Professional Documents
Culture Documents
DURING COMMITMENT AND PLANNING
1. Fill up all required information of the Ratee and Office Data
a. Ratee*: Enter the name of the employee filling out this IPC Form (Last Name, First Name, Middle Na
b. Position Code*: (Acronym of Position)
c. Item Number*: Current Plantilla Position Item Number
d. OFFICE/DIVISION PER POSITION*: (Office Assignment per Plantilla Position, )
e. DARRO/DARPO*: Indicate if DARRO or DARPO only (DO NOT Specify specific region or province)
f. Province: Indicate Province where the division or municipal office is situated. If division is in the DARR
g. Region*: Indicate Region Code
h. Sector*: Indicate LTS, AJD, TASS, STO, PPRO (for DARCO Only)
i. Designations (Spaces below will be filled-up ONLY if there are designations other than current planti
CETERA)
1. Designation1: (write designation if any, leave it blank if none)
2. Concurrent with Position? (YES / NO)
3. Office per Designation: (Cite the office assignment per designation)
4. Province: Indicate Province where the division or municipal office is situated. If division is in the
5. Region*: Indicate Region Code
6 Special Order for Designation: (Indicate the Special Order No. of designation)
7. Rater for Designation: (Indicate the Name of Rater per designation)
It is possible that an employee maybe designated to other plantilla positions (maximum of three) in co
designation3 groups. DO NOT Include Designations in Task Forces, Committees, etc
J. PERIOD From*: Calendar Month (Select from Dropdown List)
k. PERIOD To* : Calendar Month (Select from Dropdown List)
l. YEAR*: Indicate Year
m. Name of Immediate Supervisor* Indicate the name of the immediate supervisor (in mother Unit)
n. Position /Designation* ; Indicate Current Position or Designation of Immediate Supervisor (eg. OIC-C
o. Name of Head of Office*
p. Position /Designation* ; Indicate Current Position or Designation of Head of Office (eg. OIC-PARPO 2
NOTE: Information provided in the Ratee Data worksheet will automatically reflect in the Main Form Wo
2. After filling up the Ratee Data Worksheet, proceed to the main form worksheet.
3. On the column core function , put the cursor on the blank cell just below the core function and click the drop
4. After selecting your first core function, go to the next column (output) select the outputs of your first functio
5. After identifying output, go to next column (success indicators), select the applicable success indicator of th
6. Repeat steps 3 to 5 until you have reached the total 100% weight allocation.
NOTE: if there are activities/indicators that are not included in the drop down menu, fill up the MANUAL Form
case, you have two (2) IPCRs – the main form and the manual form, but ensure that the total weight is 100%.
Please be reminded that the inputs in the manual IPCR will be submitted or reported to Director Nestor Bayone
for inclusion in the finalization of the template with the approval of the TWG.
7. RATEE sends e-copy of the accomplished IPC plan for review and approval of the supervisor
8. SUPERVISOR keeps the automated e-copy of the reviewed IPC plan of staff and provide the same copy t
DURING REVIEW AND EVALUATION (use the approved IPC plan)
1. Discuss the division and individual accomplishments vs. plan/targets.
2. RATEE fills up the column of accomplishments based on the success indicators and rates the accomplishmen
3. RATEE sends the accomplished IPCR form to supervisor for review.
4. SUPERVISOR assesses and evaluates the performance of staff using the monitoring and tracking form and ot
5. SUPERVISOR sends back the reviewed IPCR to staff for printing
6. Provide a print copy of IPCR to supervisor ready for review and evaluation of the PMT
NOTES for supervisors/Division Chiefs:
1. Supervisor tracks and monitors the performance of staff using the performance monitoring and tracking form
2. Conduct regular feedbacking and coaching session, as necessary
RATEE*
POSITION CODE*
ITEM NUMBER*
OFFICE/DIVISION PER POSITION*
DARRO/DARPO
PROVINCE*
REGION*
SECTOR*
DESIGNATIONS
DESIGNATION 1
CONCURRENT WITH POSITION?
