELOPMENT
3. DLL/DLP weekly submitted with the  Submitted  On going
integration of 4A’s DLL/DLP weekly
4. Curriculum Guide and LCD submitted.  Competencies are  On going
followed according
to the CG / LCD.

K. STAFF DEVELOPMENT

4. Attended SLAC session / FGD  On-going  On-going

5. Trainings/Workshops/Seminars
6. Staff Meeting  Attended Staff  Done
Conference /
Planning
(August 2019
with Sir Jaime
Cabili)
L. NETWORKING/ LINKAGES
PARTNERSHIP

3. Maintaining harmonious relationship  Join forces with  On going


and strengthening collaboration with stakeholders for
the parents, community and other continuous
stakeholders. support for the
programs and
projects.
4. Attended GPTA meeting for 1st quarter.  ACR  Done
(August 23, 2019)
M. REPORTS REQUIRED SUBMITTED

2. Submit reports to the immediate head  Submit reports  On going


as a part of weekly/monthly needed to be
requirements (DTR,DLL,MAR) consolidated ahead
of time.
N. PHYSICAL FACILITIES DEVELOPMENT

2. Maintain cleanliness in the classroom  On going  On going


and ground improvement.
O. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
1 Lack of students’ discipline (Bullying) a) Instilling classroom policies and
2 Teacher-student relationship rules to be followed by the
(disrespectful) students.
3 Early Pregnancy b) Call the attention of the student
4 Family Problem with present of their parent/
5 Peer Influence guardian. Apologize to their Adviser
and promised not to do it again,
with a promissory note.
c) Talked courteously to the student
involved and let her know the
consequences of everything.

Prepared by:

VICKY RANCE-CATUBIG, MAED-LL


Teacher
Noted:
JAIME A. CABILI JR.,PhD.,EdD.
Secondary School Principal

Republic of the Philippines


Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF SEPTEMBER 2019

LANGUAGE DEPARTMENT
TARGET ACCOMPLISMENT REMARKS
C. ACCESS

A.1 Learners Development


 On going  On going
1.3. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter  DONE  DONE

2. Learners Extra Curricular Activities

2.1 Assist students in participating the


SCIENCE Celebration, PROVINCIAL  ACR  Done
ENCAMPMENT
P. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

9. Used Instructional Materials in delivery  On going  On going


of the lesson.
10. LCD / DLL  On going  On going
11. Teachers using technology.  On going  On going
12.Teachers teaching.  On going  On going

Q. CURRICULUM DEVELOPMENT
5. DLL/DLP weekly submitted with the  Submitted  On going
integration of 4A’s DLL/DLP weekly
6. Curriculum Guide and LCD submitted.  Competencies are  On going
followed according
to the CG / LCD.

R. STAFF DEVELOPMENT
7. Attended SLAC session / FGD
 On-going  On-going
8. Trainings/Workshops/Seminars

9. Staff Meeting
 Attended Staff  Done
Conference /
Planning
(September 9,
2019 with Sir
Jaime Cabili) &
September 18,
2019
S. NETWORKING/ LINKAGES
PARTNERSHIP

5. Maintaining harmonious relationship  Join forces with  On going


and strengthening collaboration with stakeholders for
the parents, community and other continuous
stakeholders. support for the
programs and
projects.
6. Attended GPTA meeting for 1st quarter.  ACR  Done
(August 23, 2019)
T. REPORTS REQUIRED SUBMITTED

3. Submit reports to the immediate head  Submit reports  On going


as a part of weekly/monthly needed to be
requirements (DTR,DLL,MAR) consolidated ahead
of time.
U. PHYSICAL FACILITIES DEVELOPMENT

3. Maintain cleanliness in the classroom  On going  On going


and ground improvement.
V. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
6 Lack of students’ discipline (Bullying) d) Instilling classroom policies and
7 Teacher-student relationship rules to be followed by the
(disrespectful) students.
8 Early Pregnancy e) Call the attention of the student
9 Family Problem with present of their parent/
10 Peer Influence guardian. Apologize to their Adviser
and promised not to do it again,
with a promissory note.
f) Talked courteously to the student
involved and let her know the
consequences of everything.
Prepared by:

