You are on page 1of 1

Nigeria LNG Limited Sheet 1 of 1

Natural Gas Liquefaction Complex


Bonny Island, Nigeria
CONSTRUCTION FORM No. PR 808-11-M2B
QUALITY CONTROL SUBC. NO. ______________

COLD/SPECIAL SUPPORTS INSTALLATION


( MECHANICAL SUBCONTRACTOR )

LINE NO.: ______________________________________DRAWING NO.: ____________________________________________

LOCATION: _____________________________________AREA: ____________________________________________

SUPPORT NO. TYPE: SUPPORT NO. TYPE:


SUPPORT NO. TYPE: SUPPORT NO. TYPE:
SUPPORT NO. TYPE: SUPPORT NO. TYPE:
SUPPORT NO. TYPE: SUPPORT NO. TYPE:
SUPPORT NO. TYPE: SUPPORT NO. TYPE:
SUPPORT NO. TYPE: SUPPORT NO. TYPE:
SUPPORT NO. TYPE: SUPPORT NO. TYPE:
SUPPORT NO. TYPE: SUPPORT NO. TYPE:

ITEM SIGNATURE AND DATE

NO. DESCRIPTION
MECH. S/C CONTRACTOR COMPANY
(INSTALLATION OF LOWER PORTION OF COLD SUPPORT)

1. CORRECT AND FULL PAINTING SYSTEM APPLIED AT SUPPORT LOCATION

2. PIPE SURFACE DRY AND FREE FROM DIRT, OIL OR GREASE

3. LOWER PORTION OF HD SUPPORT DRY AND FREE OF DEFECTS

4. LOWER PORTION OF SUPPORT INSTALLED WITHOUT DAMAGE

5. LOWER PORTION OF SUPPORT INSTALLED AT CORRECT LOCATION

6. WEATHER PROTECTION PROPERLY INSTALLED

7. RELEASE FOR UPPER PORTION INSTALLATION ( BY Others )

NO. DESCRIPTION
MECH. S/C CONTRACTOR COMPANY
(INSTALLATION OF SPECIAL SUPPORT)

1. CORRECT AND FULL PAINTING SYSTEM APPLIED AT SUPPORT LOCATION

2. PIPE SURFACE DRY AND FREE FROM DIRT, OIL OR GREASE

3. SPECIAL SUPPORT FREE OF DEFECTS AND INSTALLED WITOUT DAMAGED

4. LOWER AND UPPER CRADLE PORTION INSTALLED ( WHERE REQUIRED )

5. RELEASED FOR INSTALLATION COMPLETION i.e. PIR FILLING AND MASTIC


PROTECTION

Remarks:
THE SUPPORTS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS & SPECIFICATIONS:

SIGNED : ____________________________ NAME:____________________________ DATE:_____________________


MECHANICAL SUBCONTRACTOR

SIGNED: _______________________________ NAME:_____________________________ DATE:_____________________


CONTRACTOR

SIGNED: _______________________________ NAME:______________________________ DATE: ____________________


COMPANY

JP 1000 NLG
Attachment PR808-11-M2B (10/03)
/conversion/tmp/scratch/488367755.doc

You might also like