DAY SHIFT ACTIVITY& PERFORMANCE REPORT

FULA CPF, MOGA, FNE, JAKE, KEYI, HADIDA& Sufyan EPF


Date: Jan,12,2018
Report Number: 12,01,2018
Report Prepared By: Ahmed Tajeldin
Report Approved by: Amir Hamad

CPF
Site personnel:-

Name Company Position


Dayshift Personnel
Malik Siddig P.E CPF Supervisor
Abdelrahman Hussein P.E Operation Coordinator
Amir Hamad P.E CPF Foreman
Esmail Elshafie P.E CPF S. Operator
Ahmed Tajeldin P.E CPF C.R Operator
Mutaz Abdalmonim P.E CPF C.R Operator
Khalid Tajeldin P.E CPF Operator
Eltahir Okasha P.E CPF Operator
Ahmed Mohamed Ali P.E CPF Operator
Mohamed Elshami P.E CPF Operator
Nightshift Personnel
Almaki Hamid P.E CPF Foreman
Mohammed Alyas P.E CPF Foreman
Bashir Abdalla P.E CPF C.R Operator
Anwar Mohammed P.E CPF C.R Operator
Siddig Abdelrahman P.E CPF Operator
Hassan Elmogtaba P.E CPF Operator
Ongoing Operations and Evaluation
CPF: Dayshift Activities
1. Patrol check for all production facilities has been done, monitor & record the parameters.
2. Loaded 15m3 oil to GWCSS-1.
3. PS#1 stopped pumping to KRC @ 9:45.
4. Water drained from TK-1202/3, TK-1501/2/3/4/5/6 and TK-1507.
5. Average flow rate to CPF: 186Sm3/hr., PS#1 199Sm3/hr., BV2:118Sm3/hr.

Shipping Tanks level


TK-1507 (mm) TK-1506 (mm) TK-1505 (mm) TK-1504 (mm) TK-1503 (mm) TK-1502 (mm) TK-1501 (mm)

14127 6923 10355 10893 11948 11898 10515


Chemical and Heater Operation Activities:.
1. Routine check for all chemical pumps and heaters has been done.

2. Evaporation pond:
1. Reclaiming oil from retention pond by reclaim oil pump P-1602.
2. Reclaiming oil from evaporation pond NO#1 by E. pond pump.

Star Oil Ongoing Operations:-


1. Metering skid stream (A/B) online
Metering skid and line parameters:

Time Pressure (K Pa) Temperature (C°) Flow rate(m3/h)


1.7 CPF AGR:
06:00 87 36.8 21.060
12:00 96 36.8 20.704
Site Personal
Dayshift Personnel
Name Company Position
Mohamed Hassan P.E AGR Operator
Wala Omer P.E AGR Operator
Nightshift Personnel
Ahmed Ali P.E AGR Operator
Waleed Mohamed P.E AGR Operator
Activities of AGR
1. Patrol check for engines, vessels and compressors have been done, monitor &
record its parameter.
2. Unit B started at 10:00 after fixed DCS problem.
3. Units A, B & C are running normally.
CPF AGR daily running and performance report:
AGR Units Running (hr) Outlet Pressure (Mpa) Flow Rate (m3/hr.)
1409-A 15 6.33 3991
1409-B 5 6.55 3753
1409-C 15 6.34 4771
Natural Gas treatment Package Outlet Pressure (Mpa) Total Flow Rate
1420-A Not lined up - -
1420-B Stopped - -
FNE 4.04 0
Total Outlet Gas Volume (m3)
150195

1.4Fula Field
1.4.1 Site Personnel:
Name Company Position
Dayshift Personnel
Abdelrhim Mohamed P.E Field Foreman
Fkhrelden Mohamed P.E Field Operator
Mohamed Hamid P.E Field Operator
Yasir Fathelrhman P.E Field Operator
Nightshift Personnel
Abdelrhman Gmarelden P.E Field Foreman
Salaheldin Gadelrab P.E Field Operator

Fula Field:-

1. Patrol check has been done normal and carefully.


2. FN-15 shut down due to drive fault from 09:00 to 10:00.
3. Reclaimed oil from drain pit of 7 wells and portable tank near FN-134.
4. Tighten seal stuffing box of 2wells.