OFFICE PER DESIGNATION1
DARRO/DARPO1
PROVINCE1*
REGION1*
SPECAL ORDER FOR DESIGNATION 1
RATER FOR DESIGNATION 1
DESIGNATION 2
OFFICE PER DESIGNATION 2
DARRO/DARPO2
PROVINCE2*
REGION2*
SPECAL ORDER FOR DESIGNATION 2
RATER FOR DESIGNATION 2
DESIGNATION 3
OFFICE PER DESIGNATION 3
DARRO/DARPO3
PROVINCE3*
REGION3*
SPECAL ORDER FOR DESIGNATION 3
RATER FOR DESIGNATION 3
PERIOD FROM*
PERIOD TO*
YEAR*
NAME OF IMMEDIATE SUPERVISOR*
POSITION/DESIGNATION*
POSITION/DESIGNATION*
SAMPLE DISPLAY:
RATER(S)
ENTRY BOX (FILL UP REQUIRED* ENTRIES, OTHERWISE LEAVE BLANK)
CONCON, BEA ROSALIND BOQUE
ARPT
DARMO-MAITUM
DARPO
SARANGANI
REGION XII
JANUARY
JUNE
2020
GREGORY JOHN MARSHALL N. MARTOS
OIC-MARPO
CENON S. ORIGINAL
OIC - PARPO II
PBDD
2017
`, -
DEPARTMENT OF AGRARIAN REFORM
INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW/RATING (IPCR) FORM
I, CONCON, BEA ROSALIND BOQUE, ARPT OF DARMO-MAITUM, DARPO-SARANGANI, REGION XII, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period JANUARY to JUNE ,
2020
SIGNATURE OF RATEE
DATE (mm/dd/yyyy)
1 CF with a Total
DNYD GFI DARMO assists in the conduct of JFI JFI on DNYD GFI lhs conducted 100% JFI properly conducted as scheduled 2% 0.00 0.000 Area of
2.0900has.
1 CF with a Total
100% complete GFI CF documents within
DARMO submits Complete CF Complete GFI CF submitted
five (5) working days upon conduct of JFI
2% 0.00 0.000 Area of
2.0900has.
Provide Technical Support Technical Support Provided Facilitate delivery of RFQ's from DARPO to 3% 0.00 0.000 1 RFQs
caterer within 5 days upon receipt
Delivers notices Notices delivered to ARBOs delivered notices within 5 days upon 2% 0.00 0.000 1 Notice
Agrarian Production Credit Program receipt of the memo from DARPO, with
(APCP) proof of receipt by concerned stakeholder
Provide Technical Support Technical Support Provided Facilitate delivery of RFQ's from DARPO to 2% 0.00 0.000 1 RFQs
caterer within 5 days upon receipt
ALI
100% summons, notices and other legal
Deliver summons, notices and other legal Summons, notices and other
Endorsed Cases
documents documents delivered
documents delivered within 3 days upon 4% 0.00 0.000 1 case
receipt
STO
100% of assigned records shelves
Management of Records STORAGE AND MAINTENACE OF RECORDS a. Records Shelves accurately monitored for thorough 5% 0.00 0.000 2 shelves
cleaning throughout the semester
receives and acts on the of ARBs request for letter request for subdivision survey 100% of the letter request promptly
subdivision survey received and acted acted within 3 days upon reciept
prepares RSS for Subdivision of Collective CLOAs RSS for Subdivision of Collective 100% of RSS accurately prepared
CLOAs prepared within 3 days upon reciept
validates RSS for Subdivision of Collective CLOAs RSS for Subdivision of Collective 100% of RSS validated properly within
CLOAs validated 7 working days upon reciept
CARPO certifies RSS for Subdivision of Collective RSS for Subdivision of Collective 100% of RSS not yet subjected to
CLOAs not yet subjected to same survey CLOAs certified same survey accurately certified by
CARPO within 8 hrs upon reciept
PARPO approves RSS for Subdivision of Collective RSS for Subdivision of Collective 100% of RSS carefully approved by the
CLOAs CLOAs approved CARPER Form 1 PARPO within 8 hrs upon reciept
prepares certification of preliminary projection certification of preliminary projection 100 % certification of preliminary
for Subdivision of Collective CLOAs for Subdivision of Collective CLOAs projection for Subdivision of
CARPER Form 2 Collective CLOAs properly prepared
within 8 hrs. upon reciept
prepares survey modules on Collective CLOAs survey modules or contract for survey modules for Subdivision of
either for contract or admin survey Subdivision of Collective CLOAs Collective CLOAs prepared accurately
and approved withiin 5 hrs.
