Professional Documents
Culture Documents
TARIFF
ON
GOODS AND VESSELS ETC.
TARIFF
ON
GQQDS AND VESSELS ETC.
Price n. 100.00
~br Ci)tttagong ~ort QIutl)oritl'
INTRooucnON
~~
M FAROoaUE
COMMODORE BN
~
CHmAGONG PORT AVTHORITY
CHITTAGONG.
\--_ _ T....ilf on Goods and Vessels etc.
CONTENTS
TARIFF SECTION·l
OUES AND CHARGES TO THE ACCOUNT OF THE OWNER OR THE AGENT OR THE
CHARTERER OF THE VESSEl.
TARIFF SECTION- II
TARIFF SECTION· IV
CONTAINERS
Charges to the Account of the Agent or Owner or Charterer of the Vessel
(Except where othelWise indicated)
Charges levied under the authority of the Chittagong
Port Authority Ordinance - 1976
4.1 Loading or Discharging containers 51-52
4.2 Shaktiman (Container) 53-54
4.3 Storage Charges, Containers and Non CPA Equipment's 55-58
4.4 Extra Container Movement 58-58
4.5 Reefer Container Service 59-59
4.6 Change of Status 59-59
TARIFF SECTION· V
CONTAINERS
Charges 10 the Account 01 the Shipper! Consignee! Shipping Agent
Charges levied under the authority 01 the Ch illagong
Port Authority Ordinance - 1976
5.1 Rive Dues (Containerised) 63-63
5.2 Stuffing! Un stuffing 64-64
5.3 Hoisting Charges (Containerised) 64-65
5.4 Road weigh Bridge 65-65
5.5 Lilt on ! Lilt off Charges 65-65
TARIFF SECTION·VI
Charges levied ..-der Ine ="Di'! d 1",
POiJSAcl1:t{E ~- :j' ~
--
c -'.. -.-....
I. C. 0 Tarili
TARIFF SECTION- I
DUES AND CHARGES TO THE ACCOUNT OF THE
OWNER OR THE AGENT OA THE CHARTERER
OF THE VESSELS.
Tariff
Item
No.
1.1 PORT DUES
(Authority- Notification No. SHOo417-U86/PEl4R-J8/82 Dated 27.10.86
Published in the Bangladesh Gazette Extra Ordinary on 27-10 -86, SRO
~1r8- ~ /~o 'i1g51g~-",,~~odaled 25-07-90 Published in the Bangladesh
Gazette Additional 01/ 25-07-90 alld SRO -<:~ ~Aoo"" ~- -<:~ (11 ElwjmHt/
~oo",,/~Ib ~ ~ )8 o~, <ff~~ ~ ~(\;fii'6 "'(~ /)
9
Ta riff on Goods and Vessels etc.
Note C : For calculating the dues payable by a vessel the weight of the deck cargo (in
mellie 1017) sl!a)) li&,J{)(jerJ to ItS GRT (Gmss Regislered Tonnage/.
Note D : Paymenl of port dues shall be received in Bangladesh currency cabJlated at the
official rate of exchane (selling) on the date of arrivat of the vessel at the Chittagong
Port and i the arrival date 01 the vessel coincides wnh any holiday and for that reason
official rale of exchange is not available, the rate of exchange onthe succeedingdate
shall be taken into consideration for assessment of port dues.
Traiff
Item
No.
1.2 PILOTAGE
(Authority : Notification No. SAO 416·U186/PEl4A-18/82 dated 27-1 0-1986
published in the Bangladesh Gazette-Extra ordinary on 27-10-1986). Pilotage
fees, shifting fees and night navigation fees shall be charged within the Chittagong
Port at 1he following rates :-
1.2.1 Pilotage fee : At the rate of USS 35.75 Per 1000 GAT or part thereof, subject to
a minimum of US$ 357.50 for inward or outward pilotage or for a movement in a
dry dock.
An additional fee of 50 percent of the pilotage fees specified above shall be
charged in respect of vessels breaking journey at Gupta Khal in order to take
delivery of bunkers at the Tanker moorings.
1.2.2 Night Navigation fees : In addition to the pilotage fees night naVigation fees at
the tollowing rates shall be charged on vessels if pilotage work takes place wholly
or in part between 6 p. m and 6 a. m.
(a) for vesse ls up to 5,000 GAT US$ 1B.50
(b) for vessels over 5,000 GAT US$ 34.00
but not exceeding 10,000 GAT
(c) for vessels over 10,000 GAT USS 43.00
1.2.3 Shifting fees : For shifting vessels from one berth to another or swinging her
US$ 29.BO
But when the shifting takes place in whole or in part beh-yeen 6 p. m. and 6 a. m.
the shifting fee shall be US$ 59.60.
Note A: Where two GRT (Gross Registered Tonnage) are ass igned to a vessel in
assooation with a tonnage mark on the vessel's side the higher figure shall be
applicable in determining GRT for the purpose of assessment of pilotage fees.
11
_ - - - - Tariff on Gooch and Vessels etc. The ChittagongPprtAuthop
Note B : Payment of the fees shalJ be received in Bangladesh currency calculated at the
official rate of exchange (selling) on the date of arrival of the vessel at the
Chiltagong port and if the arrival date of the vessel coincides with any holiday
and far that reason official rate of exchange is not available, the rate of exchange
on the succeeding date shall be laken into consideration for assessment of the
fees.
Note C : For calculating the fees payable by a vessel , the weight of the deck cargo (in
metric ton) shall be added to the vesel's GRT.
Note 0 : Entry or exit from a dry dock will be counted as separate movement and movement
within a dry dock will be counted as a separate movement.
Tariff
Item
No.
1.3 Il&S
(Alirhority-NotijiclllionNo. CF &AO I V( 158YJ 197 dtlted4.9.1986 Publi.~hed
il/ the Bangilldesh Gazette Part VIJI on /8-9-1986. Notificatioll No. CF&AO-
IV( 158YLoose-71273 dnted-04/IO/2007 published in the BfVlgladesh Gazette
(E..r/m OnlitUlry) OIl 24-10-2007 & Norijic(I/iofi CF&AO-IV( 158)1Loose-61
487 dated 14-05-2008 published ill the Bangladesh Cllzette (Extra OrdilWry)
01111-06-2008.)
Tariff
Item Description of Charges Rates
No.
1.3.1 Tug charges of pilotage movement PerT"g, per
for Sea-going vessels: Movement:
12
Witt on Goods and Vessels etc. The Chittagollg EortAu t hority
Note (A) (i) Tug assistance is mandatory for Sea-going vessel during inward and
outward Pilotage movement. If any Pilotage movement requires assistance
01 more than one Tug Tariff Item No. 1.3.2 shall be charged lor every
additional tug used.
(ii) Ta rn! Item No. 1.3.2 shall be charged double il tug assistance is required
for towage or assisting disabled/dead vessel.
(iii) Cancellation of a request for tug service less than two hours before it is
due to start, will be charged at half the rate given in 1.3.1 or at the rale for
one hour's hire in 1.3.2 as is appropriate.
(iv) Hours for the purpose of Tariff Item 1.3.2 will be calcu lated from the time a
tug is ready to work until the lime it finishes the work or remains in standby
position for the work.
(v) A minimum alone Tug be charged lor shifting, il this takes place whether
used or not The rate lor shifting will be hall of 1hat shown.
(vi) Hours for the purpose of Tariflltem No. 1.3.3 will be calculated from the
time a Tug leaves its base to the time it arrives back at the base.
(vii) Charges lor hire 01 Dumb Barge or LASH Barge shall be realized on the
. basis 01 Tariff Item No. 1.3.2.
(8): Where two gross Tonnages are assigned to certain vessels in association with a
tonnage mark on the vessels' side the higher figure shall be applicable in
determining GRT for the purpose of this tariff.
(C): Gross Registered Tonnage (GRT), lor the purpose of this tariff shall include the
weight in 000 kg . of the deck cargo.
(0): A Sea-going vessel is defined for the purpose of this tariff as a vessel of gross
reg istered tonnage (GRT) of 200 or more.
(E) : Movement is defined for the purpose of this tariff as a move between any two
points within the Chiltagong Port limits or at CPA Pilot Station even if the two
Points are at the same set of wharves. Entry or exit from a dry dock will be counted
as a separate movement. Movement within a dry dock will be counted as a separate
movement.
(F): In addition to the usual charges the party requisitioning the use 01 the Tug shall be .
liable to pay reasonable compensation for any damages caused to the Tug in
rendering the assistance required. Such compensation shall be determined by
the Chairman I CPA.
(G): The Charges for the services of eve ry additional Tug, if used, shall be recovered.
The use olTug will be entirely at the discre1ion 01 the Deputy Conservator.
(H): The Charges lor the use 01 dredger as Tug will be the same as are in lorce lortlle
use 01 the Tug.
13
Tariff on Goods and Vessels etc. The Chittagong Po!"tAut hority
Tariff
Item
No.
1.4 BERTHING OR UNBERTHING
(Awhority - Notification No. CF & AO IV (/ 58) /1/97 dated 4.9. 1986
Published in the Bangladesh Gazerte Part VllI 011 /8.9.1986).
