DAY NIGHT ACTIVITY& PERFORMANCE REPORT

FULA CPF, MOGA, FNE, JAKE, KEYI, HADIDA& Sufyan EPF


Date: Jul,17,2020
Report Number: 17072020
Report Prepared By: Hassan M.Almojtaba
Report Approved by: Almaki Hammed

1.0 CPF
1. 1Site personnel:-

Name Company Position


Dayshift Personnel
Luai Gamar Eldeen PE CPF Operation Supervisor
Elnoor Mohamed PE Operation coordinator
Almaki Hammed PE CPF Foreman
Bashir Abdalla PE CPF S Operator
Hassan Abdo Khalil PE CPF CR Operator
Hassan M.Almojtaba PE CPF CR Operator
Siddig Abdelrhman PE CPF Operator
Nightshift Personnel
Amir Hammad PE CPF Foreman
Yassir Ahmed PE CPF S Operator
Osman Adil PE CPF CR Operator
Mohamed Elshami PE CPF CR Operator
Anwar Mohamed PE CPF Operator

Ongoing Operations and Evaluation:


CPF: Daily Activities:
1. Patrol check for all production facilities has been done, monitor & record the parameters.
2. Cooperated with DCS staff to repair & calibrate TK-1507 level transmitter (ongoing).
3. Cooperated with VELOSI staff to check & evaluate pipes inside CPF at PK-1423A/B & TK-1506/7
area (ongoing).
4. Water drained from TK-1202/3, TK-1501/2/3/4/5/6 and TK-1507.
5. Average flow rate to CPF: 134 Sm3/hr., PS#1: 188 Sm3/hr., BV2: 109 Sm3/hr.

Shipping Tanks level:


TK-1507 (mm) TK-1506(mm) TK-1505 (mm) TK-1504(mm) TK-1503 (mm) TK-1502 (mm) TK-1501 (mm)
3968 2711 2887 2307 1815 2857 2254

Chemical and Heater Operation Activities:-


1. Routine check for all chemical pumps and heaters has been done.
2. Chemical feed:

Evaporation pond:
1. Reclaiming oil from retention ponds by reclaim oil pump.
2. Reclaiming oil from evaporation pond#1 by vacuum trucks.
SHOPC Ongoing Operations:-
Temperature
Time Pressure (K Pa) Flow rate(m3/h)
(C°)
06:00 87 35.3 11.6
12:00 78 34.3 11.6

CPF AGR:
Site Personnel:

Dayshift Personnel
Name Company Position
Ahmed Ali P.E AGR Operator
Ahmed Hassan P.E AGR Operator
Nightshift Personnel
Mohamed Hassan Jummah P.E AGR Operator

Activities of AGR
1. Patrol check for engines, vessels and compressors have been done, monitor & record its parameter.
2. Units B running normally, unit C not standby.
CPF AGR daily running and performance report:

AGR Units Running (Hrs.) Outlet Pressure (Mpa) Flow Rate (m³/hr.)
1409-A 15
5.09 3818
Fula 1409-B 15 5.10 4469
field:
1409-C 0 0 0
Natural Gas treatment Package Outlet Pressure (Mpa) Total Flow Rate
1420-A Not lined up - -
1420-B Stopped
- -
FNE 5.07 -
Production well Landing Pressure( Mpa)
FW-4 0.7
Total Outlet Gas Volume (m³)
124309
Site Personnel:

Name Company Position


Dayshift Personnel
Hamdelneil G.alla P. E Field Foreman
Elsharif Salah P. E Field Operator
Mohamed Hamid P. E Field Operator
Nightshift Personnel

Fakhry Elshiek P. E Field Foreman


Ibrahim Osman P. E Field Operator
Fula Field: -

1. Patrol check has been done normal and carefully.


2. FN-65 shut down due to belt broken from 08:30 to 15:30.
3. FC-H1 shut down due to drive fault from 08:00 to 09:00 and from 14:00 to 15:00.
4. F-03 shut down due to drive fault from 13:00 to 14:00.
5. FN-41 shut down due to drive fault from 14:00 to 15:00.
6. Restarted FN-139 after change motor support at 16:00.

2.0 Moga FPF


2.1 Site
Name Company Position
Personnel: Dayshift Personnel
Elhiraika Khatim P.E Moga & FNE Supervisor
Mohammed Elkhalifa P.E FPF Foreman
Alaa Mustafa P.E FPF Operator
Salih Awad P.E CR Operator
Nightshift Personnel
Ashraf Mohammed P.E FPF Foreman
Omer Mohiad P.E FP Operator
Mohamed Yousif P.E CR Operator
1.2 Ongoing Operations and Evaluation
1.3 Day Shift Activities
1.3.1 FPF
1. Patrol check for all production facilities has been done, monitor & record the parameter.
2. Cooperated with Petro-need Co to construct the new LC tank (ongoing).

Surge tank level: 3.8m.


Average transit line pressure: 0.36Mpa.
Average transit line flow rate: 54m3/h.

1.3.3 Field:
1.3.4 Field personnel:

Name Company Position


Dayshift Personnel
Nasr Elsir P.E Field Operator
Mohammed Freed P.E Field Operator
Nightshift Personnel
Mohammed Arafat P.E Field Operator

1. Routine check for all production wells and OGMs has been done.
2. Tested M10.
3. Restarted M26-16 at 09:00 after reconnected pressure switch cable.

AGR Activities:
Name Company Position
Dayshift Personnel
Omer Mohiad P.E AGR operator
Night shift
1. Patrol check for engines, vessels and compressors has been done.
2. Unit (PK-2409A) Tripped on Dec.19.2018 due to 3 rd stage damage in crosshead and
crosshead shaft.
3. Unit (PK-2409B) Stopped on Jun.20.2020 to be as standby.

AGR daily running and performance report:

Engine No. Running (hrs.) Outlet Pressure (Mpa) Average Flow Rate(m3/h)

A
B
Total Gas Volume(m3)

3.0 FNE FPF


1.1 3.1 FPF Personnel:

Rashid
Name Mahadi P.E
Company FPF Foreman
Position
Nazar Mohammed P.E FPF Operator
Dayshift Personnel
Fadlalla Ahmed P.E FPF Operator

Nightshift Personnel

Neyazy Abdelmuniem P.E FPF Act/Foreman


Mohammed Abbas P.E FPF Operator
1. FPF:
1.2 Activities:
1. Patrol check for production facilities has been done, monitor & record its
parameters.
2. Drained bottom water of Storage tank TK-8501.
3. Cooperated with electrician & DCS staff to fix Export pump P-8501C problem.(On
going)

Tanks Level at 15:20


TK-8201-A TK-8201-B TK-8601-A TK-8601-B TK-8501

15.607m 12.032m 8.559m 8.737m 4.366m


Export pump flow rate 22m3/h
2.0 Field:
2.1 Field personnel:

Abuobaida Bashir P.E Field Operator


Name Company Position
Abdallah Alnoor P.E Field Operator
Dayshift Personnel

Nimir Abd Elsalam Nightshift


P.EPersonnel Field Operator

2.2 Field Activities:-


1. Routine check for all production wells and OGMs has been done.
2. FNE-06 shutdown for two hours due to power fault.
3. Cooperated with mechanic staff to tighten motor belt of FNE-(5 &13).
4. Tightened stuffing box for many wells.

3.0 Sand Cleaning:


3.1 Sand Cleaning Personnel:
Name Company Position
Dayshift Personnel
Ahmed Kalashob P.E S.C Operator
3.2 Sand
Cleaning Activities:
1. Weekly 12” formal pig has been launched from FNE-FPF to CPF at 09:00
am.

2. 10” formal pigs has been received from OGM-01 , sand approximately about
5Kg .

