DAY SHIFT ACTIVITY& PERFORMANCE REPORT

FULA CPF, MOGA, FNE, JAKE, KEYI, HADIDA& Sufyan EPF


Date: Jan,09,2018
Report Number: 09,01,2018
Report Prepared By: Moutaz Abdalmonim
Report Approved by: Amir Hamad

CPF
Site personnel:-

Name Company Position


Dayshift Personnel
Malik Siddig P.E CPF Supervisor
Abdelrahman Hussein P.E Operation Coordinator
Amir Hamad P.E CPF Foreman
Esmail Elshafie P.E CPF S. Operator
Mutaz Abdalmonim P.E CPF C.R Operator
Ahmed Tajeldin P.E CPF C.R Operator
Khalid Tajeldin P.E CPF Operator
Eltahir Okasha P.E CPF Operator
Ahmed Mohamed Ali P.E CPF Operator
Mohamed Elshami P.E CPF Operator
Nightshift Personnel
Almaki Hamid P.E CPF Foreman
Bashir Abdalla P.E CPF C.R Operator
Anwar Mohammed P.E CPF C.R Operator
Siddig Abdelrahman P.E CPF Operator
Hassan Elmogtaba P.E CPF Operator
Ongoing Operations and Evaluation
CPF: Dayshift Activities
1. Patrol check for all production facilities has been done, monitor & record the parameters.
2. Water drained from TK-1202/3, TK-1501/2/3/4/5/6 and TK-1507.
3. Average flow rate to CPF: 240Sm3/hr., PS#1 255Sm3/hr., BV2:118Sm3/hr.

Shipping Tanks level


TK-1507 (mm) TK-1506 (mm) TK-1505 (mm) TK-1504 (mm) TK-1503 (mm) TK-1502 (mm) TK-1501 (mm)

14127 6900 10134 11452 11604 11937 10772


Chemical and Heater Operation Activities:.
1. Routine check for all chemical pumps and heaters has been done.

2. Evaporation pond:
1. Reclaiming oil from retention pond by reclaim oil pump P-1602.
2. Reclaiming oil from evaporation pond NO#1 by E. pond pump.
Star Oil Ongoing Operations:-
1. Metering skid stream (A/B) online
Metering skid and line parameters:

Time Pressure (K Pa) Temperature (C°) Flow rate(m3/h)


06:00 80 37.0 20.557
12:00 106 37.1 20.709
1.7 CPF AGR:
Site Personal
Dayshift Personnel
Name Company Position
Mohamed Hassan P.E AGR Operator
Wala Omer P.E AGR Operator
Nightshift Personnel
Ahmed Ali P.E AGR Operator
Waleed Mohamed P.E AGR Operator
Activities of AGR
1. Patrol check for engines, vessels and compressors have been done, monitor &
record its parameter.
2. Stopped unit C at 9:00 due cooler motor fault and back to normal at 15:00.
3. Units A, B& C are running normally.
CPF AGR daily running and performance report:
AGR Units Running (hr) Outlet Pressure (Mpa) Flow Rate (m3/hr.)
1409-A 15 7.17 3746
1409-B 15 7.18 3727
1409-C 11 7.44 4105
Natural Gas treatment Package Outlet Pressure (Mpa) Total Flow Rate
1420-A Not lined up - -
1420-B Stopped - -
FNE 4.04 0
Total Outlet Gas Volume (m3)
173,651

1.4Fula Field
1.4.1 Site Personnel:

Name Company Position


Dayshift Personnel
Abdelrhim Mohamed P.E Field Foreman
Fkhrelden Mohamed P.E Field Operator
Mohamed Hamid P.E Field Operator
Yasir Fathelrhman P.E Field Operator
Nightshift Personnel
Abdelrhman Gmarelden P.E Field Foreman
Salaheldin Gadelrab P.E Field Operator
Fula Field:-

1. Patrol check has been done normal and carefully.


2. FN-142 shut down due to drive fault from 08:00 to 09:00.
3. Cooperated with mechanic team to feed lobe oil for FN-46.
4. Tighten seal stuffing box of FC-18.

