Project Name: Reconstruction with Geometric Improvement of existing

single/Intermediate lane to 2 lane with earthen shoulder configuration from existing km.
16.545 to km. 33.130 & Km. 41.260 to km. 57.975 (Design chainage 18.700 to km
35.130 & km 47.700 to 63.700) excluding khat village from km. 53.425 to 55.530
(Design chainage 59.390 to km 61.150) of NH-109 in the state of Uttarakhand on EPC
Mode under improvement of NH connectivity to Chardham

EPC CONTRACTOR – M/S SCIW – RGBEL (JV)

List of Water Bodies

Sr.No. Chainage Location Remarks


1 22+150 Bedubgad Water accumulates in Water Tank
2 25+530 Chandrapuri Temple
3 31+820 Bhiri Open Water Resources
4 49+070 Guptkashi Water Fall During Rainy Season
5 53+000 Byungad Water accumulates in Water Tank
6 53+700 Byungad Temple
7 55+500 Korkhi Natural Water Fall (Perennial)
8 56+905 Korkhi Water Fall
9 59+200 Maikhanda Natural Water Fall (Perennial)
10 62+510 Fata Temple (Perennial)
11 63+030 Fata Water Fall During Rainy Season

List of Construction Camp for the Project Road

Sr.No. Chainage Location Remarks


1 23+800 Saudi Construction Labour Camp
2 24+700 Gabnigoan Office, Lab, Workers/Labour Residence
3 34+020 Kakadagad Construction Labour Camp
4 55+000 Korkhi Construction Labour Camp