3.  Sand Trap at FPF cleaned on line & Drain pit reclaimed.

4.0 Jake FPF


4.1 Site Personnel:-

Name Company Position


Dayshift Personnel
Hisham Awad P.E Operation Supv.
Yousif Abdelkhalig P.E FPF Foreman
Mutaz Ezzeldin P.E C.R Operator
Emad Eltigani P.E FPF Operator
Nightshift Personnel
Rahama Mohamed P.E FPF Foreman
Subhi Amin P.E FPF Operator
1.2 Ongoing Operations and Evaluation
FPF Activities:-

1. Patrol check for production facilities has been done.


2. Perform weekly firefighting pumps test.
3. Continue skimming oil from PWTs.

³
Av.Oil Flow Rate(M /H) To FPF To CPF

35.18 38.93

Storage Tank Parameter:-

Tank Number Level (M) Temp (˚C)


TK-7501 7.6 61

2. Field: -
2.1 Site Personnel:-

Name Company Position


Dayshift Personnel

Abubaker Mahjoub P.E Field Operator

Nightshift Personnel
Ahmed Imam Alaalim
P.E Field Operator

Field Activities:-
1. Routine check for all production wells has been done.
2. Stopped gas supply to JS-4 at 4:30 due to lack of gas.

JAKE AGR:-
3.1 Site Personnel:

Name Company Position


Dayshift Personnel
Mohammed Dalil P.E AGR Operator
Awad Mohamed P.E AGR Operator
Eltayeb Ibrahim P.E AGR Operator
Nightshift Personnel
Mohamed Fawzi P.E AGR Operator
Hatim Mohamed P.E AGR Operator
a. Jake M.P AGR
b. Performance Report:-

Activities:-
1. Patrol check for engines, vessels and compressors has been done, monitor & record its parameter.
2. Tripped unit B due to DNFT at 4:30.
3. Cooperated with maintenance team to fix DNFT of unit B (Ongoing).
4. Cooperated with maintenance team to repair scrubber auto drain in unit C (Ongoing).
5. AGR unit (A) is running normally.

Engine No. Running Status Outlet Pressure (Mpa) Average Flow Rate(m3/h)
PK-7402-A Running 9.9 6500
PK-7402-B Stopped
PK-7402-C Stopped - -
PK-7402-D Stopped - -
Total Flow Rate 6500

3.3 Jake H.P AGR:-


Activities:-
1. HP units (A & B) (Standby).

Engine No. Running Status Outlet Pressure (Mpa) Suction (Mpa) Average Rate(m3/hr)
PK7403-A Standby - - -
PK7403-B Standby - - -
Total Flow Rate

4. Reclaim System and retention pond progress:-


1. Retention Pond contains approximately 3.0% oil.
2. Level of evaporation pond#1 approximately 50%.
6. Vehicles utilized:-

5.0 KEYI FPF


1.1 5.1 Site Personnel:
Name Company Position
Day Shift Personnel
Mohamed Osman P.E FPF Foreman
Omer Mohammed P.E FPF Operator
Samih Abdalla Talha P.E FPF Operator
Mohamed Sidahmed P.E FPF Operator
Night Shift Personnel
Yousif Ahmed P.E FPF Operator
Abdelaziz Elgoni P.E FPF Operator
1.2 Ongoing Operations and Evaluation:
1.3 Day Activities:
1. Patrol check for all FPF equipment’s has been done.
2. Continue draining water from storage tanks TK-6501A&B.
3. Reclaimed oil form evaporation pond by vacuum truck.
4. Weekly firefighting system test.

1.4 Tanks Levels:

Tank Number Tank Level (m) Tank Temperature (˚C)


TK-6501-A 11.2 60
TK-6501-B 7.0 53
Total Flow rate to CPF (m3/hr.) 22 m3/hr.
2. Field:
2.1 Site Personnel:

Name Company Position


Day Shift Personnel
Muntasir Mohammed P.E Field Operator
Waheeb Hassan P.E Field Operator
Night Shift Personnel
Ahmed Galal P.E Field Operator

2.2 Field Activity:

1. Routine check for all wells & OGMs has been done.
2. Cooperated with maintenance staff to routine maintenance for K-26.