Moga FPF:
1.1 Site Personnel:

Name Company Position


Dayshift Personnel
Moawia Mohammed P.E FPF Foreman
Hassan Eltoum P.E C.R Operator
Khatim Abdalla P.E FPF Operator
Alaa Mustafa P.E FPF Operator
Nightshift Personnel
Mohammed Elkhalifa P.E FPF Foreman
Momen Mohammed P.E C.R Operator
Elrafie Eltigani P.E FPF Operator

1.2 Ongoing Operations and Evaluation

1.3 Day Shift Activities

1.3.1 FPF
1. Patrol check for all production facilities has been done, monitor & record the
parameter.
2. Received two load of oil from M33-1 (Rig-2077).
3. Housekeeping inside FPF.

Surge tank level: 3.4m.


Average transit line pressure: 0. 62Mpa
Average transit line flow rate: 45m3/h

1.3.3 Field:
1.3.4 Field personnel:

Name Company Position


Dayshift Personnel
Ibrahim Mohamed P.E Field Operator
Alamin Altayib P.E Field Operator
Nightshift Personnel
Mohammed Hashim P.E Field Operator

1. Routine check for all production wells and OGMs has been done.
2. Tested M10.
3. Cooperated with maintenance team to solve the malfunction problem of OGM06
test separator
Level transmitter LI-20202 (ongoing).
4. Drained sand traps of OGM 1, 2 &4 and reclaimed oil by vacuum to CPF.

AGR Activities:
Name Company Position
Dayshift Personnel
Abdelmunem Alamin P.E AGR Operator
Night shift
Ehab Abdelftah Khalifa P.E AGR Operator

1. Patrol check for engines, vessels and compressors has been done, monitor & record
its parameters.
2. Unit A (PK-2409A) stopped on Feb.03, 2015 due to compressor 2nd stage
piston damage.
3. Unit B (PK-2409B) running normal.

1.3.5 AGR daily running and performance report:

Engine No. Running (hrs.) Outlet Pressure (Mpa) Average Flow Rate(m3/h)

A
B 15 6.99 2182

Total Gas Volume(m3) 32735

FNE FPF
1Site Personnel:
Name Company Position
Dayshift Personnel

Mohammed Khidir P.E FPF Foreman

Mohamed Mahjoub P.E CR Operator

Ali Abdalla P.E FPF Operator

Nightshift Personnel

Rashid Mahdi P.E FPF Foreman

Osama Eltahir P.E FPF Operator

Mirghani Belal P.E FPF Operator

1.2 FPF Activities:

1. Patrol check for production facilities has been done, monitor & record its
parameters.
2. Drained sedimentation tank TK-8201-A & storage tank for 2Hrs.
3. Cooperated with maintenance team to Fabricate and Install Overflow pipe
Between Evaporation Ponds No-3 and No-4 (finished).
4. Housekeeping inside FPF.

Tanks Level:

TK-8201-A TK-8201-B TK-8477


15499 mm 15088 mm 5491mm

2.0 Field:-
2.1 Field personnel:

Mohammed Alaa P.E Field Operator


Name Company Position
Gorashi Ahmed P.E Field Operator

Dayshift Personnel
Nightshift Personnel

Abu Obaida Basheer P.E Field Operator

Nimir Abdalsalam P.E Field Operator


2.2 Field Activities:

1. Routine check for all production wells and OGMs has been done.
2. Shut in FNE-7 from 08:00 to 14:00 due to low Pump submergence.
3. Shut in FNE-42 from 08:00 to 20:00 due to low Pump submergence.
4. FNE-82 shut-in at 08:00 due to adjust aliment & change stuffing box
seal.
5. Cooperated with DCS staff to disconnect FNE-14 pressure switch cable
for rig.
6. Tighten stuffing box for some wells.
7. Updated parameters for some wells.