assigns survey modules on Collective CLOAs to survey modules for Subdivision of 100% of the survey modules
Survey Team Collective CLOAs assigned accurately assigned to survey team
within 5 hrs. upon reciept of module
transmits approved survey modules for copy of transmittal approved survey 100% of copy of transmittal approved
Subdivision of Collective CLOAs together with modules for Subdivision of Collective survey modules properly transmitted
supporting documents to BAC CLOAs to BAC for bidding within 8 hrs. upon
reciept
awards survey modules on Collective CLOAs to GE Notice of Award survey modules on 100% of Notice of award properly
contractor Collective CLOAs executed to GE contrator within 5
working days upon approval of the
notice
conducts initial Pulong Pulong on Collective CLOAs minutes of initial Pulong Pulong on 100% of Pulong -Pulong successfully
Collective CLOAs conducted 5 days after the issuance of
Notice of Award
assists field survey activities on Collective CLOAs field survey on Collective CLOAs 100% of field survey properly assisted
assisted as scheduled
monitors field survey on Collective CLOAs status report of field survey on 100% status report of field survey
activities Collective CLOAs activities activities prepared accurately and
submitted within 2 working days after
monitoring
reviews advance plan of Collective CLOAs for advance plan of Collective CLOAs 100% of advance plan accurately
presentation during the final pulong pulong reviewed reviewed 1 day before pulong pulong
conducts final Pulong Pulong on Collective CLOAs minutes of final pulong pulong on 100% minutes of conducted Pulong-
Collective CLOAs pulong properly prepared with
highlights and agreements captured 4
hrs. after the activity
accepts survey returns of Collective CLOAs from survey returns of Collective CLOAs 100% of survey returns completely
GE contractors accepted from the GE contrators
within 60 min upon instruction
reviews survey returns of Collective survey returns of Collective CLOAs 100% of SRS reviewed based on
CLOAssubmitted by GES reviewed checklist as to correctness and
completeness within 5 working days
upon receipt
prepares transmittal of survey returns of transmittal letter or memorandum of 100% transmittal letter or
Collective CLOAs Collective CLOAs memorandum prepared with 3
revision within 4 hrs upon instruction
transmits survey returns of Collective CLOAs to transmittal of SRs on Collective CLOAs 100% of SRs with complete
DARRO attachments submitted to DARRO
within 3 working days after review
submits SR of Collective CLOAs to DENR LMS for SR of Collective CLOAs submitted or 100% of Quality SRs submitted or
IVAS transmitted to DENR transmitted properly to DENR with
complete supporting documents
within 2 working days after review
monitors status of verification and approval of SR status report of verification on 100% of status report of monitoring of
of Collective CLOAs at DENR Collective CLOAs SR at DENR prepared accurately within
8 hrs. after monitoring
monitors progress of transaction of Collective status report of transaction of 100% of status report on the progress
CLOAs at DENR Collective CLOAs of transaction at DENR prepared
accurately within 5 hrs. after
monitoring
receives ASP of Collective CLOAs from DENR LMS copy of ASP or NTDS of transaction of 100% of ASPs or NTDs recieved
Collective CLOAs received properly from DENR LMS with
complete supporting documnents
within 30 mins
prepares transmittal memo of ASPs or NTDs of transmittal memo of ASP or NTDS of 100% transmittal memo of ASPs or
transaction of Collective CLOAs to DARMO transaction of Collective CLOAs NTDs properly transmitted to DARMO
within 8 hrs. upon instruction
FUNCTIONS ACTIVITY
LTS
Facilitation of BARC Reorganization Prepares and sends Notices for BARC Reorganization
Land Transfer Clearance as per DAR AO 8 Reviews and evaluates the documents contained in the
series of 1995 and DAR AO 1 series of 1989 application of Land Transfer Clearance
Liquidation of sugarcane proceeds Computes and distributes Tenants and LOs shares per
milling season
Collection of Landed Estates Lot accounts Computes and and collectsf Landed Estates lot account
and DARAB fees and DARAB fees
LEASEHOLD OPERATION MARPO LEVEL Prepares and posts list of tenanted LHs and individual
profile of LHs in case of NO DARMO
EP CLOA REGISTRATION (MARPO LEVEL) Prepares land distribution folder at MARO level
REDOCUMENTATION OF COLLECTIVE CLOA Reviews individual CLOA worksheet for signing and
sealing
REDOCUMENTATION OF COLLECTIVE CLOA Receives & Records Redocumentation Folders at
(PROVINCIAL LEVEL) DARPO level
Reviews redocumentation folders at DARPO level
SUBDIVISION OF COLLECTIVE CLOAs Update Survey Returns Request from DARPO for
approval at DENR
Monitors approval of Survey Return Request submitted
by DARPO
SUBDIVISION OF COLLECTIVE CLOAs Monitoring field surveys activities at MARO level
MARPO LEVEL
Redocumentation of CCLOA Secures basic documents such as TCT CCLOA ASP Tax
Declaration etc
ARBDSP
Provision of Livelihood Assistance to CLAAP Conducts review of the submitted CLAAP Project