Notes: (i) Occasion means for the purpose of this tariff item movement to or from berth
or mooring.
(ii) This service may be carried out by launch or hawser boat or heave up boat
or mooring boat.
(iii) Berthing or unberthing tariff is compulsory for Sea-going vessels over 2000
GRT.
(iv) Tariff item 1.4.1 shall be charged at half 01the rate for shifting.
Tariff
Item
No.
1.5 BERTH OCCUPANCY
(Authority - Notificarion No. CF & AO -IV (/58) / Jl97 dated 4.9. 1986
Pllbli.\·hed in the Bangladesh GazetTe ParI VllI O il 18.9.1986).
Notes : (A) (i) Vessels which do not vacate the berth after receiving written notice 10
do sc from the CPA Jetty AUlhorities shall be charged up to ten limes
the appropriate in tariff item 1.5 for the period after receiving the written
notice.
(ii) This service includes the mooring gangs necessary for the berthing
and unberthing operations.
14
Tariff on Goods and Vessels etc. _ _ The Chittagong PortAufhority
(iii) This tariff shall be charged on Sea·going vessels which will be engaged
in foreign trade or lighterage of foreign cargo to I from the outer
anchorage or from outside the Chittagong Port limits. Other vessels at
the CPA whart shall be charged terminal Charge on nver Traffic.
(8) Where two gross tonnages are assigned to certain vessels in association
wilh a tonnage markon the vessels' side the higher figure shall be applicable
in determining GRT for the purpose of this tariff.
(C) Gross Registered Tonnage (GRT) lor the purpose of this tanff shall include
the weight in OooKg. of the deck cargo.
(D) A Sea·going vessel is defined for the purpose of this tariff as a vesset of
gross registered tonnage (GRT) of 200 or more.
Tarifl
Item
No.
1.6 MOORING OCCUPANCY
(AlIIhority . - NOlificllfio n No. CF & AO-IV (158) / 1197 dated 4.9.1986
Published in the Bangladesh Gazette Part V1JJ 0 11 18.9.1986).
15
Tariff on Good!. and Vessels etc. The Chittagong Port Authority
Tariff
Item
No.
1.7 WATER SUPPLY CHARGES
(Authority - Notification No. CF & AO· IV (/58) I 1197 dated 4.9.1986
Published illihe Bangladesh Gazette Part VIII on 18.9.1986 & Norijicfllion
No. CF&AO- IV(l 58)/Loose-71273 dared 04-10-2007 published ill /he
Bangladesh Gazette (Extra Ordinary) 011 24-10-2(07).
Description of Charges Per 1000 Litres or
part Ihereof
1.7.1 Waler Supp~ 10 a vessel by means
of the main supply line US $1.50
1.7.2 Water supply to a vessel by means
of CPA waler Boal or Barge us $ 6.40
1.7.3 Through lValer Tap 10 privale parties Rale of WASA
and other agencies (shore establishment) Plus 15% over
head charges.
Nole : (i) Cancellalion of lanff ilem 1.7.1 less Ihan ~vo hours before il is due 10 begin
shall be charged allhe rale of 5,000 lilres of waler.
(ii) Cancellation of tariff item 1.7.2 less than 24 hours before it is due to begin
shall be charged allhe rale of 50,000 lilres 01 waler.
(iii) Delay in commencing lanff item 1.7.1 if more Ihan half an hour after the CPA
equipment is ready shall be charged at Ihe rale lor 2,500 litres of waler, for
each hour or part Ihereol of delay excluding Ihe firsl hall hour of delay which
will 001 be charged.
(iv) Delay in commencing tariff item 1.7.2 if more than half an hour after the water
boat is ready shall be charged al the rate for 25,000 litres of water, for each
hour or part thereol, 01 delay excluding the first half hour of delay which will not
be charged.
(v) The charge under tariff item 1.7.2 will be exclusive of the over-time allowance
01 the crew members for which actual bill will be prepared on the parties for
payment.
16
- iff on Goods cmd Vessels etc. _ _ The Chittago~ eortA hority
Tariff
Item No.
1.8 JEll CRANE CHARGES
(Authority - Notification No. CF & AD - IV (158) /1197 dared 4. 9. 1986
Published ill the B(UJgladesh Gazette Parr VIll 011 18.9.1986 & NOlijicarioll
No. CF&AO-IV(J58)/Loose-71273 dated 04·10-2007 published ill ril e
Bangladesh Gazette (Extra Ordinary) 01124· 10·2007).
Description of Charges Per Crane, per period of
8 hrs, or part thereof
1.8.1 Use 01Jetty Crane US $ 42.00
1.8.2 II Jetty Crane not used US S 20.10
Note : (A) (i) The total number of cranes shall be either the number of cranes
available or the number of hooks in use which ever is the lower.
(ii) If an order for a crane is cancelled less than 6 hours before the time
due to start work the first period of 8 hours will be charged at the
higher tariff item 1.8.1 rate rather than the 1.8.2 rate which othen. . ise
would be applicable.
(iii) Tarrilltem No. 1.8.2 shall only be charged while bagged cargo carrying
vessel uses her own derrick.
(B) Applications lor cranes and or derr~ks lor the lollowing night and day should
be made in writing belore 12 noon to the OTM. (Operation) I CPA. In case the
office is closed the application will be given to the inspector on duty in the
shed.
(C) The Master, Owner, or Agent \~II supp~ their own slings and the Jetty authornes
shall accept no liability for the same.
(D) Application lor cranes should be mada on prescribed lorms, with counterroil
and be signed by the Agents , Master or the Owners of the vessel showing the
number of cranes and or derricks required from what time and for how long.
(E) The cranes and or derricks application lor Friday and Holiday must be made
on the previous working day before 12 noon. Subsequent cancellation, additions
and alterations can be applied for to the inspector on duty. The DTM / CPA
reserves the right to refuse any cancellation or additional work applied for by
a vesset if such demand is not in the best interest of the Port.
e The jetty authorities may at their discretion ask a vessel to work on Holidays
and vessels failing to comply with the same may not be allowed to remain on
a Jetty Berth.
17
_~~_Ta ri ff on Goods and Ves::.els etc. The Chittagong"'port Au hor"
Tariff
Item
No.
1.9 CHARGES FOR SALT SHIPS WORKING AT SALT BERTH
(Authority - Noeification Nos. CF & AO - IV (149) / 19249 dated 9.4.80
Published 0/1 24.4.80 CF & AO - IV (149) / PI. 11 /14218 dOled 13.5.82
published on 20.5.0S2 mId CF & AO - IV (ISS) /1/97 dated 4.9.1986).
Sail ship bMhed al Sail Jelly labour being provied by Ihe Custom Authorities who
supervise the operation. Removal, Wharfrent, Derrick & special worl<.ing charges
are nollevied, if the salt is handled by the Customs &stored in Custom godown or
delivered direct only 50% of the landing charge will be recovered.
Tariff
Item
No.
1.10 PASSENGER TOLL :
(Authority - NotijicaJion No. CF & AO -IV (149) / 16249 dated 4.9. 1980
Published on 24.4.80 CF & AO - IV (149) / PI. 11!1421S ,lilted 13.5.S2
published all 20.5.82 mId No. CF & AO- IV ( 158Y 1197 dated 4.9.1986
published on 18.9.1986).
A Charge of US$ 0.30 per passenger including pilgrims and Armed Forces will be
charged from Steamer Agent or owner of the vessel. Payment for the charges at
tariff item No. 1.3. to 1.10 above shall be received in Bangladesh Taka. The exchange
rate US SlTaka to be used will be that operated by CPAon the day of vessel's entry.
If on that day CPA does not operate an exchange rate, the rate used be that of the
next WOrking day.
18
-. -17 on Gooch dnd Ve)!>els etc.
Tariff
Item
No.
1.11 QUAY GANTRY CRANE CHARGES FOR CONTAINER HANDLING:
(Authority-No[ificatum No. CF & AO- 8IGamry-Tariff (2005 )/1 146/275
dated 04- 10-2007 published in the Bangladesh Gazette (Extra Ordinary)
0 " 24-10-2007. Charges 10 vesseLs accou1If i.e the acCOIl1!l of agent or
owner or charterer of the vessel:
Notes :
(I) This Tanff shall be applicable on all vessels laking berth al CCT or olher jenies where
Quay Gantry Crane is installed.
(ii) This Tariff only covers the operation of Container Handling from vessel to hook point
or coasler or barge and vice versa.
(iii) In case of delivery of Import container to barge or coaster via jetty or receiving from
barge or coaster for subsequent shipment, SOOk of this tariff shall be charged sepa-
ralely 10 lIle Shipping Line or C&F Agenl or requesling party (as Ihe case may be).
'(IV) Paymenl shall be received in Bangladesh Currency calculaled allhe official rale of
exchange (Selling) by SONALI BANK on the date of arrival of Ihe vessel at Ihe Chillagong
Port. If the arrivaf dale of Ihe vessel coincides wilh holiday, the rate of exchange on the
succeeding date shall be taken into consideration.