Moga FPF:
1.1 Site Personnel:

Name Company Position


Dayshift Personnel
Mohammed Elkhalifa P.E FPF Foreman
Khatim Abdalla P.E FPF Operator
Mohammed Hashim P.E C.R Operator
Elrafie Eltigani P.E FPF Operator
Nightshift Personnel
Moawia Mohammed P.E FPF Foreman
Momen Mohammed P.E C.R Operator
Hassan Eltoum P.E FPF Operator

1.2 Ongoing Operations and Evaluation


1.3 Day Shift Activities
1.3.1 FPF
1. Patrol check for all production facilities has been done, monitor & record the
parameter.
2. Drained FPF sand trap and reclaimed oil by vacuum truck.
3. Reclaimed 20 m3 of oil from retention pit and transferred via transit line to CPF.

Surge tank level: 3.2m.


Average transit line pressure: 0. 40Mpa
Average transit line flow rate: 30m3/h

1.3.3 Field:
1.3.4 Field personnel:

Name Company Position


Dayshift Personnel
Ibrahim Mohamed P.E Field Operator
Alamin Altayib P.E Field Operator
Nightshift Personnel
Abdelkarim Osman P.E Field Operator

1. Routine check for all production wells and OGMs has been done.
2. Tested M7-1 and M33-3.

AGR Activities:
Name Company Position
Dayshift Personnel
Abdelmunem Alamin P.E AGR Operator
Night shift
Ehab Abdelftah Khalifa P.E AGR Operator

1. Patrol check for engines, vessels and compressors has been done, monitor & record
its parameters.
2. Unit A (PK-2409A) stopped on Feb.03, 2015 due to compressor 2nd stage
piston damage.
3. Unit B (PK-2409B) running normal.
4. Stopped unit B on Jan.09 for routine maintenance (on going).

1.3.5 AGR daily running and performance report:

Engine No. Running (hrs.) Outlet Pressure (Mpa) Average Flow Rate(m3/h)
A
B 0 0 0

Total Gas Volume(m3) 0

FNE FPF
1Site Personnel:
Name Company Position
Dayshift Personnel

Mohammed Khidir P.E FPF Foreman

Mohamed Mahjoub P.E CR Operator

Ali Abdalla P.E FPF Operator

Nightshift Personnel

Rashid Mahdi P.E FPF Foreman

Osama Eltahir P.E FPF Operator

Mirghani Belal P.E FPF Operator

1.2 FPF Activities:

1. Patrol check for production facilities has been done, monitor & record its
parameters.
2. Drained sedimentation tankTK-8201A & storage tank for 3Hrs.

Tanks Level:

TK-8201-A TK-8201-B TK-8501


15493 mm 15049 mm 5851mm

2.0 Field:-
2.1 Field personnel:
Mohammed Alaa P.E Field Operator
Name Company Position
Gorashi Ahmed P.E Field Operator

Dayshift Personnel
Nightshift Personnel

Abu Obaida Basheer P.E Field Operator

Nimir Abdalsalam P.E Field Operator

2.2 Field Activities:

1. Routine check for all production wells and OGMs has been done.
2. Shut in FNE-7 from 08:00 to 14:00 due to low Pump submergence.
3. Shut in FNE-42 from 08:00 to 20:00 due to low Pump submergence.
4. FNE-15 shut-in at 15:00 due to stuffing box serious leakage.
5. Cooperated with BPU services engineer & maintenance staff to repair
rod stuck and. Downhole flushing of FNE-34 (ongoing).
6. Tighten stuffing box for some wells.
7.

