Professional Documents
Culture Documents
1.0 CPF
1. 1Site personnel:-
Evaporation pond:
1. Reclaiming oil from retention ponds by reclaim oil pump.
2. Reclaiming oil from evaporation pond#1 by vacuum trucks.
SHOPC Ongoing Operations:-
Temperature
Time Pressure (K Pa) Flow rate(m3/h)
(C°)
06:00 87 35.3 11.6
12:00 78 34.3 11.6
CPF AGR:
Site Personnel:
Dayshift Personnel
Name Company Position
Ahmed Ali P.E AGR Operator
Ahmed Hassan P.E AGR Operator
Nightshift Personnel
Mohamed Hassan Jummah P.E AGR Operator
Activities of AGR
1. Patrol check for engines, vessels and compressors have been done, monitor & record its parameter.
2. Units B running normally, unit C not standby.
CPF AGR daily running and performance report:
AGR Units Running (Hrs.) Outlet Pressure (Mpa) Flow Rate (m³/hr.)
1409-A 15
5.09 3818
Fula 1409-B 15 5.10 4469
field:
1409-C 0 0 0
Natural Gas treatment Package Outlet Pressure (Mpa) Total Flow Rate
1420-A Not lined up - -
1420-B Stopped
- -
FNE 5.07 -
Production well Landing Pressure( Mpa)
FW-4 0.7
Total Outlet Gas Volume (m³)
124309
Site Personnel:
1.3.3 Field:
1.3.4 Field personnel:
1. Routine check for all production wells and OGMs has been done.
2. Tested M10.
3. Restarted M26-16 at 09:00 after reconnected pressure switch cable.
AGR Activities:
Name Company Position
Dayshift Personnel
Omer Mohiad P.E AGR operator
Night shift
1. Patrol check for engines, vessels and compressors has been done.
2. Unit (PK-2409A) Tripped on Dec.19.2018 due to 3 rd stage damage in crosshead and
crosshead shaft.
3. Unit (PK-2409B) Stopped on Jun.20.2020 to be as standby.
Engine No. Running (hrs.) Outlet Pressure (Mpa) Average Flow Rate(m3/h)
A
B
Total Gas Volume(m3)
Rashid
Name Mahadi P.E
Company FPF Foreman
Position
Nazar Mohammed P.E FPF Operator
Dayshift Personnel
Fadlalla Ahmed P.E FPF Operator
Nightshift Personnel
2. 10” formal pigs has been received from OGM-01 , sand approximately about
5Kg .
³
Av.Oil Flow Rate(M /H) To FPF To CPF
35.18 38.93
2. Field: -
2.1 Site Personnel:-
Nightshift Personnel
Ahmed Imam Alaalim
P.E Field Operator
Field Activities:-
1. Routine check for all production wells has been done.
2. Stopped gas supply to JS-4 at 4:30 due to lack of gas.
JAKE AGR:-
3.1 Site Personnel:
Activities:-
1. Patrol check for engines, vessels and compressors has been done, monitor & record its parameter.
2. Tripped unit B due to DNFT at 4:30.
3. Cooperated with maintenance team to fix DNFT of unit B (Ongoing).
4. Cooperated with maintenance team to repair scrubber auto drain in unit C (Ongoing).
5. AGR unit (A) is running normally.
Engine No. Running Status Outlet Pressure (Mpa) Average Flow Rate(m3/h)
PK-7402-A Running 9.9 6500
PK-7402-B Stopped
PK-7402-C Stopped - -
PK-7402-D Stopped - -
Total Flow Rate 6500
Engine No. Running Status Outlet Pressure (Mpa) Suction (Mpa) Average Rate(m3/hr)
PK7403-A Standby - - -
PK7403-B Standby - - -
Total Flow Rate
1. Routine check for all wells & OGMs has been done.
2. Cooperated with maintenance staff to routine maintenance for K-26.
2. FSF:-
2.1 Site Personnel:-
Dayshift Personnel
Abdallah Omer P.E Field Operator
Nightshift Personnel
Bilal Ali Altahir P.E Field Operator
2.3 Field:
1. Patrol check for all production wells has been done.
2. Well test HN-1.
3. H5-2 shut down for 2hr due to changed motor belt by mechanic staff.
4. Co-operated with mechanic staff to changed motor belt of H5-2.
1. Routine check for all production wells and OGMs has been done.
2. Updated parameters for OGM-2 wells.
Temp.(°C) 38 42 44
Set point (Mpa) M M M
Freq. (Hz) 10 10 21