Professional Documents
Culture Documents
2
L Vs V 2s L V d2 V 2d
[
h fricción= f ×
D 2g
+Σ k
2g
+ f
D2 g ][
+Σ k
2g ]
3
LS =8 m 225 Gal x 3.785 L x 1 m x 1 min
;min 1Gal 1000 L 60 s
D s =4 ° cédula 40=102.3 mm
Q 0.014 m 3 /s
V s= = =17.05 m/s → velocidad de succión
A s 8.21× 103 m 2
π
A s= ¿
4
Cá lculo de N° Reynolds:
V s × D is
ℜs=
V
Donde V =viscosidad cinemática del fluido
ε acero =0.05 mm
ε =rugosidad absolutaε =0.0015 mm
0.25 0.25
f= 2
= 2
1 5.74 1 5.74
[ [
log + 0.4
3.7 ( D/ ε ) ℜ ]] [[
log
3.7( 102.3mm
0.0015 mm
+
( 134170)0.4
) ]
f s=0.016
V s 2 ( 1.706 m/ s )2
= =0.15 m
2 g 2(9.81 m/s 2)
(8 m)
h mayor (S)=0.016 (0.15 m)
(102.3× 10−3 m)
h mayor(s) =0.19 m
h menor(S )=(0.85)(0.15m)
h menor(S )=0.1275 m
Para la descarga:
LD=30m V D=Q / A D
DD=52.5mm
π
A D= (52.5 x 10−3 )=2.16 x 10−3 m 2
4
0.014 m 3 /s
Vd= =6.48 m/ s
2.16× 103 m2
V d2
=¿ ¿
2g
3
V d2 (6.48 m/ s)(52.5 ×1 0 m)
=2.14 m Red =
2g 6.3 ×1 06 m 2 / s
𝑓d= 0.025
(30 m)
h mayor =0.02 ×(2.14 m)
d
52.5 x 10−3
h mayor(d )=24.45 m
h menor=13.69(2.14 m )
h mayor(d )=29.29 m
h bomba=79.34 m