You are on page 1of 10

SOUTH AFRICA REGION REFERENCE REVISION PAGE

SERVICES H&S 055 6 1 OF 10


HEALTH & SAFETY SYSTEM OPERATIONAL ORIGINATOR H&S MANAGER
PROCEDURE
SA REGION SERVICES SCOPE
DESIGNATION PRINT NAME SIGNATURE DATE

COMPILED BY H&S OFFICER S THERON Original Signed 30/01/2012

REVIEWED BY SNR H&S OFFICER JSD CRONJÉ Original Signed 1/02/2012

AUTHORISED BY H&S MANAGER J SODEN Original Signed 2/02/2012

TABLE OF CONTENTS PAGE ADDENDA PAGE


1. SCOPE 2 ANNEXURE “X” – DEFINITIONS AND ABBREVIATIONS 4-8
ANNEXURE “XX” - REFERENCES 9
RECORD OF AMENDMENTS 10

REVISION DESCRIPTION OF REVISION DATE

6 CHANGES TO SCOPE 31 JAN 2012

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 1 of 10
SCOPE OF THE SOUTH AFRICA REGION SERVICES SAFETY SYSTEM

AngloGold Ashanti, South Africa Region Services is a support service to all operations within AngloGold
Ashanti South Africa Region. Our purpose is to supply a service and advice to our clients with regards to
Occupational Health and Safety issues.

SA Region Services provide a service to employees, contractors and the community members at Vaal River
and West Wits areas to ensure a safe, healthy and productive environment.

Operations within SA Region Services managing their own Safety Management System process include:

 High Density  Properties


 Commercial Services  ATDS
 Engineering Services Workshops  Transport
 Mine Services  Security
 Land Management

Operations not participating in the full Safety Management System, however being guided by South Africa
Region Services Health and Safety Department, include:

 Finance  Internal Auditors


 Human Resources  SA Explorations
 SA Region Communications  Rock Bore Workshop (VR)
 Health and Safety  Engineering Field Services
 Sustainability and Social Development  IT / BCX
 Potchefstroom Office  Project Engineering Services

SA Region Services employ ± 3958 permanent employees and contractors to manage the organisation and
provide a support service to a client base of ± 35 000 employees.

The following areas or facilities are excluded from the Scope of SA Region Services

 Corporate office – 76 Jeppe Street Johannesburg


 All operations (Vaal River and West Wits)
 Metallurgy
 All underutilized assets
 All leased areas

An SA Region Services Safety System (SARSSS) was implemented to:

 eliminate or minimize risks to personnel working for or within the control of SA Region Services as
well as other internal and external interested parties;
 implement, maintain and continually improve the SARSSS
 conform with the OH&S policy;
 conform with OHSAS Standard by conducting internal and external audits

SA Region Services out sources the following activities and services:

 Cleaning and related activities which are executed by appointed contractors.


 Garden Services are provided at West Wits and Vaal River
 IT Service
 Maintenance of assets

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 2 of 10
Specific Services rendered to SA Region Services by the H&S Department.

 Technical advice on Health & Safety Matters


 Assistance with Leading & Lagging indicators
 Legal inspections
 Analysis of Continuous Risk Assessment process
 Incident investigations
 Occupational Hygiene measurements
 Baseline Risk Assessments
 Issue Base Risk Assessments
 Monthly reports
 Legal appointments
 Health & Safety coaching
 Health & Safety meetings
 Legal Appointments
 Coaching

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 3 of 10
Annexure X

DEFINITIONS AND ABBREVIATIONS

DEFINITIONS:

DOCUMENT
Information and its supporting medium (The medium can be paper, magnetic, electronic or optical computer
disc, photograph or master sample, or a combination thereof.)

RECORD
Document stating results achieved or providing evidence of activities performed

CONTROLLED DOCUMENT
Any document that needs to be controlled in terms of its distribution and use, such as the Policy and
documented procedures. These documents are either signed in original ink and/or signed for on a
distribution list. These documents will be signed off after evaluation has been done to determine that they
are adequate for purpose. The document will be signed off by the relevant members as depicted on the
distribution list.
Once copies are printed of the database, they are considered to be “uncontrolled”.

OBSOLETE DOCUMENTS
Documents that have been replaced by later revisions or those that is no longer relevant or valid, and has
been cancelled from the system. These documents will be identified either by crossing them out and writing
obsolete or rubber stamp obsolete document.