(V) For open lop, flal or side open conlainer the charges shall be double of Ihe rates
shown.
(VI) Tariff ~e m No. 4.1 shall be charged separalely.
19
TARIFF SECTION· II
CHARGES TO THE ACCOUNT OF
THE SHIPPER OR CONSIGNEE
(CONVENTIONAL CARGO).
L...\ilMon Goods and Vessels etc. The Chittagon Port.Aurhority
TARIFF SECTION · II
CHARGES TO THE ACCOUNT OF THE SHIPPER OR
CONSIGNEE (CONVENTIONAL CARGO).
Tariff
Item
No.
2.1 RIVER DUES (CONVENTIONAL)
(Authority - Notijic{/fiol! No. CF & AD - IV ( 158)12376 dated 18.11./986
Published ill the Bangladesh Cazeue Part-VIII on 27.11./986).
Particulars of goods I Basis of Charges I Rates
2.1.1 Import Cargo Per 1000 Kg. or Tk.34.10
Part thereof
2.1.2 Export Cargo - do - Tk. 15.30
2. 1.3 Domeslic Ca rgo . do · Tk. 10.00
Noles: (i) Cargo delivered to the consignee or received from the shipper within the
Chittagong Pori limits shall be charged river dues, irrespective of whether it is
landed or shipped at the CPA wharves.
Oil River dues will be charged on the first movement only. If cargo is subsequently
shipped or delivered by river, road or rail, it will not be charged river dues.
(iii) Despatch of cargo after refin ing or manufacture in Bangladesh will be counted
as a first movement, irrespective of whether the raw melerials have been
charged river dues.
(iv) Despatch of cargo after storage in Bangladesh will be counted as a second
movement.
(v) Cargo manifesled 10 Mongla port handled at Ihe ouler anchorage will nol be
charged this tariff nem.
23
Tariff on Goods and Vessels etc. The Chittago, O[tAuthOrity
Tariff
Item •
No.
2.2 LANDING OR SHIPPING CHARGES (CONVENTIONAL)
(Aullwrity - Notification No. CF & AO - IV (/58) / Loose 178 dated 5.6.90
pllbli5hed in Bangladesh Gazette Part VI Oil 6.9.1990).
The following landing I Shipping charges shall be levied on goods discharged I
loaded on jetty side, any berth, wharf, pontoon, dock, pier or moorings within the
port limits unless by special agreement otherwise spe,cified for the purpose:
Particualrs of Charges Basis of Rate of
Charges Charges
2.2.1. Import Cargo
(a) Bagged Cargo Per 1000 kg. Tk.46.00
Wheat & Rice or part thereof
(b) Otner bagged cargo - Do- Tk.36.00
including cement, fertilizer salt,
sugar, rape seeds, sorgham etc.
(c) Cement Clinker, dolomite - 00- Tk.60.00
lime stone, iron and steel
uplO 1000 kg. per bundle,
scraps, ingots upto 3000 kg.
per bundle, coal, coke, fire brick.
(d) Wheeled or tracked, - 00- Tk. 175.00
equipment, not in cases
(e) All other imports not - 00- Tk.96.00
exceeding 3000 kg.
(0 All other imports - 00- Tk. 180.00
exceeding 3000 kg. bul
not exceeding 20,000 kg.
(g) All other import exceeding 20,000 kg. - 00- Tk.250.00
(h) Landing charges on the dismantled materials when dismantling work of a
Scrap vessel is done within the Port limit:
(i) @ Tk. 6.63 per GRT or part thereof of the vessel provided no port labour
is required for handling operation
(ii) @ Tk. 16.56 per GRT or part thereof of the vessel in case port labour is
required lor handling operation,
24
Tariff on Goods and Vessels etc..
Tariff
lIem
No.
Particualrs 01 Charges Basis of Rale 01
Charges Charges
2.2.2 Export Cargo
(a) Jute, Mestha, Gunnies and Per 1000 kg. Tk.36.00
Jute and Jute products. or part thereof
(b) Tea in chest. - do- Tk. SO.OO
(c) Shu1 oul cargo (Broughl to
the jelly berth for loading - do - tk.4O.00
on to a vesel, shut out by
thai vessel and delivered
10 shipper)
(d) Bunker, Loca l vessel. NIL
Ie) Bunker, foreign vessel NIL
(f) All olher export nol
exceeding 3000 kg. - do - Tk.39.00
(g) All other export, - do- Tk.1 80.00
exceeding 3000 kg. bul
nol exceeding 20,000 kg.
(h) All other exports exceeding
20,000 kg. , do - Tk.250.00
Note: (i) The above tariff will cover movement between vessel hook and either transit
shed or shipper I consignees transport.
(ii) Charges for any mechanical equipment considered by the CPA to be
necessary for this work, such as forklift or mobile crane, are included in this
tariff item. For cargo requiring the Roating crane, the tariff item 3.2 shall be
charged in addition to the landing or shipping charges.
On} Vehicles etc, discharged or loaded under their own power Irom or to a RoRo
Vessel irrespective of whether CPA labour is used shall be charged at one
quarter of the rale given aI2.2.1 (d).
(iv) Vehichles requiring CPA towing assistance for RoRo discharge or loading
shall be charged at the full rale given aI2.2.1 (d).
(v) Containerised cargo and contamers will not be charged this tariff item instead,
see section IV & v.
25
Tariff on Goods and Vessels etc. The Chfttagong Port Authority
(vi) This tariff item will not be charged in respect of cargo loaded or unklaD3a
from or to vessels at CPA river mooring or at specialised berths not opera:-ec
by the CPA.
(vii) This tariff ilem will not be payable in respect of cargo handling operations z:
outer anchorage.
(viii) Cargo declared for transhipment or reshipment but actually delivered localry
shall be charged al fifty percent more than the rales shown aI 2.2.1 impon
cargo.
(ix) Cargo handled olJerside from or into lighters and nol passing over the CPA
wharves and not handled by CPA labour will not pay tanding or shipping
charges.
(x) There is no additional charge for second or third shift Gazetted Public Holiday
or Friday Work.
(xi) Cargo handled on pallets shall be charged according to the total \'Ieight of
pallet and bags etc, thereon.
(xii) An additional charge ofTk. 1.00 per 100 kg. or part thereof shall be made in
respect of export cargo, when shipped on a vessel other than the vessel for
which the cargo was originally declared.
(xiii) Sweeping whether collected on board on the whari or in the Shed will be
regarded as cargo and tariff item 2.2 shall be charged accordingly.
(xiv) Dangerous cargo shall be charged at the rate in 22.1 (e) or 2.2.2 (fj, lor import
or export cargo respectively il less than 3,000 kg. and at the rates in 2.2.1 (fj, (g)
or 2.2.2 (g), (h) IT the cargo ~ in the weight ranges shown thereat.
Tariff
lIem
No.
2.3 HOISIING CHARGE (conventional) ;
(Aulhority- Notification No. CF&AO-/ V (158)//944 dated /9./0. /986
Published 011 30.10.86.)
Basis of Rate 01
Charges Charges
2.3.1 Hoisting charges Per 1000 kg, 100 percent of the
(Conventional) or part thereof landing or shipplng
charge shown at
item 2.2 for the
cargo concerned
26
M - 00 Goods and Vessels etC:...._ __ The Chittago f"\g ~ortAuthority
Note : (I) HOisling Charges (Convenlional) shall be charged in respecl 01cargo which wi ll
be received or delivered with the assistance of CPA mechanical equipment.
{iii Hoisling Charges (Convenlional) shall be charged al hall rale in respect 01 cargo
over 3000 kg. which will be received or delivered without the assistance of CPA
mechanical equipment.
(iii) Hoisting Charges (Conventional) will not be charged in respect of cargo which
will be broken up by the consignees labour for loading into Railway Wagons.
Tariff
lIem No.
2.4 CHARGES EOR WEIGHMENT :
(AuThority. Notification No. CF & AO - IV ( / 58) / Loose / 78 dated 5.6.90
publish ed ill rhe Bangladesh Gazette Part V/Oll 6. 9.90)
Charge equal to landing or shipping charges shall be levied for assessing Jetty
Charges if the weight is not shown in the Invoice of Agents delivery order for
weighment of the cargo; but if the same is weighed on a Wagon Weigh Bridge or
Road Way Bridge Ihe charges will be as lollows :
Tariff
Item No.
WEIGHBRIDGE CHARGE :
27
Tariff on Goods and Ves~ets etc.
e-
' .,
Notes : (i) Tariff item 2.5.1 shall be charged in respect of cargo which will be discharged
and subsequently loaded at the same CPA wharf.
(ii) Tariff item 2.5.2 shall be charged in respect of cargo whichwill be discharged
at one of the CPA wharves and will subsequently be loaded at another CPA
Wharl.
(iii) If tariff item 2.5.2 is charged, the CPA will be responsible for removal of the
cargo between wharves.
liv) If tariff item 2.5 is charged, the landing or Shipping Charge tariff , em 2.2 will
not be charged.