3.0 Sand Cleaning


3.1 Sand Cleaning Personnel:

Name Company Position


Sand cleaning Personnel

Mohammed Ahmed Bakheet P.E Sand clean Operator

Sami Edris P.E Sand clean Operator

3.2 Sand Clean Activities:

1. Launched 10” formal pig from OGM-1 at 09:00 AM.

2. Flushed OGM-7 trunk line by pumped hot water.

3. Sand Traps at OGM-1 & 7cleaned on line & Drain pits reclaimed.       
                         

Jake FPF
Site Personnel:-

Name Company Position


Dayshift Personnel
Mohammed Operation
P.E
Abdalla Supervisor
Hussien Hassan P.E FPF Foreman
Subhi Amin P.E FPF Operator
Emad Ibrahim P.E C.R Operator
Ezzeldin Hamid P.E FPF Operator
Nightshift Personnel
Mohammed Mahmoud P.E FPF Foreman
Osama Yahia P.E FPF Operator
Mohammed Fawzi P.E FPF Operator

1.2 Ongoing Operations and Evaluation


FPF Activities:-
1. Patrol check for production facilities has been done.
2. Firefighting weekly test done successfully.
3. Cooperated with maintenance team to as following:
 Repair actuator desk of FPF heaters (Ongoing).
4. Average flow rate to FPF 60.27 M³/hr. and to CPF 58.27 M³/hr.
Storage Tank parameter:-.

Tank Number Level (M) Temp (˚C)


TK-7501 7.3 62

2. Field:-
2.1 Site personnel:-

Alwathig Mohammed P.E Field Operator

Nightshift Personnel
Mohammed Issa P.E Field Operator

Field Activities:-
1. Routine check for all production wells has been done.
2. Continue N2 lifting for JS-15 by (PSNI#2).
3. Continue N2 injection for JS-18 by (PSNI#1).
4. Continue N2 injection for JS-19 by (PSNI#3).
5. Cooperated with Ram company to install Cathodic protection for JS-38 flow
line (ongoing)

Wells parameters (HP, MP& N2)


No. TP CP FLP T Choke Open Gas Close Gas Daily Injectio
(Mpa) (Mpa) (Mpa (˚C) Size Injection Injection injectio n Type
) (mm) Total (m3) Total n And
(15:00) (m3) (M3) AGR
(15:00) (HP ,MP
or N2)
JS-1 9.1 N/A 0.83 64 50/50 97647280 97714190 66910 MP
JS-2 1.1 N/A 1.05 52 50 MP
JS-3 1.3 5.1 0.85 70 50 MP
JS-4 7.7 1.2 0.91 65 50 MP
JS-10 N/A N/A 1.25 63 50/50 76445640 76549920 104280 MP
JS-14 1.2 N/A 0.85 73 50
JS-15 1.4 N/A 1.15 60 50 N2
JS-22 8.4 N/A
JS-26 1.5 1.05 0.75 56 50 MP
JS-28 1.5 9 1.1 62 50 MP
JS-35 7.8 0.9 1.1 66 40 30509310 30576000 66690 MP
JS-29 0.95 4.5 0.9 37

3. JAKE AGR:-
3.1 Site Personnel:-

Name Company Position


Dayshift Personnel
Albarra Almubarak P.E AGR Operator
Mohamed Dalil P.E AGR Operator
Nightshift Personnel
Altayeb Ibrahim P.E AGR Operator
Almukashfi Karrar P.E AGR Operator

3.2 Jake M.P AGR Performance Report:-


Activities:-
1. Patrol check for engines, vessels and compressors has been done, monitor &
record its parameter.
2. Fed lube oil for compressor (D)
3. Cooperated with mechanic team to replace the packing seal parts for AGR unit
(B) compressor stages. (Ongoing).
4. Cooperated with mechanic team to repair AGR-C (Ongoing).
5. Units (A & D) running normally.
Engine No. Running Status Outlet Pressure (Mpa) Average Flow Rate(m3/h)
PK-7402-A Running 10.87 6662
PK-7402-B Stopped - -
PK-7402-C Stopped - -
PK-7402-D Running 10.86 7050
Total Flow Rate 13712

3.3 Jake H.P AGR:


Activities:-
1. HP units (A&B) stopped for maintenance due to malfunctions.
2. Handover AGR unit (B) to contractor for 16000hrs (engine) routine maintenance,
(ongoing).