3.0 Sand Cleaning


3.1 Sand Cleaning Personnel:

Name Company Position


Sand cleaning Personnel

Mohammed Ahmed Bakheet P.E Sand clean Operator

Ahmed Awadelkreem P.E Sand clean Operator

3.2 Sand Clean Activities:

1. Received 10” formal pig from OGM-3 at 08:00 am. 

2. Launched 10” formal pig from OGM-4 at 0:00 am

3. Flushed OGM-6 trunk line by pumped hot water.

4. Sand Traps at OGM-4 & 6 cleaned on line & Drain bits


reclaimed.                                

Jake FPF
Site Personnel:-

Name Company Position


Dayshift Personnel
Mohammed Abdalla P.E Operation Supervisor
Hussien Hassan P.E FPF Foreman
Subhi Amin P.E C.R Operator
Alwathig Mohamed P.E FPF Operator
Nightshift Personnel
Mohammed Mahmoud P.E FPF Foreman
Osama Yahya P.E FPF Operator
Abdalla Ali P.E FPF Operator

1.2 Ongoing Operations and Evaluation


FPF Activities:-
1. Patrol check for production facilities has been done.
2. Clean filters of skimmed oil pumps (A) & (B).
3. Cooperated with maintenance team to as following:
 Repair to reset fault alarm in heater unit (A) P-7971-H-1(ongoing).
 Cleaned filters of Skim Pumps A/B.
4. Average flow rate to FPF 50.50 M³/hr. and to CPF 56.27 M³/hr.
Storage Tank parameter:-.

Tank Number Level (M) Temp (˚C)


TK-7501 7.5 61

2. Field:-
2.1 Site personnel:-

Field Activities:-
1. Routine check for all production wells has been done.
Abubaker Mahjoub P.E Field Operator

Nightshift Personnel
Emad Ibrahim P.E Field Operator

2. Continue N2 injection for JS-18 by (PSNI#1& PSNI#3).


3. Continue N2 injection for JS-19 by (PSNI#2).
4. Cooperated with Ram company to install Cathodic protection for JS-38 flow line
(ongoing)

Wells parameters (HP, MP& N2)


No. TP CP FLP T Choke Open Gas Close Gas Daily Injectio
(Mpa) (Mpa) (Mpa) (˚C) Size Injection Total Injection injection n Type
(mm) (m3)(15:00) Total (M3) And AGR
(m3)(15:00) (HP ,MP
or N2)

JS-1 9.1 N/A 0.83 64 50/50 97447565 97514650 67085 MP


JS-2 1.1 N/A 1.05 52 50 MP
JS-3 1.3 5.1 0.85 70 50 MP
JS-4 7.7 1.2 0.91 65 50 MP
JS-10 N/A N/A 1.25 63 50/50 76143741 76243080
99339 MP
JS-14 1.2 N/A 0.85 73 50
JS-15 1.4 N/A 1.15 60 50 35012222 35061690 49468 MP
JS-22 8.4 N/A
JS-26 1.5 1.05 0.75 56 50 MP
JS-28 1.5 9 1.1 62 50 MP
JS-35 7.8 0.9 1.1 66 40 30312111 30379710 67599 MP
JS-29 0.95 4.5 0.9 37

3. JAKE AGR:-
3.1 Site Personnel:-

Name Company Position


Dayshift Personnel
Albarra Almubarak P.E AGR Operator
Mohamed Dalil P.E AGR Operator
Altayeb Ibrahim P.E AGR Operator
Nightshift Personnel
Mohammed Fawzi P.E AGR Operator
Hatim Mohamed P.E AGR Operator

3.2 Jake M.P AGR Performance Report:-


Activities:-
1. Patrol check for engines, vessels and compressors has been done, monitor & record its
parameter.
2. Cooperated with mechanic team to replace the packing seal parts for AGR unit (B)
compressor stages. (Ongoing).
3. Units (A, C & D) running normally.

