09-MS For Ocef Relay Testing
09-MS For Ocef Relay Testing
OWNER/CLIENT
CONSULTANT
CONTRACTOR
Signature:
Date:
Signature:
Designation:
Date:
1|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC
CONTENTS
1.0 Purpose 03
2.0 Scope 03
3.0 References 03
4.0 Manpower 03
5.0 Procedure 03
8.0 Responsibilities 05
9.0 Emergency 06
10.0 Records 06
2|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC
1.0 Purpose
This method statement will give a brief step to be carried out for testing and commissioning
of OCEF relays.
2.0 Scope
This procedure describes the method to be adopted for:
Testing of over current earth fault relays
3.0 Reference
Approved schematic drawing
Project HSE Plan
Project Quality Plan
Tender Specification
4.0 Man power
a) Project Engineer (permit holder) - 01
b) Testing Engineer (DCRP) - 01
c) HSE Officer - 01
d) Technician - 01
5.0 Procedure
Ensure that all reference documents are available at site.
Ensure that valid permits are obtained from concerned authorities wherever
applicable.
Ensure only trained persons shall operate the power tools.
Ensure all concerned personals shall use PPE and all other items are required.
Ensure adequate lighting is provided in the working area at night time.
Ensure service area/work area openings are provided with barricade, tape and safety
nets.
6.0 Over current & E/F protection:
The approved settings are uploaded in the relay.
The output relays and opto inputs are configured as per scheme diagram.
The logic and LEDs are configured as per scheme requirement.
Measurements:
The voltage & current connections are made from the kit to test plug of the relay.
The kit is switched ON.
3|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC
4|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC
5|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC
Testing Engineer shall be responsible for the site testing activities and
implementation of all testing plans.
9.0 Emergency
In case of Emergency,
Stop the work.
Alert the nearby workers to reach to the nearest assembly point
Do not to get panic and do not run.
Inform the site HSE officer and other key personnel from the emergency contacts
numbers displayed in the site.
Call emergency services (9999) if required.
Supervisor shall make head count and report.
10.0 Records
SAT(Site acceptance test) reports
Quality Records
Inspection forms