33% found this document useful (3 votes)
3K views3 pages

TGR TGW Sheet

This document is a TGR/TGW sheet containing project details for a customer including the model, part name, part number, project start and termination dates. It lists the project phases and details for TGR (total gross requirement) and TGW (total gross weight) for each phase, and includes spaces for those who prepared and approved the document.

Uploaded by

sumit_saraf_5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
33% found this document useful (3 votes)
3K views3 pages

TGR TGW Sheet

This document is a TGR/TGW sheet containing project details for a customer including the model, part name, part number, project start and termination dates. It lists the project phases and details for TGR (total gross requirement) and TGW (total gross weight) for each phase, and includes spaces for those who prepared and approved the document.

Uploaded by

sumit_saraf_5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • TGR/TGW Sheet: A technical form used to document project phases and specifications, likely for tracking and workflow management in a technical or engineering context.
  • Learning and PDCA: Contains minimal content indicating learning objectives and reference to 'PDCA'—possibly a Placeholder for future content or outlines related to process improvement cycles like Plan-Do-Check-Act.

TGR/TGW SHEET

CUSTOMER MODEL PART NAME PART No. Project Start Date


IPC Termination Date:

Sr. No. TGR Sr. No.


PHASE-1

PHASE-2 (Not Applicable)


PHASE-3

PHASE-4

PHASE-5

Prepared By: Approved By:


oject Start Date Rev. 0
C Termination Date: Date:
TGW
LEARNING

1.4.2 PDCA

TGR/TGW SHEET
CUSTOMER
MODEL
PART NAME
PART No.
Project Start Date
IPC Termination Date:
Sr. No.
TGR
Sr. No.
PHASE-1
PHASE-2
oject Start Date
Rev.
0
C Termination Date:
Date:
TGW
LEARNING
1.4.2
PDCA

You might also like