Engine No. Running Status Outlet Pressure (Mpa) Average Flow Rate(m3/h)
PK-7402-A Running 10.96 5664
PK-7402-B Stopped - -
PK-7402-C Running 10.99 8426
PK-7402-D Running 10.95 3810
Total Flow Rate 17890
3.3 Jake
Activities:-
1. HP units (A&B) stopped for maintenance due to malfunctions.
2. Handover AGR unit (B) to contractor for 16000hrs (engine) routine maintenance,
(ongoing).

Engine No. Running Status Outlet Pressure (Mpa) Suction (Mpa) Average Rate(m3/hr)
PK7403-A Stopped - - -
PK7403-B Stopped - - -
Total Flow Rate -

4. Reclaim System and retention pond progress:-


1. Level at evaporation pond#1 approximately 90%.

KEYI FPF
1.1Site Personnel:-
1.2
Name Company Position
1.3 Dayshift Personnel
Sirag Omer P.E FPF Foreman
Saad Abdelazem          P.E FPF Operator
Ahmed Hassan P.E FPF Operator
Yousif Ahmed P.E FPF Operator
Nightshift Personnel
Mohammed Mahdi P.E FPF Foreman
Assad Almosalami P.E FPF Operator
Mozamel Yousif P.E FPF Operator
Ongoing Operations and Evaluation:
1.4 Day Activities:
1. Patrol check for all FPF equipment’s has been done.
2. Continue draining water from Storage Tank TK-6501A &B.
3. Reclaimed oil from retention pond by vacuum truck.

1.5 .Tanks level:

Tank Number Level (m) Temp. (˚C)


TK-6501-A 9.9 62
1.
TK-6501-B 7.5 56 Field:
2.1. Site
Total Flow rate to CPF (m3/hr.) 30 m3/h
Personnel:

Day shift Personnel


Name Company Position
Faiz Elsidig P.E Field Operator
Night shift Personnel
Name Company Position
Wail Abbas P.E Field Operator
2.2. Day Activities:

1. Routine check for all wells & OGMs has been done.
2. Checked status of ESDV’s for Gas lifting wells & OGMs.
3. Hydro test & flush for K-N-4 flow line successfully done.
4. Increased the freq. K-23 gradually from 30 Hz to 40 Hz at 10:30.
5. Cooperated with DCS staff to replace the flow line pressure gauge s of K-23 & K-20.
6. Cooperated with Petro need staff to weld the flow line of K-N-11 (ongoing).
7. Cooperated with Viacom staff to make hole for K-N-4 VSD.
8. Cooperated with DCS staff to fix the problem of OGM-1 test separator micro motion.
9. Tested one well.

2.3. Updated well parameters:

Well name C.P T.P FL.P FL.T Current Freq.


(Mpa) (Mpa) (Mpa) (˚C) (A) (Hz)
K-23 0 1.2 1.12 36 43.2 40

2. AGR:
3.1 Site Personnel:

Name Company Position


Day shift Personnel
Ahmed Hassan P.E AGR Operator
Mustafa Ahmed P.E AGR Operator
Night shift Personnel
3.2 Day Activities:
Telal Hussein P.E AGR Operator

1 Patrol check for engines, vessels and compressors has been done, monitor& record
parameters.

2 Added lube oil to Unit C.

3 Unit C is running normally.

4 Unit B under maintenance.

5 Unit A stopped.

5.1 Units Performance:


Engine No. Running Status Outlet Pressure (Mpa) AV-Flow rate (m3/hr.)

