Professional Documents
Culture Documents
Dayshift Activities (12-Jan.2018)
Dayshift Activities (12-Jan.2018)
CPF
Site personnel:-
2. Evaporation pond:
1. Reclaiming oil from retention pond by reclaim oil pump P-1602.
2. Reclaiming oil from evaporation pond NO#1 by E. pond pump.
1.4Fula Field
1.4.1 Site Personnel:
Name Company Position
Dayshift Personnel
Abdelrhim Mohamed P.E Field Foreman
Fkhrelden Mohamed P.E Field Operator
Mohamed Hamid P.E Field Operator
Yasir Fathelrhman P.E Field Operator
Nightshift Personnel
Abdelrhman Gmarelden P.E Field Foreman
Salaheldin Gadelrab P.E Field Operator
Fula Field:-
Moga FPF:
1.1 Site Personnel:
1.3.3 Field:
1.3.4 Field personnel:
1. Routine check for all production wells and OGMs has been done.
2. Tested M7-1 and M33-3.
AGR Activities:
Name Company Position
Dayshift Personnel
Abdelmunem Alamin P.E AGR Operator
Night shift
Ehab Abdelftah Khalifa P.E AGR Operator
1. Patrol check for engines, vessels and compressors has been done, monitor & record
its parameters.
2. Unit A (PK-2409A) stopped on Feb.03, 2015 due to compressor 2nd stage
piston damage.
3. Unit B (PK-2409B) running normal.
4. Stopped unit B on Jan.09 for routine maintenance (on going).
Engine No. Running (hrs.) Outlet Pressure (Mpa) Average Flow Rate(m3/h)
A
B 0 0 0
FNE FPF
1Site Personnel:
Name Company Position
Dayshift Personnel
Nightshift Personnel
1. Patrol check for production facilities has been done, monitor & record its
parameters.
2. Drained sedimentation tankTK-8201A & storage tank for 3Hrs.
Tanks Level:
2.0 Field:-
2.1 Field personnel:
Mohammed Alaa P.E Field Operator
Name Company Position
Gorashi Ahmed P.E Field Operator
Dayshift Personnel
Nightshift Personnel
1. Routine check for all production wells and OGMs has been done.
2. Shut in FNE-7 from 08:00 to 14:00 due to low Pump submergence.
3. Shut in FNE-42 from 08:00 to 20:00 due to low Pump submergence.
4. FNE-15 shut-in at 15:00 due to stuffing box serious leakage.
5. Cooperated with BPU services engineer & maintenance staff to repair
rod stuck and. Downhole flushing of FNE-34 (ongoing).
6. Tighten stuffing box for some wells.
7.
3. Sand Traps at OGM-1 & 7cleaned on line & Drain pits reclaimed.
Jake FPF
Site Personnel:-
2. Field:-
2.1 Site personnel:-
Nightshift Personnel
Mohammed Issa P.E Field Operator
Field Activities:-
1. Routine check for all production wells has been done.
2. Continue N2 lifting for JS-15 by (PSNI#2).
3. Continue N2 injection for JS-18 by (PSNI#1).
4. Continue N2 injection for JS-19 by (PSNI#3).
5. Cooperated with Ram company to install Cathodic protection for JS-38 flow
line (ongoing)
3. JAKE AGR:-
3.1 Site Personnel:-
Engine No. Running Status Outlet Pressure (Mpa) Suction (Mpa) Average Rate(m3/hr)
PK7403-A Stopped - - -
PK7403-B Stopped - - -
Total Flow Rate -
KEYI FPF
Site Personnel:-
Well name CP (MPa) TP (MP) FLP(MPa) FLT (C) CUR(A) Freq. (Hz)
K-N-04 1 1.1 1.05 N/A 34 10
2. AGR:
3.1 Site Personnel:
1 Patrol check for engines, vessels and compressors has been done, monitor& record
parameters.
4 Unit A stopped.
Engine No. Running Status Outlet Pressure (Mpa) AV-Flow rate (m3/hr.)
A Stopped - -
B Troubleshooting - -
C Running 7.8 5762
Total Flow rate (m3/hr.) 5762
Remark
Vehicle Quantity Company Job Description Work Time Standby Time Remarks
Vacuum 1 ZPEB Reclaimed oil from retention pond. 2 Hrs
Truck
Vacuum 1 GTS Reclaimed oil from retention pond. 2 Hrs
Truck
HADIDA FPF :-
Site Personnel:-
Dayshift Personnel
Faroug Abuagla P.E Operation Supervisor
Muaz Awad P.E FPF Foreman
Omer Osman P.E CR Operator
Ahmed Ali Obaid P.E Field Operator
Abdalla Omer P.E FPF Operator
Nightshift Personnel
Alamin Awad P.E FPF Foreman
Ahmed Ali P.E FPF Operator
Farah Nasir P.E FPF Operator
Hosam Musa P.E FPF Operator
1.2 Ongoing Operations and Evaluation
1.3 Day shift Activities
FPF:
1. Patrol check for all production facilities has been done, monitor & record the
parameters.
2. Continue draining bottom water from storage tanks.
3. Water injection pump running for 24 hrs.
4. Centrifugal pump P-4501B running for 24 hrs.
5. Screw pump P-4501C stand by.
6. Cooperated with DCS staff to check and repair the oil level transmitter (LIC201A)
of heater treater A.
7. Received 10 m3 of fluid from sufyan EPF vent pit.
8. Clean and cut the dried bushes inside and around FPF (ongoing).
Field:
1. Patrol check for all production wells has been done.
2. Increased frequency of HN02 to 40 Hz at 10:00.
3. Perform the test of pressure switch for HN02.
4. Tighten stuffing box of H-9 well head.
5. Tested H-9.
1. Patrol check has been done, monitor & record the parameter.
2. Cooperated with mechanic staff to change flexible hose air line supply to engine
of mud pump B by metallic tube.
3. Mud pumps- A runing for 7 hrs & B stand by.
Sufyan FPF
Site Personnel:-
Name Company Position
Dayshift Personnel
Mohammed Nasr P.E Operation Supervisor
Mansour Eltoum P.E FPF Foreman
Hassan Abaker P.E FPF Operator
Mohammed Alfatih P.E C.R Operator
Osman
Hosam Alden Ahmed P.E FPF Operator
Nightshift Personnel
Ayman Mohammed P.E FPF Foreman
Asem Fatihalaleem P.E C.R Operator
1.2 Ali Mohamed Ali P.E FPF Operator
Ongoing Operations and Evaluation:
1.3 Day Shift Activities:
FPF:
1. Patrol check for all production facilities have been done, monitor & record the
parameters.
2. Condensate draining of fuel gas scrubber is performed several times.
3. 18m3 of hot water loaded from EPF to well site.
4. Export pump changed over from P-5501B to P-5502.
5. Cooperated with DCS &PSI team to check & repair solenoid valve of dryer B
at instrument air compressor (ongoing).
6. Housekeeping was performed inside EPF.
1.4 Parameters:-