Professional Documents
Culture Documents
CPF
Site personnel:-
2. Evaporation pond:
1. Reclaiming oil from retention pond by reclaim oil pump P-1602.
2. Reclaiming oil from evaporation pond NO#1 by E. pond pump.
Star Oil Ongoing Operations:-
1. Metering skid stream (A/B) online
Metering skid and line parameters:
1.4Fula Field
1.4.1 Site Personnel:
Moga FPF:
1.1 Site Personnel:
1.3.1 FPF
1. Patrol check for all production facilities has been done, monitor & record the
parameter.
2. Received two load of oil from M33-1 (Rig-2077).
3. Housekeeping inside FPF.
1.3.3 Field:
1.3.4 Field personnel:
1. Routine check for all production wells and OGMs has been done.
2. Tested M10.
3. Cooperated with maintenance team to solve the malfunction problem of OGM06
test separator
Level transmitter LI-20202 (ongoing).
4. Drained sand traps of OGM 1, 2 &4 and reclaimed oil by vacuum to CPF.
AGR Activities:
Name Company Position
Dayshift Personnel
Abdelmunem Alamin P.E AGR Operator
Night shift
Ehab Abdelftah Khalifa P.E AGR Operator
1. Patrol check for engines, vessels and compressors has been done, monitor & record
its parameters.
2. Unit A (PK-2409A) stopped on Feb.03, 2015 due to compressor 2nd stage
piston damage.
3. Unit B (PK-2409B) running normal.
Engine No. Running (hrs.) Outlet Pressure (Mpa) Average Flow Rate(m3/h)
A
B 15 6.99 2182
FNE FPF
1Site Personnel:
Name Company Position
Dayshift Personnel
Nightshift Personnel
1. Patrol check for production facilities has been done, monitor & record its
parameters.
2. Drained sedimentation tank TK-8201-A & storage tank for 2Hrs.
3. Cooperated with maintenance team to Fabricate and Install Overflow pipe
Between Evaporation Ponds No-3 and No-4 (finished).
4. Housekeeping inside FPF.
Tanks Level:
2.0 Field:-
2.1 Field personnel:
Dayshift Personnel
Nightshift Personnel
1. Routine check for all production wells and OGMs has been done.
2. Shut in FNE-7 from 08:00 to 14:00 due to low Pump submergence.
3. Shut in FNE-42 from 08:00 to 20:00 due to low Pump submergence.
4. FNE-82 shut-in at 08:00 due to adjust aliment & change stuffing box
seal.
5. Cooperated with DCS staff to disconnect FNE-14 pressure switch cable
for rig.
6. Tighten stuffing box for some wells.
7. Updated parameters for some wells.
Jake FPF
Site Personnel:-
2. Field:-
2.1 Site personnel:-
Field Activities:-
1. Routine check for all production wells has been done.
Abubaker Mahjoub P.E Field Operator
Nightshift Personnel
Emad Ibrahim P.E Field Operator
3. JAKE AGR:-
3.1 Site Personnel:-
Engine No. Running Status Outlet Pressure (Mpa) Average Flow Rate(m3/h)
PK-7402-A Running 10.96 5664
PK-7402-B Stopped - -
PK-7402-C Running 10.99 8426
PK-7402-D Running 10.95 3810
Total Flow Rate 17890
3.3 Jake
Activities:-
1. HP units (A&B) stopped for maintenance due to malfunctions.
2. Handover AGR unit (B) to contractor for 16000hrs (engine) routine maintenance,
(ongoing).
Engine No. Running Status Outlet Pressure (Mpa) Suction (Mpa) Average Rate(m3/hr)
PK7403-A Stopped - - -
PK7403-B Stopped - - -
Total Flow Rate -
KEYI FPF
1.1Site Personnel:-
1.2
Name Company Position
1.3 Dayshift Personnel
Sirag Omer P.E FPF Foreman
Saad Abdelazem P.E FPF Operator
Ahmed Hassan P.E FPF Operator
Yousif Ahmed P.E FPF Operator
Nightshift Personnel
Mohammed Mahdi P.E FPF Foreman
Assad Almosalami P.E FPF Operator
Mozamel Yousif P.E FPF Operator
Ongoing Operations and Evaluation:
1.4 Day Activities:
1. Patrol check for all FPF equipment’s has been done.
2. Continue draining water from Storage Tank TK-6501A &B.
3. Reclaimed oil from retention pond by vacuum truck.
1. Routine check for all wells & OGMs has been done.
2. Checked status of ESDV’s for Gas lifting wells & OGMs.
3. Hydro test & flush for K-N-4 flow line successfully done.
4. Increased the freq. K-23 gradually from 30 Hz to 40 Hz at 10:30.
5. Cooperated with DCS staff to replace the flow line pressure gauge s of K-23 & K-20.
6. Cooperated with Petro need staff to weld the flow line of K-N-11 (ongoing).
7. Cooperated with Viacom staff to make hole for K-N-4 VSD.
8. Cooperated with DCS staff to fix the problem of OGM-1 test separator micro motion.
9. Tested one well.
2. AGR:
3.1 Site Personnel:
1 Patrol check for engines, vessels and compressors has been done, monitor& record
parameters.
5 Unit A stopped.
A Stopped - -
B Standby - -
C Running 7.8 5474
Total Flow rate (m3/hr.) 5474
Remark
Vehicle Quantity Company Job Description Work Time Standby Time Remarks
Vacuum 2 ZPEB Reclaimed oil from retention pond. 2 Hrs
Truck
Water 1 ZPEB Hydro test & flush for K-N-4 flow line. 3 Hrs
tanker
Pump truck 1 ZPEB Hydro test & flush for K-N-4 flow line. 4 Hrs
1.6HADIDA FPF :-
Site Personnel:-
Dayshift Personnel
Musa Abu Makeen P.E Operation Supervisor
Muaz Awad P.E FPF Foreman
Omer Osman P.E CR Operator
Ahmed Ali Obaid P.E Field Operator
Abdalla Omer P.E FPF Operator
Nightshift Personnel
Alamin Awad P.E FPF Foreman
Ahmed Ali P.E FPF Operator
Farah Nasir P.E FPF Operator
Hosam Musa P.E FPF Operator
Field:
1. Patrol check for all production wells has been done.
2. Retested H-9.
Mud Pump Activity
1. Patrol check has been done, monitor & record the parameter.
2. Mud pumps- A runing for 5 hrs & B stand by.
3. Cooperated with mechanic staff to replace the water supply hose for mud pump
A.
Sufyan FPF
Site Personnel:-
1. Patrol check for all production facilities have been done, monitor & record the
parameters.
2. Drain the condensate from fuel gas scrubber (continuously).
3. Cooperated with DCS &PSI team to check & repair solenoid valve of dryer B
at instrument air compressor (ongoing).
4. 18m3 of hot water loaded from EPF to well site.
1.4 Parameters:-
2.0 Field:
2.1 Field personnel: