You are on page 1of 14

Project: ETAP Page: 1

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard

3-Phase Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 5 6

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 0 0 0 1 0 4 5

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 0 0 1

System Frequency: 50.00

Unit System: Metric

Project Filename: KALETEPEKÖK

Output Filename: C:\ETAP 1600\Deneme\Untitled.SA1S


Project: ETAP Page: 2

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: No

Reactor Impedance: No

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: No

Cable Resistance: No
Project: ETAP Page: 3

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HAKKARİ DM SWNG 31.500 31.500 1 100.00 0.00


IŞIKLI KÖK Load 31.500 31.500 1 100.00 0.00
KALE TEPE KÖK Load 31.500 31.500 1 100.00 0.00
KÖPRÜLÜ DM Load 31.500 31.500 1 100.00 0.00
SANAYİ KÖK Load 31.500 31.500 1 100.00 0.00
İŞLETME KÖK Load 31.500 31.500 1 100.00 0.00

6 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project: ETAP Page: 4

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Line/Cable Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable1 33NCUS3 150 2000.0 0 1 90 0.15900 0.11800 0.0000000

Line / Cable resistances are listed at the specified temperatures.


Project: ETAP Page: 5

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

Cable1 Cable IŞIKLI KÖK KALE TEPE KÖK 3.20 2.38 3.99

IŞIKLI KÖK FİDERİ Tie Breaker İŞLETME KÖK IŞIKLI KÖK

KÖPRÜLÜ DM FİDERİ Tie Breaker HAKKARİ DM KÖPRÜLÜ DM

SANAYİ KÖK FİDERİ Tie Breaker KÖPRÜLÜ DM SANAYİ KÖK

İŞLETME KÖK FİDERİ Tie Breaker SANAYİ KÖK İŞLETME KÖK


Project: ETAP Page: 6

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base
ID ID MVASC kV X/R R X

OTLUCA İTM HAKKARİ DM 100.000 31.500 2.00 44.72136 89.44272

Total Connected Power Grids (= 1 ): 100.000 MVA


Project: ETAP Page: 7

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

SHORT-CIRCUIT REPORT

3-phase fault at bus: HAKKARİ DM

Prefault voltage = 31.500 kV = 100.00 % of nominal bus kV (31.500 kV)


= 100.00 % of base (31.500 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

HAKKARİ DM Total 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

OTLUCA İTM HAKKARİ DM 100.00 0.820 -1.639 2.0 1.833 100.00 0.820 -1.639 2.0 1.833

KALE TEPE KÖK IŞIKLI KÖK 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

*İŞLETME KÖK IŞIKLI KÖK 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000

*HAKKARİ DM KÖPRÜLÜ DM 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000

*KÖPRÜLÜ DM SANAYİ KÖK 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000

*SANAYİ KÖK İŞLETME KÖK 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 8

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

3-phase fault at bus: IŞIKLI KÖK

Prefault voltage = 31.500 kV = 100.00 % of nominal bus kV (31.500 kV)


= 100.00 % of base (31.500 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

IŞIKLI KÖK Total 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

KALE TEPE KÖK IŞIKLI KÖK 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

OTLUCA İTM HAKKARİ DM 100.00 0.820 -1.639 2.0 1.833 100.00 0.820 -1.639 2.0 1.833

*İŞLETME KÖK IŞIKLI KÖK 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*HAKKARİ DM KÖPRÜLÜ DM 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*KÖPRÜLÜ DM SANAYİ KÖK 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*SANAYİ KÖK İŞLETME KÖK 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 9

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

3-phase fault at bus: KALE TEPE KÖK

Prefault voltage = 31.500 kV = 100.00 % of nominal bus kV (31.500 kV)


= 100.00 % of base (31.500 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

KALE TEPE KÖK Total 0.00 0.819 -1.569 1.9 1.770 0.00 0.819 -1.569 1.9 1.770

IŞIKLI KÖK KALE TEPE KÖK 3.85 0.819 -1.569 1.9 1.770 3.85 0.819 -1.569 1.9 1.770

OTLUCA İTM HAKKARİ DM 100.00 0.819 -1.569 1.9 1.770 100.00 0.819 -1.569 1.9 1.770

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 10

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

3-phase fault at bus: KÖPRÜLÜ DM

Prefault voltage = 31.500 kV = 100.00 % of nominal bus kV (31.500 kV)