Beneficiaries Proposal
DARRO level
Provision of Linking Smallholder Farmers to Prepares training proposals and Activity design for the
Market conduct of AED trainings for cluster leaders at DARRO
level
Provisions of Farm Business School DARROs consolidates and submits reports of FBS
Provision of Program to Improve Rice Reviews and finalizes PIRProM project proposals
Production and Mechanization submitted by the DARPOs
ALS
Conversion or Exemption or Exclusion Checks and evaluates Initial Application folder for
Conversion or Exemption or Exclusion submitted by the
applicant
Land Transfer Clearance as per DAR AO 8 Reviews and evaluates the documents Land Transfer
series of 1995 and DAR AO 1 series of 1989 Clearance contained in the application
NON LCMS BASED REPORTS Prepares the case index for non LCMS cases
STO
ATTENDANCE TO NATIONAL & REGIONAL Attendance to National and Regional Orientation/
ORIENTATION/ ASSESSMENT ON THE Assessment
PREPARATION OF BUDGET PROPOSAL AND
FINANCIAL PLAN
Collection Services and Funcions Receives Order of Payment from incoming Clients
Managing Cash Advances and Petty Cash Records Cash Advances to Cash Books
Fund
Effects Payment to Creditors or Clients and Personnel
PLANNING FUNCTION
PLANNING AND DEVELOPMENT Review of activity/project proposals or plans
HRD FUNCTIONS
Preparation of HRD Plan Consolidates Individual Development Plans
Administers TNA
Processing of submitted SALN Monitors SALN submissions and Conduct SALN Review
Monitors and reviews the issuance of Monitors and reviews the issuance of earned COCS and
earned COCs and availed CTOs availed CTOs
Personnel Records Maintained and
Updated
Supervises and maintains 201 and 202 Files Supervises or maintains 201 and 202 Files and
and databases of personnel databases of personnel
Reviewing and initials payroll for salary and Reviews and initials payroll for salary and other
other benefits benefits
Reviewing and signing monthly remittances Reviews and signs monthly remittances of personnel
of personnel
Supervises and Controls Financial Resources Processes payment for various claims
Deposits collection
Financial Statements Report Prepared and Prepares Financial Statements Report and Supporting
Certified Schedules
Membership in BAC
Documents for Certificate of Non Issuance 100% of Requests for Certificate of Non
of NOCevaluated issuance of NOC properly evaluated within 30 7.5
minutes upon receipt
Requests for Certificate of Non Isssuance of 100% of requests properly received and
NOC recived and recorded recorded within 15 minutes upon receipt
Status of Certificate of Non Isssuance of 100% of status of NOC issuance accurately
NOC checked or validated checked or validated within 30 minutes upon
receipt
Received copy of Notices for BARC 100% of Notices for BARC Reorganization
Reorganization accurately prepared and sent within 2 days
before conduct
Certificate of Posting Compliance of LUC 100% of LUC Form 4 accurately prepared and
Form 4 posted within 3 days upon receipt
OCI report on Application for Conversion or 100% of OCies properly conducted within 5
Exemption or Exclusion days upon receipt
LUC Form 3 accomplished 100% of LUC Form 3 accurately prepared and
submitted to MARPO within 2 days upon
conduct of OCI
Application folder reviewed and evaluated 100% of applications accurately reviewed and
in the application of Land Transfer evaluated
Clearance
CARP LAD Form No 63 Masterlist of EPs and 100% of Monthly Report on Distributed EPs
CLOAs and CLOAs accurately prepared and
submitted to DARPO on due date
LBP transmittal slip and deposit slip properly 100% of copies of transmittal and deposit slip
acknowledged properly received acknowledged by the teller
and machine validated and filed within 30
minutes upon receipt
Updated Cash Receipts Register and Cash 100% of the Collection and deposits properly
Receipt Record recorded in the Book of ccounts within 1
day.
ARB on OLT validation reports 100% of ARBs validated and verified versus approved
survey plan, Annex A and EPCLOAIS database within the
first sem and submit report 15days after validation
OLT FORMS accomplished 100% OLT Forms accomplished and facilitated within
forty five (45) days upon completion of the documents
Special reports prepared and submitted 100% Special reports satisfactorily prepared
and submitted on the deadline
Secured and gathered documents 100% Other documents requested by DARPO
properly prepared within 5WD upon reciept
of request
Validated RSS furnished to BLTI 100% RSS properly validated and furnished to
BLTI within 15 WD
Status report 100% status report accurately prepared and
submitted with 5 WD after the survey activity
EP OR CLOA worksheets and signing and __ EP or CLOA Worksheets and signing and
sealing machine utilization sealing machine utilization involving __ARBs
with ___hectares correctly generated
within___ hr./CLOA
Individual CLOA signed and sealed __Individual CLOA involving __ARBs with
__hectares signed and sealed within __hrs.
Copy of CLOA and ASP 100% Copy of CLOAs & ASP gathered
correctly within 15 working days
LDIS FORM 47 100% LDIS Form 47 prepared correctly within
3 mos.