Engine No. Running Status Outlet Pressure (Mpa) Suction (Mpa) Average Rate(m3/hr)
PK7403-A Stopped - - -
PK7403-B Stopped - - -
Total Flow Rate -

4. Reclaim System and retention pond progress:-


1. Level at evaporation pond#1 approximately 75%.
2. Retention Pond oil Content Approximately 65%.

KEYI FPF
Site Personnel:-

Name Company Position


Dayshift Personnel
Sirag Omer P.E FPF Foreman
Saad Abdelazem          P.E FPF Operator
Yousif Ahmed P.E FPF Operator
Nightshift Personnel
Mohammed Mahdi P.E FPF Foreman
Assad Almosalami P.E FPF Operator
Ahmed Hassan P.E FPF Operator
1.1 Ongoing Operations and Evaluation:
1.2 Day Activities:
1. Patrol check for all FPF equipment’s has been done.
2. Continue draining water from Storage Tank TK-6501A&B.
3. Reclaimed oil from retention pond by vacuum truck.
4. Weekly firefighting test has been done.

1.3 .Tanks level:

Tank Number Level (m) Temp. (˚C)


TK-6501-A 10.5 66
1.
TK-6501-B 7.3 56 Field:
2.1. Site
Total Flow rate to CPF (m3/hr.) 30 m3/h
Personnel:

Day shift Personnel


Name Company Position
Faiz Elsidig P.E Field Operator
Night shift Personnel
Name Company Position
2.2. Day
Wail Abbas P.E Field Operator
Activities:
1. Routine check for all wells & OGMs has been done.
2. Checked status of ESDV’s for Gas lifting wells & OGMs.
3. Cooperated with Petro need staff for flow line of K-N-11 welding (ongoing).
4. Cooperated with mechanic staff to connect the flow line to the well head of K-N-11
(ongoing).
5. Cooperated with Petro need staff for manual excavation for K-N-11 flow line
(ongoing).
6. Cooperated with corrosion engineer to locate four lower point of gas injection line of
Keyi OGM-1 for expose.
7. Update the parameters of K-N-04:

Well name CP (MPa) TP (MP) FLP(MPa) FLT (C) CUR(A) Freq. (Hz)
K-N-04 1 1.1 1.05 N/A 34 10

2. AGR:
3.1 Site Personnel:

Name Company Position


Day shift Personnel
Ahmed Hassan P.E AGR Operator
Telal Hussein P.E AGR Operator
Night shift Personnel
Omer Mohamed P.E AGR Operator
3.2 Day Activities:

1 Patrol check for engines, vessels and compressors has been done, monitor& record
parameters.

2 Unit C is running normally.

3 Unit B under maintenance.

4 Unit A stopped.

4.1 Units Performance:

Engine No. Running Status Outlet Pressure (Mpa) AV-Flow rate (m3/hr.)

A Stopped - -
B Troubleshooting - -
C Running 7.8 5762
Total Flow rate (m3/hr.) 5762

Remark

3. Vehicles & Utilities:

Vehicle Quantity Company Job Description Work Time Standby Time Remarks
Vacuum 1 ZPEB Reclaimed oil from retention pond. 2 Hrs
Truck
Vacuum 1 GTS Reclaimed oil from retention pond. 2 Hrs
Truck
HADIDA FPF :-
Site Personnel:-

Name Company Position

Dayshift Personnel
Faroug Abuagla P.E Operation Supervisor
Muaz Awad P.E FPF Foreman
Omer Osman P.E CR Operator
Ahmed Ali Obaid P.E Field Operator
Abdalla Omer P.E FPF Operator