Tariff
Item
No.
2.6 RENT (WHARf RENT)
(Authority as against tarifJitem No. 2.3 above & NOlificllIioli No. CF&A 0-
{V( J5SYLoose-6I488 dat ed- 14/05/2008 published iI/the Bangladesh Gazelle
(exIra Ordillary) 01111-06 .2(08)
28
=00 Goods and Vessels etc. _ _ _ _The Chittagong Po[tAuthority
Notes :
Cargo 1~1!!1 Slart of Siorage lime End of SIQr.g~ lim~ Free time
See nole 1111)
(i) Import Cargo Common Oay on which 4 days
(Convenlional) landing loaded onlo
date Consignees transport
for delivery.
Transhipment I Common Oay on which 10 days
Re-shipment landing dale cargo lifted prior
cargo of importing 10 loading
vessel on to exporting
vessel.
Shut out End of shift End of shift in wI1ich 96 hours
cargo in which cargo is loaded onto
vessel Shipper/consignees'
compleled loading. Iransport for ,""ivery.
29
Tariff on Goods and Vessels etc. The Chittag0'1 POlt.8.uthority
Cargo 1~1l!1 Slart of Slorage time End of Storage lime Free time
See nole (fI1)
Import cargo End of Shift 96 hours
(Conlainerised) in which
unstuffed,
Export cargo End of Shift End of Shift 168 hours
(Convenlional) in which in which cargo is
cargo received lifted prior to
by Ihe CPA. loading onto vessel.
Export cargo End of shift in which End of shift in which 168 hours
(Containerised) cargo is received cargo is lifted
in container prior to stuffing
freight station into container.
or equivalent.
(ii) Gazetted Public Holidays are not induded in the calculation of the free
storage but they are included in the calculation 01 any subsequent periods
after the free storage time has expired.
(iii) If Ihe shift ends on a Gazefte Public Holiday, Ihe slorage lime will begin on
Ihe nexl working day al 00.00 hours.
(iv) For the purpose oflhis tariff item, days will be counted to indude both the
start day and end day of the storage time. Free time starts from the start of
storage time.
(v) cargo stored in the open shall be charged half the relevant wharf rent tariff
rate.
(vi) This tariff item will include removal for CPA convenience.
(vii) This tariff item will include restacking for CPA convenience,
(viii) Transhipmenl I Reshipmenlcargo delivered locallywil) nol be charged whart
rent according to the transhipment I reshipment rates but instead will be
charged according to the import rales.
(ix) Transhipment J Re-sh ipment cargo delivered locally will receive the same
free period as import cargo, conventional or import cargo, containerised, as
appropriate.
30
Tariff on Goods and Vessels etc. The Chittago
(x) The Jetty authorities reserve to themselves the rig hi 10 charge four limes
Ihe rates given in the wharf rent schedule above for any goods which in their
opinion could have been removed from the jetty premises before wharf rent
was incurred or al any time when in their opinion the presence of such
goods causes serious congestion in the wharf rent schedule above for any
transit sheds or warehouse or constitutes a danger to the life and property
in the jetties, after receiving a notice to Ihat effect.
(xi) The whart rent above shall be charged to conventional cargo and to
containerised cargo, when the containerised cargo is outside the container.
(xii) Cargo held in the locidast, with the exception of damaged packages, will be
charged an additional ten percent wharf rent.
\
TanH
Item
No.
2.7 SPACE RENT
(Authority as agailisllariffitem No. 2.3 above Gild Notification No. CF &
AO-fV( 158YLoose-71576dt. The 9th May. 2004 Published iii the Bangladesh
gazette (Extra Ordinary) on 07-02 -2005.)
31
Tariff on Goods and Vessels etc. _ __ The Chittagong Port Authority
Notes : (i) Open area will be charged space renl al half rale.
(ii) Time is counted after the issue of storage order by CPA. The day on which
the storage order issued is not counted for space rent.
~ii) For the period before space rent is charged, the cargo will be charged wharf
rent , according to tariff item 2.6.
(iv) Movemenl 01 cargobelween (1) Ihe place 01whal renl (2) Ihe place 01 space
rent is the responsiblity of the shipper I consignee.
(v) Space rent is only provided for an area of 100' square metres or more, per
consignment.
(vi) For the purpose of this tariff item, International. Transit Cargo is defined as
cargo under Special Arrangement, which will pass th ~~JLl gh Bangladesh before
delivery in another country. This definition exdudes transhipment I reshipment
cargo.
Tariff
Item
No.
2.8 REMOVAL CHARGES
(Allfho rity- Notification No. CF & Ao-IV (/58) / Loosr: / 78 dared 5.6.90
Pllblished ill rhe B(lJlgl(lde~'h Gazelte parr VI Oft 6.9.90) & NOlijicatioll No.
CF & AO - IV (J 58) Loo.<e//37 dr. 4.10.90 Gazelled on /0./.9/ ).
Rate of charges
2.8.1. Removal will1loading unloading 7 times the landing or
Shipping Traiff.
2.8.2 Removal wilhout loading unloading 2 times the landing or
Shipping Traifl.
2.8.3 Removal, wilhoul loading unloading 41/ l limes the landing or
by CPA equipmenlS including Shipping lariff.
unassisled removal by CPA Fork Ufts.
Noles : (i) This lariff covers Ihe movemenl byCPA 01 cargo between Ihe hook 01 vessel
and place of storage when that place is more than five hundred feet from
Ihe hook.
(ii) Tallff ilem 2.8.1 shall be charged. allhe place 01 slorage CPA mechan ~
equipment is used for loading or unloading onto from transport.
(iii) Deleled.
32
Tariff all Goods and Vessels etc. _ __ rhe Chittdgong Port Authority
(iv) Cargo stored in transit sheds or between transit sheds may be moved more
than five hundred feet to or from vessel hook because the vessel is at a
berth which has no adjacent transit shed. In such cases tariff item 2.8 is not
charged.
(v) Removal operation will be permitted in exceptional circumstances, upon
written permission of a person specifically authorised by Ihe Jetty Authorities.
(vi) the landing or shipping tariff is given at tariff item 2.2 for the import or export
cargo, as apporpriate
Tariff
IlemNo.
2.9 RESTACKING ~Po,!JY ENTIQNALl
(Authoriry as agaillst Ulriffitem No. 2.3 ah ove)
Rale of Charge
2.9.1 Reslacking with CPA labour (and 50 Percenl of Ihe
equipment if considered necessary landing or shipping
by CPA). charge shown at
item 2.2.1 or 2.2.2 or
2.5 as appropriate.
Note : (1 )This tariff item will nol be charged for conventional cargo unless re-stacking
is done following a wrillen request.
2.1 0 TERMINAL CHARGE ON RIVER TRAFFIC
(Authority as agaillsttarifjitem No. 2.3 above)
Basis of charges ~
2.10.1 Tenminal charge , river lariflC per 1000 kg. or Tic 21 .70
part Ihereof
Nole : (1) Tariff ilem 2.10 shall be charged in respecl of cargo loaded onlo or shipped
from inland vessles while alongside the CPA wharves.
2.11 TERMINAL CHARGE ON RAILTRAFFlC
(Authority as agaillsr tarijfilem No. 2.3 above)
Basis of Charges ~
33
Tariff on Goods and Vessels etc. The Chittagong Port Authority
NOTE : (i) Tanff item 2.11.t shall be charged in respect of cargo loaded onto or
discharged from rail wagons within the Port Protected Area.
(ii) Tariff item 2.11.2 shall be charged in respect of cargo loaded onto or
discharged from rail wagons outside the Port protected area which passes
over the CPA railway lines.
(iii) Tariff item 2.11.2 replaces the way leavs·lariff previously charged.
(iv) Tariff ilem 2.11 will be calculated on the 000 kg. cargo, nolan Ihe 000 kg. of
the wagon.
Tariff
Item
No.
2.12 DEMURRAGE CHARGE ON BAIL WAGON
(Authority as againsT tariff item No. 2.3 above)
Basi s of Charges ~
34
on Goods and Vessels etc. The Chittagong PortA thority
Tariff
Item
No.
2.13 SORTING CHARGES
(Authority as againsT tariff item No. 23 above)
The Jetty Authorities do nol undertak.e to deliver goods by size or under mark of
consignements landed ex. Vessel or crafts by marks or nil marks.
(i) If any consignee requires delivery of iron consignment, corrugated sheets
and either nil mark or marked packages landed in mixed slings ex. vessel
by size and by under mark, Jetty Authorities will sort and restack the goods
desired by the Importers charging Tk. 4.63 per 1000 kg. or part thereof.
(ii) Selection sorting separating by under marks, grains in bags or other cargo
not other wise provided for, will be allowed in Jetty transit shed, at 37 1/2 of
landing or other wise shipping rales plus rent, if due provided the cargo is in
good outward condition or shipmenl sewn etc.
(iii) For sorting before delivery of cargo landed with marks mixed or for sorting
out mixed marks for shipment of cargo before shipment, a charge equal 10
50% of the landing or shipping charge will be made in addition to landing or
shipping charges, hoisting and rent charge, if accrued, and will be debitable
to the ship or shipper whichever is responsible for the sorting necessary.