Form submitted and acknowledgement 100% LDIS submitted to LBP within 4 W.D.
receipt after preparation properly acknowledged by
LBP-AOC
Activity report of initial pulong pulong at 100% Activity reportof initial pulong pulong
MARO level on the subdivision of Collective on the subdivision of Collective CLOAs
CLOAs imediately prepared and submitted on agreed
deadline
Copy of ASP and TTDs at MARO level 100% copies of ASPS or TTDS properly
received or filed within 8 Hrs.
Copy of CLOA and ASP at MARPO LEVEL 100% Copy of CLOAs and ASP at MARPO level
gathered correctly within 5 working days
LDIS FORM 47 at MARPO LEVEL 100% LDIS Form 47 prepared correctly within
2 working days
Form submitted and acknowledgement 100% LDIS form for proper accomplishment
receipt submitted and acknowledgement receipt to
LBP within 1W.D. after preparation
Accomplished form and signed by Parpo 100% Accomplished LDIS accurately signed
within 2HRS.
Complete LDIS provided and 100% Complete LDIS accomplishment report
acknowledgement receipt LBP AOC provided within 2 working days
Memoranda or Reply Letters prepared and 100% properly prepared/ drafted 4 hours
drafted upon receipt per routed communications/
directives
staff and field personnel mentored 100% Clearly innovated and generated
solutions/developed options for thirty
(30) staff/field personnel adaptation of
procedures everytime mentoring is being
undertaken
Complete copy of required documents for 100% completion of needed documents secured
redocumentation of CCLOA and gathered within 7 working days per REDOC
folder.
Deed of Partition 100% deed of partition prepared completely
within 1 day
Proper identification of lot allocation 100% of ARBs with lot allocation on the deed of
partition within 3 days per REDOC folder.
Notarized Deed of Partition 100% Deed of Partition notarized correctly 3 days
after signing.
Trasmittal letter to DARPO 100% of REDOC folder accurately prepared within
2 days after notarization of the Deed of Partition
LINKSFARM Project Proposal and Activity 100% of LINKSFARM Activity proposal and
Design prepared Design prepared with 2 minor revisions and
acceptable by DC for approval of the RD
within 22 working days.
Farmers Forum assissted and attended 100% attendance & assistance to Farmer's
Forum
FBS consolidated and submitted report 100% of report submitted by DARPOs
consolidated & finalized for submission to
DARCO with 2 minor revisions & acceptable
by the DC for approval by the RD/ARD within
2 working days.
approved Records Inventory report 100% of major files were inventoried &
recorded within 5 working days
Approved Liquidation Report 100% of cash advances were liquidated with
complete supporting documents received &
accepted at the accounting Section.
Annual Procurement Plan and Project 100% Annual Procurement Plan and Project
Procurement Management Plan prepared Procurement Management Plan properly
prepared and submitted on deadline
PARCCOM accomplishment report Prepared 100%of PARCCOM target Financial and physical
and submitted accomplishment accurately prepared and
submitted on deadline
PARCCOM and PBDD Annual and Project 100% PARCCOM and PBDD Annual and Project
Procurement Plan Procurement Plan accurately prepared and
submitted on deadline
Project accomplishment report prepared and 100% Project accomplishment report of the target
submitted Physical and financial plans for SIB & PARCCOM
accurately prepared and submitted on deadline
SIB unit staff Supervised and monitored 100% SIB staff properly supervised and monitored
Certificate of Posting Compliance of posts 100% of LUC Form 4 accurately prepared and
LUC Form 4 posted within 3 days upon receipt
Report of conducted OCI for Conversion or 100% of OCies properly conducted within 5
Exemption or Exclusion area days upon receipt
LUC Form 3 accomplished 100% of LUC Form 3 accurately prepared and
submitted to MARPO within 2 days upon
conduct of OCI
Application folder for Land Transfer 100% of applications folder for Land Transfer
Clearance reviewed and evaluated Clearance accurately reviewed and evaluated
Updated ALI case status 100% ALI case status updated regularly and
accurately within 4 hrs. per case in the LCMS
Updated LTC case status 100% LTC case status updated regurly and
accurately within 4hrs. Per case in the LCMS
Non LCMS Case index prepared 100% Non-LCMS case indexa accurately
prepared on agreed deadline
Data for check issuance Encoded 100% data of Payee and Amount in the
database for Collection needed encoded error
free within a day
Check Issued Printed 100% of vouchers received issued check error
free
Daily Check Issued Recorded 100% Check Issued for the day Recorded
Error Free
checks Issued Released 100% of Check Issued were released to Payee
and signature were secured in the received
payment box
Report of check Issued generated and 100% Monthly Report of check Issued
Printed generated and printed error free on set
deadline
Order of Paymentfrom incoming Clients 100% Order of Payment from in coming client
received received on time
Data for Offcial Receipt Encoded 100% Order of Payment data of payee
amount and Purpose of payment encoded for
issuance of Offcial receipt error free.