VICKY RANCE-CATUBIG, MAED-LL


Teacher
Noted:
JAIME A. CABILI JR.,PhD.,EdD.
Secondary School Principal

Republic of the Philippines


Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF OCTOBER 2019

LANGUAGE DEPARTMENT

TARGET ACCOMPLISMENT REMARKS


D. ACCESS

A.1 Learners Development


 DONE  Done
1.4. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter

2. Learners Extra Curricular Activities


2.1 Assist students in participating the
Career Guidance Program with
NSPESO & MSPESO- Oct. 18, 2019 /  ACR  Done
United Nation (UN) -Oct. 30, 2019 &
W. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

13. Used Instructional Materials in delivery  DONE  DONE


of the lesson.
14. LCD / DLL  DONE  SUBMITTED
15. Teachers using technology.  DONE  DONE
16.Teachers teaching.  DONE  DONE
X. CURRICULUM DEVELOPMENT
7. DLL/DLP weekly submitted with the  Submitted  SUBMITTED
integration of 4A’s DLL/DLP weekly
8. Curriculum Guide and LCD submitted.  Competencies are  SUBMITTED
followed according
to the CG / LCD.
Y. STAFF DEVELOPMENT

10.Attended SLAC session / FGD  Attended and  Accomplished


participated SLAC
11.Trainings/Workshops/Seminars Session/FGD

12.Staff Meeting  Attended Staff


Conference
(Oct. 15, 2019 with
Sir Cabili)
Z. NETWORKING/ LINKAGES
PARTNERSHIP

7. Maintaining harmonious relationship  Join forces with  On going


and strengthening collaboration with stakeholders for (Pader)
the parents, community and other continuous
stakeholders. support for the
8. Attended GPTA meeting for every programs and
quarter. projects.
AA. REPORTS REQUIRED
SUBMITTED
 Submit reports  Accomplished
4. Submit reports to the immediate head needed to be
as a part of weekly/monthly consolidated ahead
requirements (DTR,DLL,MAR) of time.
BB. PHYSICAL FACILITIES
DEVELOPMENT
 On going  On going
4. Maintain cleanliness in the classroom
and ground improvement.
CC. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
4 Lack of students’ discipline d. Instilling classroom policies and
5 Teacher-student relationship rules to be followed by the
(disrespectful) students.
6 Early Pregnancy e. Call the attention of the student
with present of their parent/
guardian. Apologize to their Adviser
and promised not to do it again,
with a promissory note.
f. Talked courteously to the student
involved and let her know the
consequences of everything.

Prepared by:

VICKY RANCE-CATUBIG, MAED-LL


Teacher
Noted:
JAIME A. CABILI JR. PhD.,EdD.
School Principal II

Republic of the Philippines


Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF NOVEMBER 2019

LANGUAGE DEPARTMENT

TARGET ACCOMPLISMENT REMARKS


E. ACCESS

A.1 Learners Development


 DONE  Done
1.5. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter

2. Learners Extra Curricular Activities

2.1 Assist students in participating the


School Based Scouting & ENGLISH &  ACR  Done
Reading MONTH CELEBRATION
DD. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

17. Used Instructional Materials in delivery  DONE  DONE


of the lesson.
18. LCD / DLL  DONE  SUBMITTED
19. Teachers using technology.  DONE  DONE
20.Teachers teaching.  DONE  DONE
EE. CURRICULUM DEVELOPMENT
9. DLL/DLP weekly submitted with the  Submitted  SUBMITTED
integration of 4A’s DLL/DLP weekly
10.Curriculum Guide and LCD submitted.  Competencies are  SUBMITTED
followed according
to the CG / LCD.

FF.STAFF DEVELOPMENT

13.Attended SLAC session / FGD  Attended and  Accomplished


participated SLAC
14.Trainings/Workshops/Seminars Session/FGD
 Attended Staff
15.Staff Meeting Conference (Nov. 5,
2019 & Nove. 18,
2019)
GG. NETWORKING/ LINKAGES
PARTNERSHIP

9. Maintaining harmonious relationship  Join forces with  On going


and strengthening collaboration with stakeholders for (Pader)
the parents, community and other continuous
stakeholders. support for the
10. Attended GPTA meeting for 4th quarter. programs and
projects.
HH. REPORTS REQUIRED
SUBMITTED
 Submit reports  Accomplished
5. Submit reports to the immediate head needed to be
as a part of weekly/monthly consolidated ahead
requirements (DTR,DLL,MAR) of time.
II. PHYSICAL FACILITIES DEVELOPMENT

5. Maintain cleanliness in the classroom  On going  On going


and ground improvement.
JJ.PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
7 Lack of students’ discipline g. Instilling classroom policies and
8 Teacher-student relationship rules to be followed by the
(disrespectful) students.
9 Early Pregnancy h. Call the attention of the student
with present of their parent/
guardian. Apologize to their Adviser
and promised not to do it again,
with a promissory note.
i. Talked courteously to the student
involved and let her know the
consequences of everything.