= 100.00 % of base (31.500 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

KÖPRÜLÜ DM Total 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

KALE TEPE KÖK IŞIKLI KÖK 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

OTLUCA İTM HAKKARİ DM 100.00 0.820 -1.639 2.0 1.833 100.00 0.820 -1.639 2.0 1.833

*IŞIKLI KÖK İŞLETME KÖK 0.00 0.000 0.000 1.2 0.000 0.00 0.000 0.000 1.2 0.000

*HAKKARİ DM KÖPRÜLÜ DM 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*SANAYİ KÖK KÖPRÜLÜ DM 0.00 0.000 0.000 1.4 0.000 0.00 0.000 0.000 1.4 0.000

*İŞLETME KÖK SANAYİ KÖK 0.00 0.000 0.000 1.2 0.000 0.00 0.000 0.000 1.2 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 11

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

3-phase fault at bus: SANAYİ KÖK

Prefault voltage = 31.500 kV = 100.00 % of nominal bus kV (31.500 kV)


= 100.00 % of base (31.500 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

SANAYİ KÖK Total 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

KALE TEPE KÖK IŞIKLI KÖK 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

OTLUCA İTM HAKKARİ DM 100.00 0.820 -1.639 2.0 1.833 100.00 0.820 -1.639 2.0 1.833

*IŞIKLI KÖK İŞLETME KÖK 0.00 0.000 0.000 1.2 0.000 0.00 0.000 0.000 1.2 0.000

*HAKKARİ DM KÖPRÜLÜ DM 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*KÖPRÜLÜ DM SANAYİ KÖK 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*İŞLETME KÖK SANAYİ KÖK 0.00 0.000 0.000 1.2 0.000 0.00 0.000 0.000 1.2 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 12

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

3-phase fault at bus: İŞLETME KÖK

Prefault voltage = 31.500 kV = 100.00 % of nominal bus kV (31.500 kV)


= 100.00 % of base (31.500 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

İŞLETME KÖK Total 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

OTLUCA İTM HAKKARİ DM 100.00 0.820 -1.639 2.0 1.833 100.00 0.820 -1.639 2.0 1.833

KALE TEPE KÖK IŞIKLI KÖK 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

*IŞIKLI KÖK İŞLETME KÖK 0.00 0.000 0.000 1.2 0.000 0.00 0.000 0.000 1.2 0.000

*HAKKARİ DM KÖPRÜLÜ DM 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*KÖPRÜLÜ DM SANAYİ KÖK 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

*SANAYİ KÖK İŞLETME KÖK 0.00 0.820 -1.639 2.0 1.833 0.00 0.820 -1.639 2.0 1.833

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 13

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Momentary Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

HAKKARİ DM 31.500 HAKKARİ DM Bus 1.833 2.0 1.042 1.910 3.131

IŞIKLI KÖK 31.500 IŞIKLI KÖK Bus 1.833 2.0 1.042 1.910 3.131

KALE TEPE KÖK 31.500 KALE TEPE KÖK Bus 1.770 1.9 1.037 1.835 2.988

KÖPRÜLÜ DM 31.500 KÖPRÜLÜ DM Switchgear 1.833 2.0 1.042 1.910 3.131

SANAYİ KÖK 31.500 SANAYİ KÖK Bus 1.833 2.0 1.042 1.910 3.131

İŞLETME KÖK 31.500 İŞLETME KÖK Bus 1.833 2.0 1.042 1.910 3.131

- Method: IEEE - X/R is calculated from separate R & X networks.


- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

- The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.

* Indicates a device with momentary duty exceeding the device capability.


Project: ETAP Page: 14

Location: 16.0.0C Date: 09-01-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SCIEC
Filename: KALETEPEKÖK Config.: Normal

Interrupting Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
HAKKARİ DM 31.500 1.833 2.0

IŞIKLI KÖK 31.500 1.833 2.0

KALE TEPE KÖK 31.500 1.770 1.9

KÖPRÜLÜ DM 31.500 1.833 2.0

SANAYİ KÖK 31.500 1.833 2.0

İŞLETME KÖK 31.500 1.833 2.0

- Method: IEEE - X/R is calculated from separate R & X networks.


- HV CB interrupting capability is adjusted based on bus nominal voltage.
- Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current.
- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

* Indicates a device with interrupting duty exceeding the device capability


** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.
+ The prefault voltage exceeds the rated maximum kV limit of the circuit breaker - The rated interrupting kA must be derated.
& Default contact parting time for High Voltage circuit breaker is used .