Official Receipt of payments Printed 100% offical receipt of payment printed error
free on time
Official Receipt to Payee released 100% Offial receipt issued released to Payee
on time
Deposit Slip for Daily Collection Prepared 100% Deposit Slip for Daily collection
received were issued correspondong Depsoit
slip on set deadline
Official Receipt of Payee and amount 100% OR(Payee,Amount & Deposit Slip
Recorded recorded error free within the day
Proof of Collection Deposited to 100% Proof of Collection were issued Receipt,
Government Depository Bank deposited to GSB within 24 hrs.
Collection Report generated and Printed 100% Monthly Collection report generated
and printed from Collection database error
free on set deadline
Official Receipt and Checks Purchased 100% of allowed number of checks stub and
offical receipt purchased before last check
cosumed
Accountable forms Number series reviewed 100% of Accountable forms OR and Checks
were reviewed as to number series and
completeness.
Stubs of OR's and Checks Frecorded 100% of Purchase Or and Checks recorded in
the Accoutbale registry books error free
plans and proposal reviewed and submitted 100% of plans/proposals reviewed and
submitted on time
Awards and recognition conferred 100% team meetings attended and 100&
Resolutions finalized and duly signed within
one week after the meeting
Minutes and required docs prepared and 100% minutes of meeting and other required
submitted docs prepared and approved within two
weeks
Monthly reports to CSC prepared 100% reports to CSC prepared & submitted
on deadline
Endorsed and confirmed loan applications 100% eligible & qualified loan applications
with the Pag IBIG and GSIS with the Pag IBIG and GSIS properly
endorsed/confirmed on time.
Endorsed applications for retirement to the 100% eligible & qualified retirement
GSIS applications endorsed to the GSIS
Approved Activity Design and Proposal 100% Activity Proposals efficiently prepared
and facilitated for approval, 22 working days
before the actual conduct of the scheduled
activity
Training materials and kits prepared 100% Training materials and kits properly
prepared and made available during the
sessions
Report of Post Training Analysis 100% Post training analysis report accurately
prepared, submitted and made available for
reference for future actions
list of vacant positions for publication 100% of vacant positions accurately identified
identified with atleast 2 revisions & submitted to the
Appointing Authority for approval of
publication to the CSC website
List of qualified applicants per position title 100% of qualified applicants correctly
at CAF prepared assessed and categorized and prepared CAF
within 7 days with two (2) revisions.
Notices HRMPSB FSL deliberation prepared 100% Notices & documentary requirements
needed in the deliberation process prepared
& reviewed in the conduct of deliberation
process
Contracts of COS JOs personnel with 100% Contracts of COS JOs personnel with
complete documentary requirements complete documentary requirements
accurately prepared and submitted for
approval by the Head of Office or approving
authority
Profiles of COS personnel maintained and 100% of COS personnel profiles accurately
updated maintained and updated
SALN submissions monitored 100% Individual SALN of officials and
personnels properly monitored, reviewed and
prepared report of compliance for submission
to concerned offices
Issuance of earned COCS and availed CTOs 100% Issuaed earned COCS and availed CTOs
monitored properly monitored and reviewed on
scheduled time
maintained 201 and 202 Files and databases 100% 201/202 Files/databases on personnel
on personnel records acurately monitored/updated &
maintainted
Payroll for salary and other benefits 100% payroll for salaries and other benefits
reviewed and initialled (RATA, PERA,Bonus, PEI, PBB, ETC.) prepared
error free, reviewed & initialled 10 working
days upon receipt.
Agency Annual Procurement Plan prepared 100% Accurately Prepared Agency Annual
Procurement Plan submitted 1 day before
deadline
Agency annual procurement plan for 100 % Agency annual procurement plan for
common use supplies and equipments common use supplies and equipments
accurately consolidated, Reviewed,
Approved, and submitted within the deadline.
Agency procurement plan for common use 100 % consolidated, Reviewed, Approved,
supplies and equipments and submitted within the deadline.
Fidelity bonds for official and employees 100% Fidelity bonds for official and employee
accurately prepared on time.