Vehicle company job description work hours remarks

Vacuum truck GTS Reclaim oil from Eva. pond 2 Hr.


Tanker GTS Reclaim oil from Eva. pond 2 Hr.

6.0 Hadida FPF


6.1 Site Personnel:

Name Company Position


Dayshift Personnel
Faroug Abuagla P.E Operation Supervisor
Muaz Awad P.E FPF Foreman
Ibrahim Algaily P.E CR Operator
Abdelrahman Hamad P.E FPF Operator
Nightshift Personnel
Ammar Mohamed P.E FPF Foreman
Ibrahim Gaber P.E CR Operator
Omer Osman P.E FPF Operator
1. 1.2 Ongoing Operations and Evaluation:
1.3 Day shift Activities FPF:
2. Patrol check for all production facilities has been done, monitor & record the parameters.
3. Water injection pump standby.
4. Exports pump: P-4501-D running for 24 hrs.
5. Co-operated with DCS staff to check and repair water level transmeter LIC-103A of
production separator (onging).
6. Chenged over of air compressor from A to B.
7. Adjested the chock size of chemical injection pump.
8. Shut-in FPF five minutes due to power plant change load engine from diesel generator to
gas.
Storage tank level A: 3.47m B: 3.345m

Transit line pressure 2224Kpa


Average flow rate 68m3/h

2. FSF:-
2.1 Site Personnel:-

Dayshift Personnel
Abdallah Omer P.E Field Operator
Nightshift Personnel
Bilal Ali Altahir P.E Field Operator

2.3 Field:
1. Patrol check for all production wells has been done.
2. Well test HN-1.
3. H5-2 shut down for 2hr due to changed motor belt by mechanic staff.
4. Co-operated with mechanic staff to changed motor belt of H5-2.

3. Mud Pump Activity:


1. Patrol check has been done.
2. Mud pumps:- A & B standby.

7.0 Sufyan FPF


7.1 Site Personnel:
Name Company Position
Dayshift Personnel
Mohammed Nasur P.E Operation Supervisor
Abdelmohsen Abdalla P.E Operation Foreman
Hosam Aldin Ahmed P.E C.R Operator
Khalid Abdalbagi P.E FPF Operator
Hassan Ibrahim P.E FPF Operator
Nightshift Personnel
Elhadi Noureldin P.E A/Operation
Foreman
Mohammed Alfatih P.E C.R Operator
1.2 Osman Ongoing
Asem Fatihalaleem P.E FPF Operator Operations
and Evaluation:-
1.3 Day Shift Activities:-
FPF:
1. Patrol check for all production facilities have been done, monitor & record the
parameters.
2. Nineteen outdoor lights inside the EPF out of service need to repair, and WR sent.
3. Daily top-up 1.639m³ of diesel to power plant day tank.
4. Fuel gas scrubber’s condensate drained.
1.4 Parameters:

Storage tank level A:4.6m B:4.6m


Transit line pressure 2772Kpa
Transit line temperature 69°C
Average flow rate 4.3m3/h
2.0 Field:
2.1 Field personnel:

Name Company Position


Dayshift Personnel

Omer Himadan P.E Field Operator


Mohammed Bashir Khalid P.E Field Operator
2.2 Activities:

1. Routine check for all production wells and OGMs has been done.
2. Updated parameters for OGM-2 wells.

2.3 OGM Pumps Parameters:-


Transfer Pump OGM-2 OGM-3 OGM-4 Remark
Suction Pressure (Mpa) 0.84 0.83 1.24
Discharge pressure (Mpa) 2.85 2.38 2.62

Differential Pressure (DP)(Mpa) N/A N/A N/A

Temp.(°C) 38 42 44
Set point (Mpa) M M M

Freq. (Hz) 10 10 21