Tariff
Item
No.
2.14 TOLL CHARGES
(Authority as against toriff item No. 2.3 above)
Toll charges on all goods and malerials irespective of their volumetric measure
landed on Port Authority and shall be levied@ Tk. 3.69 per 1000 kg. or part thereol
for the first 24 hours or part thereof and for every subsequent 24 hours or part
Ihereof. Tk. 6.15 per 1000 kg. or part thereof.
35
Tariff on Goods and Vessels etc. The Chittag01l.9 PO(tA,jV"hority
TARIFF SECTION - III
CHARGES FOR GENERAL SERVICES
- jff on Gooch. dnd Vessels etc _ __ The Chinagong POLt Au hority
Note : A Charges under this section may be charged to the shipper or consignee or
owner or agent of the vessel or any other party, as appropriate.
B. Payment for the charges under this section shall be received in Bangladesh
Taka. The exchange rale USSI Taka 10 be used will be Ihal operaled by Ihe
CPA on the day of vessels entry Of on the date the service is provided. If on
that day CPA does nol operate an exchange rate, the rate used shall be that
of the next working day.
Tariff
Item
No.
3.1 HIRE OF MECHANICAL EQUIPMENTS,
APPLIANCES AND VEHICLES
(Authority: NOlificmioll No. CF & AO-I V (158) 1943 dared 19.10.86.
Published in the B(lIIgfadesh Gazelle Part VIII on 30./0.86)
Basis of Rate of
Charges Charges
3.1.1 Mobile Crane wilh lifting capacity :
(a) Upto and including 10 Ions Per hour or Tk. l90.00
part thereof
(b) Above 10 Ions do Tk.380.00
3. 1.2 Forklift Truck wilh lifting capacity :
(a) Upl0 and including 10 10ns do Tk.95.00
(b) Above 10 Ions do Tk. 190.00
3.1.3 Prime Mover with Towing Capacity;
(a) UplO and including 10 Ions do Tk. 85.00
(b) Above 10 10ns do Tk. 170.00
3.1.4 Trailer of Carrying Capacity :
(a) Uplo and including 10 10ns do Tk.30.00
(b) Above 10 Ions do Tk.60.00
3.1.5 Battery Operaled do Tk. 50.00
Truck (B. O. T.)
39
ill
Nole: (i) Tariff item 3.1 will only be applicable for purposes othe r than continer or
cargo handling operations on the wharf.
(ii) If the cancellation of an order is not received at least 2 hours before the time
of start a charge will be made based on the use of that equipment lor one
hour.
(iii) Hire charge will be increased by 25 percent for work on Gazetted Public
Holidays or Fridays.
(iv) Hire Charges include CPA driver except for tariff item 3.1.4 (trailer)
(v) Hire charges tor tariff item 3.1.1 (Mobile Crane) includes CPA driver and
CPA attendant.
(vi) Period of hire will be calculated as follows:
Start Finish
Inside Port Protected Equipment Equipment
Area, including arrives at the leaves the
on board vessel place of work place 01 work
40
iff on Goods and Vessels etc. The ChittagO ~ortAU hority
41
Tariff on Goods and Vessels etc. _ _ he Chinagong Port A u~ho rity
Tariff
Item
No.
3.3 HtRE QF MISCEllANEQUS GEARS
(AlI lhority as agllillsl tariff item No. 3.1 above)
Basis of Rate of
I Charges Charges
3.3.1 Hire of Tarpaulin :
(a) Not exceeding 10 sq. per diem or part Tk. 1000
metres thereof
(b) Exceeding 10sq. metres do Tk.20.oo
but not exceeding
100 sq. metres.
(c) Exceeding 100Sq. metres Per diem or Tk. 30.oo
but not exceeding Part thereof
150 Sq. metres.
(d) Exceeding 150 Sq. metres do Tk. 4O.oo
but not exceeding
200 Sq. metres
(e) Exceeding 200 Sq. metres do Tk. SO.OO
but not exceeding
2SO Sq. metres
(f) Exceeding 250 Sq. metres do Tk.70.00
3.3.2 Hire Qflub do Tk.31 .25
3.3.3 Hire of Slings
(a) Not Exceeding 3tons, do Tk.45.oo
(b) Exceeding 3 fans, but nof do Tk.90.00
Exceeding 10 Ions.
(c) Exceeding 10 Ions. but do Tk. 180.00
nol Exceeding 20 Ions.
(d) Exceeding 20 tons. do Tk.380.00
3.3.4 Hire of gangway do US$ 3.00
42
00 Goods and Vessels etc _ __ The Chittagong Port Authority
Tariff
1Iem No.
3.3.5 Hire of wire hawsers, anchor, spring etc.
(Authority: NOlificationNo. CF & AO - IV (149) Pt. 11114216 dIed 13.5.82.
Published j'l the Bangladesh Gazelle Parr VIJ/ 0 11 20.5.82 and Notificarion
No. CF & AO - IV (158) 1197 daled 4-9-86 Published ill the Bangladesh
Gazette Pan VIII 01118-9-86).
(a) Hire of wire hawsers for each hawser per US$ 5.95
diem or pari thereof.
(b) Hire of anchor for each anchor per diem US$ 29.BO
or pari thereof.
(c) For the use of spring, attached to lugs OIl USS10.45
each occasion.
(d) For the use of hawser attached to tugs USS 11.90
on each ocasion.
3.4 EIRE SERVICE CHARGES
(Amhority liS against tariff item No. 3.1. Abo ve)
Basis of Rale of
43
Tariff on Goods and Vessels etc. The Chittagof\Q Port AuthoritJ
Tariff
Ilem No.
3.5 HIRE OF SLIPWAY
(AurorilY as against tarifitem No. 3.1. Above)
Basis of Rale of
Charges Charges
3.5.1 Sadarghal Slipaway per diem or part US$I'.0
Thereof
3.5.2 Flolilla slipway do US$ 23.80
3.5.3 New Slipway 1200 DWT do US$ 365.00
3.5.4 New Sfipway 50 DWT do US$ 119.00
Notes : (i) The charges as per Schedule for any other CPA services, if utilised, are also
realisable.
Tariff
Item No.
3.6 SALVAG~ AND DIVIN!:i CHABG~S :
(A Ulhorily as against tariff item No.3. 1. Above)
Basis of Rale of
Charges Charges
3.6.1 Diving Boal. per diem or part USS 178.60
thereof
3.6.2 For hire of Salvage Diving Unit do USS 71.50
3.6.3 For hire of SLV for Salvage Work
(aJ Inside port limits do US$ 297.85
(bJ Out side port limits do USS 297.85
3.6.4 Salvage Compressor Unit do US$ 71.45
3.6.5 For hire of Riggers Unit do US$ 59.55
3.6.6 For hire of Salvage Pontoons:
(aJ 200 Ions capacily do U5S35.C::
(bJ 60 Ions capacity do Z!2:
3.6.7 For Hire of Entire Salvage Unit do USS:3.E ""I::
riff on Goods and Vessels etc.
•-
" , The Chitta90l1..gPortAu~hority
45
I
I . - _Tariff on Goods and Vessels etc. _ __ The Chittagol19-PortA hority
46
- ti ff on Goods and Vessels etc. TheChitta90ns ~o Au hority
Tariff
ttem
No.
3.12. ENTRANCE TO JffilES
(Allthorityas against tariff item No.3. I. Above)
3.12.1 A gate pass for one year will be issued on payment of Tk. 25.00 for each person
intending to enter the protected area except Gov!. Officers, Steamers Agent, Railway,
Port and Customs Officers.
3.12.2 A temporary Gate Pass valid for one month only will be issued on payment of Tk.
2.50 except ship's Officer and Crew.
3.13. CHARGES ON LORRIES CARTS ETC;
(Autho rity as against tariff item No. 3.1. Above)
Loaded Carts and Lorries if detained within the Jelly Premises over night with
ImportlExport Cargo intended for delivery I shipment per Cart or lorry will be charged
Tk. 12.50 per night if the detention has been through any neglect of the owner or
the hirer of such vehicles.
3.14 HIRE OF DUMP BARGES
(A uthority: Notification No. CF & AO -IV(l49) Pt. 11114216 daled J3.5.82
Published ill the l1allgladesh Gazefle Part VIJJ 01120.5.82 mId Notijiclltion
No. CF & AO- IV (158) J197 dated 4-9-86 Published ill [lIe Bangladesh
Gazelle Parl VIII 011 /8-9-86).
For any lime between 6 A. M. of one day US$ 41.70
10 6A. M. of Ihe following day or 6 P. M. of one
day 10 6. P. M. of Ihe following day.
Nole ; (il in addilion lariff ilem 1.3.2 charges for Tug Happlicable will be charged.
3.15 HIRE OF EXPLOSIVE BARGES
(Authority Ql" agai/lst toriJ item No.3. 14 above)
For any time between 6 A. M. of one day US$ 59.55
to 6 A. M. of !he following day or 6 P. M. of one
day 10 6 P. M. of the following day.