Financial measures and controls initiated 100% Financial measures and controls
and recommended initiated and recommended accuracy
generation of savings for payment of other
personnel benefits annually
Cash Advances monitored and liquidated Certifies 100% liquidation of cash advances
before ending of the year
Approved allocation of object of 100% accuracy Fund allocation of object of
expenditures per PAP closely cordinated expenditures per PAP efficiently utilized by
the sector/ office/ unit on set deadline
Early procurement and public bidding Certifies 100% conduct of early procurement/
through BAC presented and apprised public bidding of goods services and
equipment by BAC
Budget Execution Documents BEDs 1 and 3 100% of plans and programs accurately
prepared and submitted for approval by the
head of office within the deadline
Data requirement on the OSBPS prepared 100% set of data requirement in the OSBPS
and encoded and submitted accurately prepared, encoded and submitted
on the specified date
Data requirement on the URS prepared and 100% set of data requirement in the URS
encoded and submitted accurately prepared, encoded and submitted
on the specified date
Personnel Salary Itemization prepared and 100% of data in the PSI per office/ province
updated accurately prepared and updated based from
the PSIPOP
Proper charging of expenditures as to its 100% of Obligation Request Status (ORS) and
Program Activity Project and UACS Object Budget Utilization Request Status (BURS)
Code
RIS of 3rd level Officials prepared, updated 100% 3rd Level Officials' RIS prepared,
and uploaded updated and uploaded
PCR of 3rd level Officials prepared, 100% 3rd Level Officials' PCR prepared,
submitted and uploaded updated and uploaded
CESPES rating of 3rd level Officials 100% 3rd Level Officials' CESPES rating
completed completed
Minutes and Resolutions Prepared 100% Minutes of Meetings & Resolutions
prepared with 100% accuracy and submitted
within 2 weeks after deliberation
Submit processes and other required 100% ISO processes & other required
documents documents Satisfactorily prepared on the
deadline
Memo required for submission ssubmitted 100% of memo received complied COMPLETE
and complied implemented and submitted within 10 days
upon receipt
COA AOM answered,complied replied & 100% of COA AOM replied and submitted on
submitted time given timeline by COA.
COA Management Letter replied 100% of COA management Letter replied
submitted within the timeline given by COA
Good Governance REQUIRMENT monitored 100% of Good governance REQUIREMENTS
and complied complied,monitored,implemeented and
submitted on time.
RIS and Vouchers accomplished 100% of RIS and Vouchers prepared and
submitted as scheduled
CSO
CSO INFORMATION Updates CSO Assisted Landholdings
MANAGEMENT
Prepares updated reports
submitted to DARCO and DARPO
and CSO concerns
Consolidates accomplishment
reports submitted to Regional
Quick Response Officer and Public
Assistance and Media Relations
Service
LAND DISTRIBUTION AND Facilitates Request of Registered
INFORMATION SCHEDULE individual CLOAs or RP Titles at ROD
REDOCUMENTATION OF
COLLECTIVE CLOA
Receives Memorandum of
Valuation of AO 9 Series of 2011
Claim Folder
NOC
NOC Claim Folder Preparation Secures basic documents for NOC
and Documentation folder
LTS
Survey
Survey Technical Data and Computes Technical Description in
Gathering the Title to check if defective or
correct
LMS
Survey reviews survey returns
Research of Titles from Different
RODs
Research of Tax Declaration
Research of Lot Data in LMS
Field Work Completed
Status of CSO Assisted Landholdings 100% CSO assisted LHS properly
updated maintained and updated
Updated reports prepared 100% updated reports prepared and
submitted to DARCO, DARPO and CSO
concerns within a month
Documents and Status Report followed 100% Documents and Status report
up or secured followed up/secured within a month
Filed pertinent documents and reports 100% pertinent documents and reports
(Case Briefs, profile of Pos/NGOs and
other records related to CSO) recorded
and filed one hour upon receipt
ASP requested from Survey Section 100% ASP Successfully requested from
Survey Section and validated within 1
week
Successfully encoded
Generated/Registered Individual CLOAs in
Registered Individual CLOAs in REDOC REDOC within 30 minutes
I, CONCON, BEA ROSALIND BOQUE, ARPT OF DARMO-MAITUM, DARPO-SARANGANI, REGION XII, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated mea
, 2020
Discussed with:
GREGORY JOHN MARSHALL N. MARTOS
(Name and Signature of Rater(s) Date (mm/dd/yyyy)
Legend:
Qn - Quantity Ql - Quality T - Timeliness
EFORM
D REVIEW (IPCR) FORM
he attainment of the following targets in accordance with the indicated measures for the period JANUARY to JUNE
SIGNATURE OF RATEE
DATE (mm/dd/yyyy)
1 - Poor
Final Rating
CENON S. ORIGINAL
Name and Signature of Head of Office Date (mm/dd/yyyy)
WA-
Subdivision of Collective CLOAs generates data on Collective CLOAs from FOFile 3 list of Collective CLOAs generated 100% list of Collective CLOAs from
FOFile 3 generated accurately within 5
days
receives and acts on the of ARBs request for letter request for subdivision survey 100% of the letter request promptly
subdivision survey received and acted acted within 3 days upon reciept
prepares RSS for Subdivision of Collective CLOAs RSS for Subdivision of Collective 100% of RSS accurately prepared
CLOAs prepared within 3 days upon reciept
validates RSS for Subdivision of Collective CLOAs RSS for Subdivision of Collective 100% of RSS validated properly within
CLOAs validated 7 working days upon reciept
CARPO certifies RSS for Subdivision of Collective RSS for Subdivision of Collective 100% of RSS not yet subjected to
CLOAs not yet subjected to same survey CLOAs certified same survey accurately certified by
CARPO within 8 hrs upon reciept
PARPO approves RSS for Subdivision of Collective RSS for Subdivision of Collective 100% of RSS carefully approved by the
CLOAs CLOAs approved CARPER Form 1 PARPO within 8 hrs upon reciept
prepares certification of preliminary projection certification of preliminary projection 100 % certification of preliminary
for Subdivision of Collective CLOAs for Subdivision of Collective CLOAs projection for Subdivision of
CARPER Form 2 Collective CLOAs properly prepared
within 8 hrs. upon reciept
prepares survey modules on Collective CLOAs survey modules or contract for survey modules for Subdivision of
either for contract or admin survey Subdivision of Collective CLOAs Collective CLOAs prepared accurately
and approved withiin 5 hrs.