UNCONTROLLED DOCUMENTS
Any documents that have not been issued under the circumstances under “controlled documents” are
categorised as uncontrolled. This includes, but may not be limited to:
• Documents that do not need to be controlled such as the monthly safety topic.
• Documents not distributed by the authorised person as per the procedures “authority and
responsibility” table and signed for by the recipient.
• Documents printed from the electronic database. (Watermarked “uncontrolled document”)
• Documents duplicated or photocopied from controlled documents.
• Photocopies of the Occupational Health and Safety policy as issued to the public or other
Interested and Affected Parties

It is not possible to judge from an uncontrolled copy whether it is the latest version. It is the responsibility of
the person holding the documentation to ensure that (s) he has the latest version.

INJURY
Physical harm or damage

OCCUPATIONAL HEALTH AND SAFETY


Conditions and factors that affect, or could affect the health and safety of employees or other workers
(including temporary workers and contractor personnel), visitors, or any other person in the workplace

OH&S MANAGEMENT SYSTEM


Part of an organization’s management system used to develop and implement its OH&S policy and manage
its OH&S risks

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 4 of 10
SEVERITY / CONSEQUENCE
Outcome of an event. There may be one or more consequences from an event. May be expressed
qualitatively or quantitatively may range from positive to negative (Speculative).

FREQUENCY
Occurrence per unit time, (May be expressed qualitatively or quantitatively).

EXPOSURE
How often and for how long employees are exposed to a hazard/s.

LIKELIHOOD
Means the chance of an event occurring.

DUE DILIGENCE
Taking reasonable care to protect the health and safety of all employees. Provide equipment, maintain the
equipment, use equipment as prescribed, provide information relating to the equipment, and provide
competent supervision.

INCIDENT
An undesired event which under slightly different circumstances could result in harm to people. Damage to
property or loss to process or an undesired event that could or does result in a loss.

RISK MATRIX
A Risk index can be determined by plotting likelihood and severity indices on the y and x-axis respectively
and then using them to obtain a risk ranking.

HIRA
Process of recognizing that a hazard exists and defining its characteristics
• H = HAZARD
Anything around us that we can see as well as those energy sources we cannot see e.g. Gas and
radiation that can cause harm
• I = IDENTIFICATION
Identify the significant hazards (Process and recognition)
• R = RISK
Risk imagining (Likelihood and consequence if risk materializes)
• A = ASSESSMENT
Determine the magnitude of the risk if materialized

ROUTINE ACTIVITY
An activity which is performed on a regular basis (day to day)

NON ROUTINE
An activity performed on an adhoc basis

ACCOUNTABILITY
Principle that, individuals, organizations, and the community are responsible for their actions and may be
required to explain them to others.

RESPONSIBLE
Liable to be called to respond to a person for issues to be done.

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 5 of 10
ILL HEALTH
Identifiable adverse physical or mental condition arising from and/or made worse by a work activity and/or
work-related situation.

INTERESTED PARTIES
Person or group, inside or outside the workplace, concerned with or affected by the SARSSS performance.

NONCONFORMITY
Non-fulfilment of a requirement – can be any deviation from:
Relevant work standards, practices, procedures, legal requirements.

SARSSS OBJECTIVES
SARSSS goals, in terms of OHS performance, that SA Region Services sets itself to achieve. Objectives are
quantified wherever practical.

SARSSS PERFORMANCE
Measurable results of SA Region Services management of its risks.
Note: Performance measurement includes measurement the effectiveness of controls.

OHS POLICY
Overall intention and direction which will be followed for the management of health and safety.

RECORD
Document stating results achieved or providing evidence of activities performed

HAZARD
A condition or practice with the potential to cause harm, or exposure to danger. (Immediate Causes,
Substandard Act or Substandard Condition)

RISK ASSESSMENT
Process of evaluating the risk(s) arising from a hazard(s), taking into account the adequacy of any existing
controls, and deciding whether or not the risk(s) is acceptable

PREVENTATIVE ACTION
Action to eliminate the cause of a potential nonconformity or other undesirable potential situation.

CORRECTIVE ACTION
Action taken to rectify a non-conformance or deviation

CONTINUAL IMPROVEMENT
To constantly improve on current Health and Safety standards

PROCEDURE
Specified way to carry out an activity or a process.

RISK ASSESSMENT
Process of evaluating the risk arising from a hazard, taking into account the adequacy of any existing
controls, and deciding whether or not the risk is acceptable.

WORKPLACE
Any physical location in which work related activities are performed under the control of SA Region Services

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 6 of 10
AUDIT
Independent and documented process for obtaining “audit evidence” and evaluating it objectively to
determine the extent to which “audit criteria” are fulfilled.

SAFETY MONTH
Period from the 20th of a particular month up to the 19th of the following month.