Nola: (il in addition tariff item 1.3.2 charges for Tug if applicable will be charged.
47
Tariff on Goods and Vessels etc.
TARIFF SECTION - IV
CONTAINERS
(CHARGES TO THE ACCOUNT OF THE
AGENT OR CHARTERER OR OWNER OF
THE VESSEL EXCEPT WHERE
OTHERWISE INDICATED)
I
~ari ff on Goods and Vessels etc. The Chinag ong Per .Authority
TARIFF SECTION - IV
CONTAINERS
(Charges to the account of the Agent or charterer or owner of the vessel except where
othelWise indicated)
In addilion to the charges in section -IV, the charges in Section-1, Section- III, and Section
• V, if applicable, are also realisable.
Traiff
Item
No.
4.1 LOADING OR PISCHARGING CONTAINERS.
(Amhoriry : Notification No. CF & AO . IV (158) 23 77 dated 18-11-86
Published ill fh e Bangladesh Gazelle Pan VIII 0 11 27- Jl -86, NotijiClIfioll
110. CF&AO-IV(158)ILoou-71274 dared 04-10-2007 Published ill the
Brl.llglades/l Gazette (Exlm Ordinary) 0/1 24.10.2007 & Notificatioll no.
CF &AO-IV( 158)ILoose-61491 dated 14-05-2008 publish ed ill fhe
Bangladesh Gazette (ExIra Ordinary) 011 11 -06-2008.)
Rates
Particulars of Charges Basis of Not Exceeding Exceeding
Charges 21 leetlength 21 leetlength
51
Tariff on Goods and Vessels etc. The Chittagong PortAuthority
(iii) CPA reserves the right to refuse to receive export cargo lor stuffing if this
ca rgo is presented less than 36 hours before the expected time of berthing of
the exporting vessel.
(iv) Transhipment oontainers shall be charged at one and half times the loading or
discharging rate. This charge covers both the discharging and subsequent
loading of the container.
(v) Inland river containers shall be charged at three quarters of the loading or
discharging rate for the movement to or from the inland point. The previous or
subsequent movement for the purpose of movement to or from a foreign port
will be charged at the full loading or discharging tariff rate.
(vi) For overside loading or discharging of container the charges shall be 40% of
the rates shown.
(vii) Overheight containers shall be charged at one and a half times the loading or
discharging rate. Overtheight containers are in excess of nine feet high.
(viiA) Open top or f lat or Side open empty container/Such loaded container having
projected cargo shall be charged at two times the loading or discharging rates.
(viii) Due to non-availability 01 CPA equipment if Authority asks any Shipping Agentl
Owner of the vessel to use their own equipment to assist in loading or
discharging, the charges shall be 70% of the rates shown. This is applicable
for handling of container from hook point to container yard and vice versa in
CPA protected area. For LCL loadi ng/discharging, this rebate shall be given
on the basis of FCL rate shown.
(ix) If no CPA equipment is used for loadin g or discharging the charge shall be
40'% of the rate shown and this is applicable for direct delivery or shipment to
and from Off Dock or Consignee/Shipper's premises due to non-availability of
space lor storage, stacking or re-stacking of container in the CPA yards. If
direct delivery or shipment takes place in CCT or any other jetty where Quay
Gantry Crane is installed the charges shall be 70% of the rates ~hown.
52
Tarif! on Goods and Vessels etc. The Chiltagong Port Authority
Tariff
Item
No.
4.2 "SHAKTIMAN' (CONTAINER)
(Authority: Norijicalion No, CF & AD -IV ( 158) J198 tinted 4-9-86 Published
in the 8all~ladesh Gazette Part VJJlolI 18-9 -86 )
Per Container
CMrges for use of Floating Crane Not exceeding Exceedi ng
21 ft. Lenglh 21 ft. Le nglh
NOTES (A) (i) If the floating crane is not used for containers it will not be charged.
(ii) Hire charges a14.2.2 shall be payable in addition to 4.2.1 Of 4.2.4 or 4.2.5
as apporpriate.
53
Tariff on Goods and Vessels etc. The Chittagol"\g. fO ~
(iii) Tariff item 4.2.3 cancellation shall be charged if, the order for floating crane is
cancelled less than 8 hours before hire was due to start.
(vi) Overheight Containers shall be charged at one and ha~ times the rate for
floating crane (Containers)
NOTE : (B) Paymenllor Ihe charges lor use of "F. C. Shakliman" shall be received in
Bangladesh Taka. The exchange rale US$ Taka 10 be used will be Ihat operaled
by the CPA on the day of vessels enlry. lf on Ihat day the CPA does not operate
an exchange rate. The rate used shalf be that of the next working day.
NOTE: (C) The crane is not meant for storage of cargo f container on board the vessel or
carriage of such cargo I container. In exceptional circumstances , if the Port
Authority allow temporary storage of cargo I container, storage rent@ US$
0.60 per 1000 kg. or part thereof, per diem or part thereof shall be charged
extra. Relitting of such cargo I container will be charged at the rale of 50% of
Ihe orginal lifting charge. In the event of carriage of such cargo I container
from the place of loading to the discharging point other than in cases of Jetty
Convenienc ",II be required to pay haulage @ US$ 3.00 per 1000 kg. or pa rt
Iherol.
NOTE : (D) An applicalion in the proforma as may be prescribed by the Port Authority from
time to time for use of the Floating Crane shall ordinarily be made to the DTM
(Operalion) CPA ATLEAST 24 hours in advance of the time when the floaling
crane is requ ired.
54
-ariff on Goods and Vessels etc. The Chinago n9Po~ thority
Tanff
Item No.
4.3 STORAGE CHARGES. CONTAINERS AND NON-CPA EQUIPMENT
(Allfliorily- NOTificatioll No. CF &AO-IV( 158)/2377 datell 18-1 1-86 published
ill/he Bangladesh Gazette pari Vlllon 27-J J-86, Notificalion No. CF&AO-
lV( 158)1Loose-6f19 Dared 18111 April, 2007 Published in Bangladesh Gazette,
Exrra-Onlillary on 25th April. 2007 & Notificarion No. CF&AO-1V( /58)/
Loose-712 73 dared- 0411012007 published if! the Bangladesh Gilzette (E::ara
Ordinary) 0 11 24 -10-2007).
Basis of Charges ~(US$)
2 3
Not Exceeding 21ft. Length
4.3.t Storage Charges : Per container,
Loaded Container per diem or part thereof
(a) Upto & including the -do- 6.00
7th days after the expiry
of the free period.
(b) From the 8th to -do- t2 .00
the 20th days
(c) For each subsequent day -do- 24.00
4.3.2 Storage Charges: Per container,
Empty Container per diem or
part thereof
(a) First 7 days -do- 6.00
(b) From the 8th to -do- 12.00
the 20th days
(c) For each subsequent day -do- 24.00
Exceeding 21ft. but not eXceeding
41ft. Length
4.3.t Storage Charges: Per container,
Loaded Container per diem or part
thereof
55
Tariff on Goods and Vessels etc. _ __ The Chittagol1,g PortAuthority
56
-I ff on Goods and Vessels e tc. The Chittago
57
Tariff on Goods and Vessels etc. The Chittagon ~ort Authority
be 10 Ihe account of the consignee. The free storage period given in tariff item
2.6 will be allowed from the end of the shift in which the container is unSluffed.
(vii) Before stuffing, the contents of export containers shall be charged wharf rent or
space rent according to tariff item 2.6 or 2.7. That charge will be to the account
of the shipper. The free storage period given in tariff item 2.6 will be allowed
from the end of the shift in which the export cargo is received.
(viii) Storage charges in respect of FCL containers will be to the acount of the shipper
or consignee.
(ix) Open top or Flat or Side open empty or loaded container shall be charged at
two times of the rates shown.
Triff
Item
No.
4.4 EXTRA CONTAINER MOVEMENT
(Authority- Notification No. CF&AO-/\I( 158)12377 dated J8-J J -86 published
ill the Bangladesh Gazette part VlfJ on 27-/1-86)
Rates
Particulars of Charges Basis of
Charoes
Not Exceeding Exceeding
21 leet lenoth
I 21 leet leomh
4.4.1 Extra container movement:
(a) Loaded container per container US$ 42.60 USS 63.90
per movement
(b) Empty conlainer do USS 21.70 USS 32.50
Notes: (i) The tariff item 4.1 and 5.2 cover the cost of the container movement necessary
between jetty container yard and container freight station. Tariff item 4.4 will
be charged for moves of restaking which are:
Either: (1) Made on written request; the requesting party will be charged
or (2) As a direct result of a change of status; the party advising change of status
will be charged.
(ii) Movement are restricted to betvveen two paints within the Port Protected Area.
For moves outside this area equipment must be hired (see section III of this
tariff)
58
Tariff on Good... and Ve~ ...els etc. The Chittagof\9"portAu horit y
Tariff
Item No.