Prepared by:

VICKY RANCE-CATUBIG, MAED-LL


Teacher
Noted:
JAIME A. CABILI JR. PhD.,EdD.
School Principal II

Republic of the Philippines


Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF DECEMBER 2019

LANGUAGE DEPARTMENT

TARGET ACCOMPLISMENT REMARKS


F. ACCESS

A.1 Learners Development


 On going On going
1.6. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter  Done Done

2. Learners Extra Curricular Activities

2.1 Assist students in participating the


activity
KK. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

21. Used Instructional Materials in delivery  DONE  DONE


of the lesson.
22. LCD / DLL  DONE  SUBMITTED
23. Teachers using technology.  DONE  DONE
24.Teachers teaching.  DONE  DONE
LL.CURRICULUM DEVELOPMENT
11. DLL/DLP weekly submitted with the  Submitted  SUBMITTED
integration of 4A’s DLL/DLP weekly
12.Curriculum Guide and LCD submitted.  Competencies are  SUBMITTED
followed according
to the CG / LCD.

MM. STAFF DEVELOPMENT

16. Attended SLAC session / FGD  Attended and  Accomplished


participated SLAC
17. Trainings/Workshops/Seminars Session/FGD
18. Staff Meeting  Attended Staff
Conference
 Attended seminar in
Basic Laws at
Calbayog Dec. 4-6,
2019
 Conducted Seminar
in CGP at La
Fortunata, Daganas
Catarman
NN. NETWORKING/ LINKAGES
PARTNERSHIP

11. Maintaining harmonious relationship  Join forces with  Successfully


and strengthening collaboration with stakeholders for implemented
the parents, community and other continuous (raffle ticket
stakeholders. support for the bonanza)
12. Attended GPTA meeting for 4th quarter. programs and
projects.
OO. REPORTS REQUIRED
SUBMITTED
 Submit reports  Accomplished
6. Submit reports to the immediate head needed to be
as a part of weekly/monthly consolidated ahead
requirements (DTR,DLL,MAR) of time.
PP.PHYSICAL FACILITIES DEVELOPMENT

6. Maintain cleanliness in the classroom  On going  On going


and ground improvement.
QQ. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
10 Lack of students’ discipline j. Instilling classroom policies and rules
11 Teacher-student relationship (disrespectful) to be followed by the students.
12 BULLYING k. Call the attention of the student with
present of their parent/ guardian.
Apologize to their Adviser and
promised not to do it again, with a
promissory note.
l. Talked courteously to the student
involved and let her know the
consequences of everything.

Prepared by:

VICKY RANCE-CATUBIG, MAED-LL


Teacher
Noted:
JAIME A. CABILI JR. PhD.,EdD.
School Principal II
Republic of the Philippines
Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF JANUARY 2020

LANGUAGE DEPARTMENT

TARGET ACCOMPLISMENT REMARKS


G. ACCESS

A.1 Learners Development


 DONE  Done
1.7. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter

2. Learners Extra Curricular Activities


2.1 Assist students in participating the
activity.

RR. INSTRUCTIONAL / RESEARCH


DEVELOPMENT
25. Used Instructional Materials in delivery  DONE  DONE
of the lesson.
26. LCD / DLL  DONE  SUBMITTED
27. Teachers using technology.  DONE  DONE
28.Teachers teaching.  DONE  DONE
SS. CURRICULUM DEVELOPMENT
13. DLL/DLP weekly submitted with the  Submitted DLL/DLP  SUBMITTED
integration of 4A’s weekly
14. Curriculum Guide and LCD submitted.  Competencies are  SUBMITTED
followed according
to the CG / LCD.