assigns survey modules on Collective CLOAs to survey modules for Subdivision of 100% of the survey modules
Survey Team Collective CLOAs assigned accurately assigned to survey team
within 5 hrs. upon reciept of module
transmits approved survey modules for copy of transmittal approved survey 100% of copy of transmittal approved
Subdivision of Collective CLOAs together with modules for Subdivision of Collective survey modules properly transmitted
supporting documents to BAC CLOAs to BAC for bidding within 8 hrs. upon
reciept
awards survey modules on Collective CLOAs to GE Notice of Award survey modules on 100% of Notice of award properly
contractor Collective CLOAs executed to GE contrator within 5
working days upon approval of the
notice
conducts initial Pulong Pulong on Collective CLOAs minutes of initial Pulong Pulong on 100% of Pulong -Pulong successfully
Collective CLOAs conducted 5 days after the issuance of
Notice of Award
assists field survey activities on Collective CLOAs field survey on Collective CLOAs 100% of field survey properly assisted
assisted as scheduled
monitors field survey on Collective CLOAs status report of field survey on 100% status report of field survey
activities Collective CLOAs activities activities prepared accurately and
submitted within 2 working days after
monitoring
reviews advance plan of Collective CLOAs for advance plan of Collective CLOAs 100% of advance plan accurately
presentation during the final pulong pulong reviewed reviewed 1 day before pulong pulong
conducts final Pulong Pulong on Collective CLOAs minutes of final pulong pulong on 100% minutes of conducted Pulong-
Collective CLOAs pulong properly prepared with
highlights and agreements captured 4
hrs. after the activity
accepts survey returns of Collective CLOAs from survey returns of Collective CLOAs 100% of survey returns completely
GE contractors accepted from the GE contrators
within 60 min upon instruction
reviews survey returns of Collective survey returns of Collective CLOAs 100% of SRS reviewed based on
CLOAssubmitted by GES reviewed checklist as to correctness and
completeness within 5 working days
upon receipt
prepares transmittal of survey returns of transmittal letter or memorandum of 100% transmittal letter or
Collective CLOAs Collective CLOAs memorandum prepared with 3
revision within 4 hrs upon instruction
transmits survey returns of Collective CLOAs to transmittal of SRs on Collective CLOAs 100% of SRs with complete
DARRO attachments submitted to DARRO
within 3 working days after review
submits SR of Collective CLOAs to DENR LMS for SR of Collective CLOAs submitted or 100% of Quality SRs submitted or
IVAS transmitted to DENR transmitted properly to DENR with
complete supporting documents
within 2 working days after review
monitors status of verification and approval of SR status report of verification on 100% of status report of monitoring of
of Collective CLOAs at DENR Collective CLOAs SR at DENR prepared accurately within
8 hrs. after monitoring
monitors progress of transaction of Collective status report of transaction of 100% of status report on the progress
CLOAs at DENR Collective CLOAs of transaction at DENR prepared
accurately within 5 hrs. after
monitoring
receives ASP of Collective CLOAs from DENR LMS copy of ASP or NTDS of transaction of 100% of ASPs or NTDs recieved
Collective CLOAs received properly from DENR LMS with
complete supporting documnents
within 30 mins
prepares transmittal memo of ASPs or NTDs of transmittal memo of ASP or NTDS of 100% transmittal memo of ASPs or
transaction of Collective CLOAs to DARMO transaction of Collective CLOAs NTDs properly transmitted to DARMO
within 8 hrs. upon instruction