Nightshift Personnel
Alamin Awad P.E FPF Foreman
Ahmed Ali P.E FPF Operator
Farah Nasir P.E FPF Operator
Hosam Musa P.E FPF Operator
1.2 Ongoing Operations and Evaluation
1.3 Day shift Activities
FPF:
1. Patrol check for all production facilities has been done, monitor & record the
parameters.
2. Continue draining bottom water from storage tanks.
3. Water injection pump running for 24 hrs.
4. Centrifugal pump P-4501B running for 24 hrs.
5. Screw pump P-4501C stand by.
6. Cooperated with DCS staff to check and repair the oil level transmitter (LIC201A)
of heater treater A.
7. Received 10 m3 of fluid from sufyan EPF vent pit.
8. Clean and cut the dried bushes inside and around FPF (ongoing).

Storage tank level A:4.38m. B:4.53m.

Transit line pressure 3399Kpa


Average flow rate 80m3/h

Field:
1. Patrol check for all production wells has been done.
2. Increased frequency of HN02 to 40 Hz at 10:00.
3. Perform the test of pressure switch for HN02.
4. Tighten stuffing box of H-9 well head.
5. Tested H-9.

Mud Pump Activity

1. Patrol check has been done, monitor & record the parameter.
2. Cooperated with mechanic staff to change flexible hose air line supply to engine
of mud pump B by metallic tube.
3. Mud pumps- A runing for 7 hrs & B stand by.

Sufyan FPF
Site Personnel:-
Name Company Position
Dayshift Personnel
Mohammed Nasr P.E Operation Supervisor
Mansour Eltoum P.E FPF Foreman
Hassan Abaker P.E FPF Operator
Mohammed Alfatih P.E C.R Operator
Osman
Hosam Alden Ahmed P.E FPF Operator
Nightshift Personnel
Ayman Mohammed P.E FPF Foreman
Asem Fatihalaleem P.E C.R Operator
1.2 Ali Mohamed Ali P.E FPF Operator
Ongoing Operations and Evaluation:
1.3 Day Shift Activities:
FPF:

1. Patrol check for all production facilities have been done, monitor & record the
parameters.
2. Condensate draining of fuel gas scrubber is performed several times.
3. 18m3 of hot water loaded from EPF to well site.
4. Export pump changed over from P-5501B to P-5502.
5. Cooperated with DCS &PSI team to check & repair solenoid valve of dryer B
at instrument air compressor (ongoing).
6. Housekeeping was performed inside EPF.

1.4 Parameters:-

Storage tank level A:5.0m B: 5.0m


Transit line pressure 2542Kpa
Transit line temperature 71°C
Average flow rate 11.8m3/h
2.0 Field:
2.1 Field personnel:

Name Company Position


Dayshift Personnel

Omer Himadan P.E Field


Operator
2.2 Mohammed Bashir Khalid P.E Field Activities:
Operator
1. Routine
check for all production wells have been done.
2. Sufyan-W6 flow line flushed by hot water.
3. Suf-N4 casing head pressure,released.
4. Cooperate with commissioning team of OGM-2 test separator.
5. Cooperated with electrician& mechanic staff to detect area of Sufyan-W7
preparing for rig.
6. Final site grading inside at OGM-3 (ongoing).
7. Updated parameters for all OGM-1 wells.
8. OGM-2 singal screw transfer pump running normal in auto position
(under observation).
9. OGM-3 singal screw transfer pump running normal in auto position
(under observation).
10.Cooperate with RAM CO to repair the problems of OGM-2&3 test
separator (ongoing).
Transfer Pump parameters OGM-2 OGM-3 OGM-4
Suction Pressure 0.655 Mpa 0.892 Mpa 1.39Mpa
Discharge pressure 2.59Mpa 2.28Mpa 2.54 Mpa
Differential Pressure (DP) N/A - 0.01Mpa
Temp. 36°C 28°C 46°C
Set point 0.80 Mpa 0.9 Mpa 1.4 Mpa
Freq. 10 Hz 13 Hz 24.7Hz