Professional Documents
Culture Documents
In the interest of the service and to provide coherence and standards in the
deployment of new Training Regulations for Pressurized Irrigation System
Installation and Maintenance NCII, the following Implementing Guidelines are
hereby issued:
I. BACKGROUND/LEGAL BASIS
• TESDA Board Resolution No. 2019-04 dated 11 January 2019 "Approving and
Promulgating the Training Regulations for Pressurized Irrigation System
Installation and Maintenance NC II".
II. OBJECTIVES
III. COVERAGE
C. Program Registration
,
Unit Code Unit Title
(CoreCompetency) (Core Competency)
AFF712257 Perform installation of pumps
and flow control devices
AFF712258 Perform installation of
pipelines and water
1 distribution devices
1 AFF712259 Perform maintenance of
pressurized irrigation system
D. Trainer's Qualifications
2. Must have at least two (2) years relevant industry experience within the
last five (5) years.
2. Assessment shall cover all the competencies of the qualification with the
basic and common units integrated or assessed concurrently with the
core units of competency.
TESDA CIRCULAR
1SUBJECT: Implementing Guidelines on the ► Page 6 of 7 pages
Deployment of Training Regulations (TR)
and Competency Assessment Tools Number 030, series of 2019
(CATs) for Pressurized Irrigation System
Installation and Maintenance NCII
Date Issued: Effectivity: Supersedes:
01 March 2019 Immediately
the supervision of a Lead Assessor, as part of capability building of
competency assessors;
5. The size requirement for the facilities, List of Supplies, Tools and
Equipment specified in the CATS shall be used in the Accreditation of an
Assessment Center.
C. Assessment Fee
D. Integrity Fortification
2. Pre-scheduled assessment;
gsi •
TESDA CIRCULAR
'SUBJECT: Implementing Guidelines on the 1 Page 7 of 7 pages
Deployment of Training Regulations (TR)
and Competency Assessment Tools I Number 036 series of 2019
(CATs) for Pressurized Irrigation System
Installation and Maintenance NCII
Date Issued: Effectivity: Supersedes:
01 March 2019 Immediately
E. Mandatory Assessment
VI. EFFECTIVITY
This Circular shall take effect as indicated and shall supersede all other
issuances inconsistent hereof. Wide dissemination of this Circular by all concerned
is hereby enjoined.