A Stopped - -
B Standby - -
C Running 7.8 5474
Total Flow rate (m3/hr.) 5474

Remark

3. Vehicles & Utilities:

Vehicle Quantity Company Job Description Work Time Standby Time Remarks
Vacuum 2 ZPEB Reclaimed oil from retention pond. 2 Hrs
Truck
Water 1 ZPEB Hydro test & flush for K-N-4 flow line. 3 Hrs
tanker
Pump truck 1 ZPEB Hydro test & flush for K-N-4 flow line. 4 Hrs

1.6HADIDA FPF :-
Site Personnel:-

Name Company Position

Dayshift Personnel
Musa Abu Makeen P.E Operation Supervisor
Muaz Awad P.E FPF Foreman
Omer Osman P.E CR Operator
Ahmed Ali Obaid P.E Field Operator
Abdalla Omer P.E FPF Operator

Nightshift Personnel
Alamin Awad P.E FPF Foreman
Ahmed Ali P.E FPF Operator
Farah Nasir P.E FPF Operator
Hosam Musa P.E FPF Operator

1.2 Ongoing Operations and Evaluation


1.3 Day shift Activities
FPF:
1. Patrol check for all production facilities has been done, monitor & record the
parameters.
2. Continue draining bottom water from storage tanks.
3. Water injection pump running for 24 hrs.
4. Centrifugal pump P-4501B running for 24 hrs.
5. Screw pump P-4501C stand by.
6. Cleaned the filters of unloading tank.
7. Clean and cut the dried bushes inside and around FPF (ongoing).
8. Cooperated with DCS staff to check and repair the production seperator gas flow
meter.

Storage tank level A:4.47m. B:34.57m.

Transit line pressure 2491Kpa


Average flow rate 75 m3/h

Field:
1. Patrol check for all production wells has been done.
2. Retested H-9.
Mud Pump Activity

1. Patrol check has been done, monitor & record the parameter.
2. Mud pumps- A runing for 5 hrs & B stand by.
3. Cooperated with mechanic staff to replace the water supply hose for mud pump
A.

Sufyan FPF
Site Personnel:-

Name Company Position


Dayshift Personnel
Sun Ming Shan P.E Op. superintendent
Mohammed Nasur P.E Operation Supervisor
Abdelmohsen Abdallah P.E FPF Foreman
Asem Fatihalaleem P.E FPF Operator
Mohammed Alfatih P.E C.R Operator
Osman
Hosam Alden Ahmed P.E FPF Operator
Nightshift Personnel
Ayman Mohammed P.E FPF Foreman
Hassan Abaker P.E C.R Operator
Ali Mohamed Ali P.E FPF Operator
1.2
Ongoing Operations and Evaluation:
1.3 Day Shift Activities:
FPF:

1. Patrol check for all production facilities have been done, monitor & record the
parameters.
2. Drain the condensate from fuel gas scrubber (continuously).
3. Cooperated with DCS &PSI team to check & repair solenoid valve of dryer B
at instrument air compressor (ongoing).
4. 18m3 of hot water loaded from EPF to well site.

1.4 Parameters:-

Storage tank level A:5.0m B: 5.0m


Transit line pressure 2530Kpa
Transit line temperature 70°C
Average flow rate 12.5m3/h

2.0 Field:
2.1 Field personnel:

Name Company Position


Dayshift Personnel

Omer Himadan P.E Field


Operator
2.2 Mohammed Bashir Khalid P.E Field Activities:
Operator
1. Routine
check for all production wells have been done.
2. Sufyan-4 flow line flushed by hot water.
3. Stuffing box leakage of Suf-N4, repaired by maintenance team.
4. Housekeeping operation performed for singal screw transfer pump of
OGM-2.
5. OGM-2 singal screw transfer pump running normal in auto position
(under observation).
6. OGM-3 singal screw transfer pump running normal in auto position
(under observation).
7. Cooperate with RAM CO to repair the problems of OGM-2&3 test
separator (ongoing).

Transfer Pump parameters OGM-2 OGM-3 OGM-4


Suction Pressure 0.75 Mpa 0.89 Mpa 1.39Mpa
Discharge pressure 2.6 Mpa 2.3Mpa 2.55 Mpa
Differential Pressure (DP) N/A - 0.01Mpa
Temp. 34°C 28°C 46°C
Set point 0.80 Mpa 0.9 Mpa 1.4 Mpa
Freq. 10 Hz 18 Hz 18.6Hz