EFFORT BASED OBJECTIVES


Objectives set to improve program related issues

EFFECT BASED OBJECTIVES


Objectives set to improve severity or injury rates

MANCOM
Management Committee

EXCO
Executive Committee

SUPERVISOR
Within SA Region Services – One who supervise or has charge and direction of i.e. Foreman, Clerk of
works, Training Officer, Residence Manager, Security Officer etc.

EMPLOYEE
Person working under the control of the organisation and includes contractors.

MANAGEMENT REPRESENTATIVE
A Person appointed in writing ensuring that the OH&S management system is established, implemented
and maintained in accordance with this OHSAS Standard;
and ensuring that reports on the performance of the OH&S management system are presented to top
management for review and used as a basis for improvement of the OH&S management system.

VISITOR
Any person who enters the premises of the mine who is not a full time employee or Contractor paid by the
mine

CONTRACTOR
Any person who perform work for the mine and is paid for his/her service.

ACCEPTABLE RISK
Risk that has been reduced to a level that can be tolerated by the organization having regard to its legal
obligations and its own

HEALTH AND SAFETY COMMITTEE


A committee as required by law M H & S Act Section 25(2)

VERIFICATION
Verification is the act of reviewing, inspecting, testing, etc. to establish and document that a product, service,
or system meets the regulatory, standard, or specification requirements.

VALIDATION
Validation refers to meeting the needs of the intended end-user or customer to
prove the truth or to determine or test the accuracy. Also, validation is the process of checking if something
satisfies a certain criterion.

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 7 of 10
ABBREVIATIONS:

M H & S Act - Mine Health & Safety Act


MA&R - Mineral Act & Regulations
OHASA - Occupational Health and Safety Act
DMR - Department of Mineral Resources
DOL - Department of Labour
SARS - South Africa Region Services
ESW - Engineering Services Workshops
WITW - Wellness in the Workplace
H&S - Health and Safety
LTIFPD - Loss Time Injury Free Production Days
IFPD - Injury Free Production Days
AGAH - AngloGold Ashanti Health
TMM - Trackless Mobile Machinery
COP - Code of Practice
ATDS - AngloGold Ashanti Training and Development Services
CRA - Continuous Risk Assessment
SARSSS - South Africa Region Services Safety System

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 8 of 10
Annexure XX

REFERENCES

• Roles and responsibilities are depicted in each system procedure and updated as and when
required in table format
• OHSAS 18001:2007 (Occupational Health and Assessment Series)
• The Mine Health and Safety Act 29 of 1996
• The Minerals Act 50 of 1991
• Occupational Health and Safety Act (Act 86 of 1993)
• COIDA
• AGA Strategic Objectives
• Implex Legal Register
• ATDS Training Matrix
• AGA RCAT
• Corporate Procedure Directive
• Health and Safety Agreement
• SAR/OESH/P/A/001.01 – AGA Incident reporting
• H&S 004 – Incident investigation
• H&S 006 – Emergency preparedness and response
• H&S 014 – Issue based risk assessment
• H&S 018 – Baseline risk assessment H&S 019 – Control of records
• H&S 023 – Control of documents
• H&S 027 – Competence, training and awareness
• H&S 028 – Continuous risk assessment
• H&S 029 – Communication, participation and consultation
• H&S 030 – Management review
• H&S 031 – Internal audit
• H&S 037 – Management of change
• H&S 055 – SA Region Services Scope
• H&S 058 – Legal and other requirements
• H&S 059 – Performance measurement and monitoring
• H&S 060 – Evaluation of compliance
• H&S 061 – Nonconformity, corrective and preventative action
• H&S 065 – Objectives and programme(s)
• H&S 067 – Resources, roles, responsibility, accountability and authority
• H&S 069 – Operational control
• H&S 070 – Documentation
• H&S 071 – H&S Policy

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 9 of 10
RECORDS OF AMENDMENTS

PROCEDURE DATE OF
CHANGES TO PROCEDURE
REVISION NUMBER APPROVAL

H&S 055 – Revision 2 Total Scope 2 June 2009

H&S 055 – Revision 3 Services rendered by H&S Dept added (P3) 2 Oct 2009
Changed SADS to SARS
Amendments made to included areas (p2)
Legal Appointments and Coaching added to
H&S 055 – Revision 4 specific Services (p3) 18 Oct 2010
Project Engineering Services and Mine
H&S 055 – Revision 5 Services included 6 May 2011
Split between operations managing their own
Safety Management Systems and those who
H&S 055 – Revision 6 are guided by SARS H & S Dept (p2) 19 Jan 2012

(Original, approved copy filed at the H&S Department)


Uncontrolled if printed. Only up-to-date on the intranet.

SA Region Services Scope REVISION EFFECTIVE DATE PRINT DATE PAGE


H&S 055 06 January 2012 3 February 2012 Page 10 of 10

You might also like