4.5 REEFER CONTAINER SERIJICE
(Authority- Notificatioll No. CF&AO-IV( J58Y2377 daJeclJS-11 -86 published
in the Bangladesh Gazette part VIII 011 27·11-86 alld Notification No.
CF&AO-IV( /S8yLoose-71274 dated 04-10-2007 published in the Bangladesh
Gazette (Extra Ordinary) 24- 10-2007)
Particulars of Charges Basis of charge Bam
4.5.1 Supply of Eleclricily, connecting per container US$ 9.00
and Disconnecting of reefer per diem or
including monitoring. part Ihereol
4.6 CHANGE OF STATUS
(Authority Notification No. CF&AO·IV(158)/2377 dated 18-11·86 published in the
Bangladesh Gazette part VIII on 27-11-86)
Par1iculars of Charges Basis or charges Rates
4.6.1 Change 01 status per container USS 10.00
per change
Notes: (i) Change of status is defined for Ihe purpose of this tariff item as taking place
when:
Either. (1) Aconlainer will be unstuffed by CPA when ~ had perviou~y been declared
to CPA as FCL.
or, (2)Acontainerwill not be unstuffed by CPA when it had previously been declared
10 CPA as LCL.
(ii) change of status will not be charged jf the CPA notified more than 24 hours
before:
either, (1) The vessel carrying the import or transhipment container arrives at the
CPA wharves.
or. (2)The export container arrives at the CPA port protected area.
(iii) If the CPA have to carry oul extra moves as a result of the change of status,
the ex1ra movement v-Jill be charged at the rates shown at ta riff item 4.4
(iv) The change 01 slatus charge is payable by the party who advises the change
10 the CPA.
[Payment for the charges on containers and contents shall be received in Bangladesh Taka. The
exchange rate USS / Tak. to be used will be thai operated by the CPA on the day 01 vessels entry.
If on thai day lhe CPA does not operate an exchange rate, 1I1e rale used shall be thaI of 1I1e nexl
IVorl<ing day.]
59
Tariff on Goods and Vessels etc. The ChittagO ~OJ:!".A~thority
TARIFF SECTION- V
CONTAINERS
CHARGES TO THE ACCOUNT OF
THE SHIPPER I CONSIGNEE! SHIPPING
AGENT CHARGES LEVIED UNDER
THE AUTHORITY OF THE CHITIAGONG
PORT AUTHORITY ORDINANCE - 1976
>
Tariff on Goods and Vessels etc. The Chinagong ~oLtAuthority
TARIFF SECTION - V
CONTAINERS
63
Tanff on Goods and Vessels etc. The Chitta gong PortAutho
Tariff
Hem
No.
5.2 STUFING { UNSTUFFING
(A lllhoriry Notification No. CF &AO~/ V( 158Y2377 daled /8-// -86 pftblishLti
in the Bangladesh Gazette part Vllr on 27-11 -86, Notificatioll No, CF & AO
- /V (] 58) Lose 78 dared 5-6-90 Published in the Bangladesh Gazette Parr
VI o!l6-9-90 & Noriji cmion CF&AO-IV{ J58)/Loose-6J489 dated 14-05-2008
published ill/he Bangladesh Gazeue (Extra Ordinal),) on 1l -06-2008).
Particulars of Charge Basis of charges ~
either: (1) Receipt of cargo at the Container Freight Station or equivalent, Prior to
stuffing into Containers.
(2) Delivery of cargo at the Container Freight Station or equivalent after it
has been unsluffed from Container.
5.4 ROAD WEIGH BRIDGE (containers) · Rale nol noiITied.
5.5 LIFT ON / LIFT OFF CHARGE
(Authority - Notijicarioll No. CF &AO-IV(J58)12377 dared 18-11 -86 published
ill/he Bangladesh Gazelle part VIII on 27-1 ) -86 and Notification No. CF &
AO-IV(.l58)/Loose-7//l0 dt. The 9th August, 2004 Published in Ihe
Bangladesh gazette (Extra Ordinary) on 07022005).
Rates
Particulars of Basis of Not Exceeding Exceeding
Charges Charges 21 leellength 21 leet length
5.5.1 Lin on~ilt all charge, per Container Tk. 1000/· Tk.1500/·
loaded container.
5.5.2 Lift on I lift off charge, do Tk. 3751· Tk. 562.50/·
empty container.
Notes: (i) This tariff item will be charged when a container is received from or delivered
to outside road rail or river transport.
(ii) This tariff item covers:
(1) Movement of the container between the Container Yard or other
place of storage and the road, rail or river transport.
and (2) Lifting the container on to or off the road, rail or river transport.
(iii) There will be no additional charge under this tariff item, or under tariff item
5.3 hoisting (Containerised) in respect of the contents of the container. At a
previous or subsequent occasion the contents, before stuffing or after
unstuffing, may be liable to that charge.
(iv) The re will be no additional charge under this tariff item in respect of work at
night or on Fridays or Gazetted Public Holidays.
(v) Overheight containers shall be charged at one and a half times and the
rate shown at tariff item No. 5.5.1 and 5.5.2. Overheight containers are in
excess of nine feet high.
65
Tariff on Goods and Vessels etc. The Chittagong Port-.Au hority
TARIFF SECTION - VI
TARIFF SECTION - VI
(Authority Notificatioll NoISRO·88·U82 dt. 27·2·82 Published 011 27-2-82 )
The following fees shall be payable for the issue. renewal etc. of Passenger boat
licences:
(A) (1 ) For surveying, reg istering, licencing and issuing Tk.3.oo
licence on passenger boats
(2) Painting numbers of licence of passenger boat Tk. 1.00
in vernacular.
(3) licence for person in charge of boats Tk. 1.00
(4) Endoresmenl of charge of owner on Register Tk.2oo
and licence.
(5) Issue of new licence to boat of Tickets to 1.00
Manjhees in lieu of those defaced or lost.
(B) (a) The following shall be the scale of charge for the
hire of licenced boats plying between steamers
lying at moorings & the shore in the harbour limits:
(i) Between 5 A. M. to 7 P. M. for each adult passenger Tk.O.25
from or to the steamers with baggage not exceeding 9 Kgs.
For each passenger under 12 years with
baggage as above Tk.0.10
For luggage in excess of 9 kgs. Tk.O.lO
per 37 kg'. or
part thereof
(ii) Between 7 P. M. 10 5 A. M. Double the
above fare
(b) Scale of charge within port limits for each do
adult passenger with baggage not
exceeding 9 kgs.
(i) Between 5 A. M. to 7 P. M.
sadarghat to any place upto Chaktai Tk.0.5O
69
Tariff on Goods and Vessels etc. The Chittago
t-. -,~_. licence fees for Balam Boat shall be as for cargo Boat or flat.
70
leD PART (DHAKA)
Jariff on Good~ dnd Vesseb e tl. _ _
. IliG PI T AUTHORITV
r
I. C, D, PART (DHAKA)
(AlI thqrity: Notification No. CF & AO - IV ( J58Y2 dated 16. 7.90
Published il/rhe Ballghulesh Gazelle Part VI 011 6.9.90.)
The rates of dues and charges for handling Co ntainers and goods on
Import & Export at Inland Container Depot at Kama lapur, Dhaka sha ll be
as follows :
F'
Tanff Rates
Item Particu lars of Charges 8aiss of No Exceeding Exceeding
No, Charges 211eellength 21 feel length
6,1.1 liN off Per loaded Container Tk,600,00 Tk,900.00
6.1.2 do per Empty container Tk.300.00 Tk.450,00
6,1.3 Uft on per loaded container Tk,600,00 Tk,900,00
6.1.4 do per Empty Container Tk,300.00 Tk.450,00
(i) Tariff 6.1,1 & 6,1.2 is leviable lor unloading Conlainers from Wagons of Road
Transports and includes movement upto the storage points.
(ii) Tariff item 6.1.3 & 6.1.4 is leviable for unloading Containers from Wagons of
road Transports and includes movement upto the storage points.
(iii) No hoisting charges for Containers (with their contents or empty) will be leviable.
(iv) No additonal charge in respect of work at night on Fridays or Gazetted Public
H"idays,
(v) Chargeable ale hirers.
73
Tariff on Good!> and Vessels etc. n le Ch inago I;ort}.uthority
Tariff
Item .~
No.
6.2 STUFFING & UNSTUFFING CHARGES :
(Auth ority NOlifjcatio" No, CF & AO (158) Loose J38 date 4-10·90 Published
ill r/ie Ballgladesh Ga~lIe Port VI 011 JO-01 ·91 & Notification CF&AO-IV( /58)/
Loose-61490dated 14-05-2008 published iii the BOllglade8h Gal,.ctte (Extra
Ordinary) 011 JJ ·06-2008)
Basis of charges Rates
6-2.1 Stuffing per Metric Ton or Tk. 3oo.oo
part thereof
6.2.2 Unstuffing per Metric Ton or Tk.3OO.oo
part thereof
Notes : (i) Stuffing and unstufflng charge is applicable lor LCL Imports f Exports.
(ii) All Containers stuffed 'Within the ICD permises shall be trealed as LCL containers
for fhe purpose of this tarift.
