EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Receiving
Air-Conditioning Unit : Explosion Proof: for Onshore all Sizes and for
SAES-K-101
A1 Offshore less than 10 Tons is an RVL Equipment with 9COM #
Table-1
6000001881 and shall be in compliance with NFPA 70 requirements
Air Conditioning Unit; mini split less than 5.5 ton shall be in compliance
with AHRI-210/240, UL-1995 and EER values shall meet ASHRAE 90.1 SAES-K-101
A10
values latest edition. Table-1
9Com: 6000001826
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Visually inspect all incoming material /equipment for damage and for
conformance to all applicable requirements, including the Schedule “Q”
A12
CONTRACTOR’s inspection release, when applicable, with verified Para 3.3, Att. IV
Material Test Reports (MTR).
The tag or name plate shall be located such that the information is SAES-K-001
A15
visible and can be read after equipment installation. Para 4.8.1.2.2
SAES-K-001
Cooling coil (evaporator) number of rows per coil shall not exceed 10
A16 Para 4.8.4.7 &
rows and fin spacing shall not be closer than 15 fins per inch.
4.8.4.8
Casings shall include doors to provide maintenance and removal access SAES-K-001
A22
for all fans, motors, coils, filters, and humidifiers. Para. 4.8.8.7
SAES-K-001
A24 Casing filter mounts or filters shall have seals to prevent air bypass.
Para 4.8.8.8
SAES-K-001
A25 Pre-filters and final-filters shall be upstream of coils and fans
Para 4.8.15.6
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-K-001
A26 A corrosion resistant drain shall be provided under each evaporator coil.
Para 5.3.4.2 a
The evaporator drain pan shall have a trapped drain pipe attached to the SAES-K-001
A27
bottom or to the side of the drain pan, flushed with the bottom plate. Para 5.3.4.2 b
SAES-K-001
A28 Reciprocating compressors shall be vibration isolated from the unit
Para 4.8.14.2
AHUs with total supply air equal to or greater than 5,000 ft³/min
B
shall, in addition to the above requirements, have the following:
The entire AHU shall be minimum two inch, double wall construction.
Casing panels shall be fabricated with a minimum of G-90 galvanized SAES-K-001
B2
steel or aluminum with all necessary reinforcements to prevent pulsation Para 4.8.8.9 b
and bulging*
AHU panels shall have galvanized steel with pre-painted backed enamel SAES-K-001
B3
finish or aluminum exterior skin and a solid aluminum inner lining.* Para 4.8.8.9 d
SAES-K-001
B5 Casing panels shall be airtight without caulking.*
Para 4.8.8.9 d
SAES-K-001
B7 Casing shall completely enclose all AHU components
Para 4.8.8.9 e
The AHU shall have a structural steel base with cross members
adequate to support all AHU components. The unit floor shall consist of
SAES-K-001
B8 a minimum 18 gauge galvanized steel or 0.040" aluminum outer panel,
Para 4.8.8.9 f
three inches of glass fiber insulation and a 0.063" aluminum inner
panel*.
Drain pans shall extend completely under the coil sections and shall SAES-K-001
B9
have minimum 1-¼ inch threaded drain connections. Para 4.8.8.9 g
Drains pans shall be sealed, double wall steel construction with rigid SAES-K-001
B10
glass fiber insulation and Type 316 stainless steel inner pan*. Para 4.8.8.9 g
Verify that approved procedures for handling, storage and preservation Schedule “Q”
C1 lists all the required inspection schedules for maintaining the quality of Section 5 & 6, Att.
AHU IV
* Verification is required by checking the equipment submittal if verification is not possible by visual inspection
REMARKS:
REFERENCE DOCUMENTS:
1-Schedule "Q" -- Saudi Aramco Quality Requirements
2-SAES-K-001 -- Design and Installation of Heating, Ventilating and Air Conditioning Systems, 05 December 2012
3-SAES-K-101 -- Regulated Vendors List for Heating, Ventilating and Air Conditioning (HVAC) Equipment, 27 Feb 2013