TT.STAFF DEVELOPMENT

19. Attended SLAC session / FGD  Attended and  Accomplished


participated SLAC
20. Trainings/Workshops/Seminars Session/FGD
 Attended Staff
21. Staff Meeting Conference (Jan.
27, 2020)
UU. NETWORKING/ LINKAGES
PARTNERSHIP
13. Maintaining harmonious relationship
and strengthening collaboration with  Join forces with  Successfully
the parents, community and other stakeholders for implemented
stakeholders. continuous (raffle ticket
14. Attended GPTA meeting for every support for the bonanza)
quarter. programs and
projects.
VV. REPORTS REQUIRED
SUBMITTED
 Submit reports  Accomplished
7. Submit reports to the immediate head needed to be
as a part of weekly/monthly consolidated ahead
requirements (DTR,DLL,MAR) of time.
WW. PHYSICAL FACILITIES
DEVELOPMENT
 On going  On going
7. Maintain cleanliness in the classroom
and ground improvement.
XX. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
13 Lack of students’ discipline m. Instilling classroom policies and rules
14 Teacher-student relationship (disrespectful) to be followed by the students.
15 Early Pregnancy n. Call the attention of the student with
present of their parent/ guardian.
Apologize to their Adviser and
promised not to do it again, with a
promissory note.
o. Talked courteously to the student
involved and let her know the
consequences of everything.
Prepared by:

VICKY RANCE-CATUBIG, MAED-LL


Teacher

Noted:
JAIME A. CABILI JR. PhD.,EdD.
School Principal II

Republic of the Philippines


Department of Education
Regional Office No. VIII
Division of Northern Samar
Mondragon II District
FRANCISCA DOMINICE NATIONAL HIGH SCHOOL
Bugko, Mondragon, Northern Samar

MONTHLY ACCOMPLISHMENT REPORT


FOR THE MONTH OF FEBRUARY 2020

LANGUAGE DEPARTMENT

TARGET ACCOMPLISMENT REMARKS


H. ACCESS

A.1 Learners Development


 DONE  Done
1.8. Classroom Instruction
Conducts classes religiously
following the plan prepared for the
lesson.
1.2 Pre-Test Quarter

2. Learners Extra Curricular Activities


2.1 Assist students in participating the
PROVINCIAL MEET / CAREER
GUIDANCE ORIENTATION GRADE 12  ACR  Done
& ANI NG SINING – Arts Festival
YY. INSTRUCTIONAL / RESEARCH
DEVELOPMENT

29. Used Instructional Materials in delivery  DONE  DONE


of the lesson.
30. LCD / DLL  DONE  SUBMITTED
31. Teachers using technology.  DONE  DONE
32.Teachers teaching.  DONE  DONE
ZZ.CURRICULUM DEVELOPMENT
15. DLL/DLP weekly submitted with the  Submitted  SUBMITTED
integration of 4A’s DLL/DLP weekly
16.Curriculum Guide and LCD submitted.  Competencies are  SUBMITTED
followed according
to the CG / LCD.

AAA. STAFF DEVELOPMENT

22.Attended SLAC session / FGD  Attended and  Accomplished


participated SLAC
23.Trainings/Workshops/Seminars Session/FGD –
Grades 7-9, 2020
24.Staff Meeting  Attended Staff
Conference
BBB. NETWORKING/ LINKAGES
PARTNERSHIP

15. Maintaining harmonious relationship  Join forces with  On going


and strengthening collaboration with stakeholders for
the parents, community and other continuous
stakeholders. support for the
16. Attended GPTA meeting for 3rd quarter. programs and
projects.
 Conducted Early
Registration –
February 1, 2020
CCC. REPORTS REQUIRED
SUBMITTED
 Submit reports  Accomplished
8. Submit reports to the immediate head needed to be
as a part of weekly/monthly consolidated ahead
requirements (DTR,DLL,MAR) of time.
DDD. PHYSICAL FACILITIES
DEVELOPMENT
 On going  On going
8. Maintain cleanliness in the classroom
and ground improvement.
EEE. PROBLEMS ENCOUNTERED RECOMMENDATION / ACTIONS TAKEN /
POSSIBLE SOLUTIONS INITIATED
16 Lack of students’ discipline p. Instilling classroom policies and
17 Teacher-student relationship rules to be followed by the
(disrespectful) students.
18 Early Pregnancy q. Call the attention of the student
19 Bullying with present of their parent/
guardian. Apologize to their Adviser
and promised not to do it again,
with a promissory note.
r. Talked courteously to the student
involved and let her know the
consequences of everything.

Prepared by:

VICKY RANCE-CATUBIG, MAED-LL


Teacher
Noted:
JAIME A. CABILI JR. PhD.,EdD.
School Principal II

You might also like