(iii) Contents from LCL container if delivered direct to or stuffed direct from
Consignee's I Shipper's Transport this tariff item will be charged.
(iv) This tariff item will cover the movements of contents from J to storage point of
LCL Containers.
(v) For Delivery of conlents 01 FCL cootainer allGD premises, the consignees will
destuff Ihe container for direct delivery of the contents at their entire cost risk
and responsibility. For desturffing and delivery, the consignees will engage
ICD registered I authorised labourers at the presceribed wage rates.
(vi) Ale. Consignee I Shipper
Tariff
item
No.
6.3 EXTRA MOVEMENT CHARGE :
Basis of Rates
Service Charges 20 ' 1 40'
6.3.1 Extra handling 01 per Container US$ 25.56 USS 38.34
Loaded Container
6.3.2 Empty Container per Container US$ 13.02 US$19.SO
74
Ta riff on Goods. dnd Ves.s.els. etc. The Chitta go g.Por:tAUJ:hority
Notes: (i) These tariff item will cover the cost of the container movements necessary
between Rai!way Track /Terminal Container yard and container freight station.
These tariff item will be charged for moves or reslaking which are:
either (1) Made on wrinen request, the requesting party will be charged.
or (2) As a direct resuH of a change of status; the party advising change of status
will be charged.
(ii) Moves are restricted 10 between two paints within the leD Protected Area.
Tariff
Item
No.
6.4 STORAGE RENT FOR CONTAINERS :
I Upto 28 days After 28 days
Basis of Rates
Service Charaes 20' I 40' I 20' I 40'
per container
per Diem or
part thereof
6.4.1 Storage per loaded US$l.50 USS 3.00 USS 4.50 USS 9.00
Container \
Import F. C. L.
6.4.2 Storage per loaded US$ 1.50 US$ 3.00 US$ 4.50 US$ 9.00
Container
(Export)
6. 4.3 Storage per empty US$ 1.50 US$ 3.00 US$ 4.50 USS 9.00
Container
Notes : (i) Storage charge for FCL Containes wi!! be on account of the Consignee.
(ii) Storage period will be calculated Irom Ihe lollowing date 01 storage ill the
end date of storage.From the start day four days wi!! be free time for import
FCL Conlainers and 7 (Seven) days lor export FCL cootainers.
(iii) LCL containers with its import cargo shall remain free til! the completion of
unstuffing by lCD, ,Store rent will accrue on this Container when emptied
from the following days of unstuffing on account of Ihe conlainer owner Agents.
75
Tariff on Goods and Vessels etc. _ __
"-'
'e-
i" - . ~.
(iv) Empty Coolainers received by ICD incur slore renl from Ihe following day of
receiving.
(v) Contents of Import Containers and export Containers will be charged store
rent as per tariff No. 6.5.1 and 6.5.2 after unstuffing I after receiving aIIGD.
(vi) Conlainers sluffed allCD will be Irealed as LCL conlainers for Ihe purpose
of Ihis lariff.
(vii) Contents of FCL import container may be auctioned on expiry of 45 days
from the date of receiving of the containers at ICD.
lu
6.5. RENT ON CARGO
(Authoriry Notification 110. CF&AO- IV( 15SYLoose-61490dated 14-05-2008
published ill the Ban gladesh GazetTe (Ext ra Ordinary) on JJ-06-2008)
Tariff Item No. 6.5.1
76
Tariff on Goods and Vessels etc.
e-.ffi....""·
I,, . .~, .
Nules . (i) Import Cargo FCl container shall not be unstutfed lor storage in ICD Ware
House.
(ii) Import Cargo unstuffed from LCl container shall be given free storage ICD
ware House I CFS lor 96 hrs. IExcluding Gazelled Public HeJidays) Irom Ihe
end of the shift in which it is unstuffed.
(iii) Export cargo will remain free in the ICDware House I CFS for 168 hrs. (Exduding
Gazetted public Holidays) starting from the end of the shift in which such cargo
is received.
(iv) Rent shall be charged on containerised Cargo only when it is outside the
container.
(v) i'Jc. Consignee I Shipper.
Tanff
lierr No
6.6 HOISTING CHARGES ON CARGO .
. Service IBasis of Charges Rates
6.6.1 Hoisting per 1000 kg or part the real Tk. 56.20
(Import)
6.6.2 Hoisting per 1000 kg. or part thereof Tk. 56.20
(Export)
Notes' (i) This tariff is 10 be charged for receilJing or delivery of ca rgo when the
assistance of Mechanical equipment is extended lor such receiving or delivery
of cargo. ICD may at any time refuse such assistance if appropriate type of
ICD equipments are not aVailable.
(ii) Any single package weighing 250 kg. or above will be treated as jf handled
by ICD Mechanical eqipment. This will not however restrict the use of
Mechanical equipment incase of packages weighing less than 250 kg. on
payment of charges under this tariff.
77
i
'e:='-""
-.! The ChittagO ~ortAu thori tY
Tariff on Goods and Vessels etc. _ _ .., "
Tanfl
Item No.
6.7
76
'M
Tariff
Item
No.
6.9 L. C. L. CONTAINER HANDLING CHARGES ;
Basis of Rates
SelVice Charges 120' 40'
6.9.1 LCL Container per loaded USS 69.28 USS 103.92
Handling Container (Imp.)
6.9.2 do per loaded US$ 69.28 US$ 103.92
conlainer (Exp.)
Noles ' (i) LCL Container destined to and originating from ICD will be treated as FCL
containers at Chittagong Port lor the purpose of realisation of charges.
(ii) LCL charges are realisable on container stuffed I unstuffed at ICD Premises
as above. It will cover the normal movements of the Containers within lCD,
Dhaka between the place of storage and the place of stuffing I unstuffing.
79
Tariff on Goods and Vessels etc. The ChiuagOV hOrilY
LIST OF NOTIFICATIONS
ISSUED FROM TIME TO TIME
Tariff on Goods and Vessels etc.
83
Tariff on Goods and Vessels etc. _ _ The Chittago -£oQ;,t.~hority
84
Tariff on Goods and Vessels etc.
30. do do-/10082-do- do do
31. do do-/10083-do- do do
32. Notification do-/10084-do- do do
33. do do-/1 0085-do- do do
34. do do-/1178-do- do do
dl. 11 -8/78
35. do SRO No, 83/U Published in the Bangladesh extra
78/PO/I R-5m ordinary Gazette on 17-4-78
dt. 14-4-78
36. do CF&AO -IV (149) Published in the Bangladesh
6218 dl. 9-4-80 Gazetle Part VIII on 24-4-78
37. do do-/16249-do do do
38 . . do do-/16250- do- do do
39. do do/-16251-do do do
40. do do-I 162452 do do do
41- do do 1- 16253 - do do do
42. do do-I 16254 do- do do
43. do SRO-261-l-80PE Published in Bangladesh Extra
1502-271781340 Ordinary Gazette on 29+80
dl. 26-7-80
44. do No. SRO-262-L Published in Bangladesh Extra
80/PE/5R-27178- Ordinary Gazetle on 29-7-80
340 dl. 26-7-80
45. do SRO-88-U82 do on 27-2-82
dt. 26-2-82
46. do CF &AO-IV(149) Published in Bangladesh
pt. 11/13452 Gazetle Part VIII on 6-5-82
dt. 28-4-82
47. do CF & AO-IV (149) do on 20-5-82
pt. 11/14216
dt. 13-5-82
85
Tariff on Goods and Vessels etc.
86
Tariff on Goods and Vessels etc.
64. do do-11944 do do do
65. do do-12376 dt. 18-11-86 do do on 27-11-87
66. do do-l2377 do do do
67. do do-13330 do on 22-1-87 do
dV13-1·87
68. do do-/173 Published in the Bangladesh
dt. 16-5-89 Gazette part I on 7 - 9 - 89
69. do do-noose/78 Published in the Bangladesh
dt. 5-6-90 Gazette part VI on 6-9-90
70. do SRO ~b-8 -~-'o Published in the Bangladesh
a./b'~-'¢~~o Gazelle Addilional on 25-7·90
dt. 25-7-90
71. Notification CF &A()'IV (158) Published in the Bangladesh
noose/136 dt. 4-10-90 Gazette Part VI on 10-,.,991
72. do do·/137 do do do
73 do do·/l38 do do do
74. do CF& AO-IV(l58)12 datedI6.7.90 Published in the
Bangladesh Gazelle
part VI on 6-9-90
75. ~J'f,\5ffi1,'(3"1~ ~~ ~/~OO'!l ~ ~~ c-t iSil"JJ'lIl1 ~oo'"
76. Notification on CF &AO·IV(158)ILoose-7/576 dated 09.05.2004 Published
in the Bangladesh Gazette (Extra Ordinary) on 07.02.2005
77. do CF &A()'IV(158).toose·7/tl0, 7th August 2004 Pub:ished in the
8ang~desh Gazette (Extra Ordinary) on 07.02.200B
87
Tariff on Goods and Vessels etc. The Chittago .Pory?\u hority
THE END