FERRO-SCAN REPORT
REPORT ON REINFORCEMENT SCANNING OF
EXISTING BUILDING.
DATE:
Inspection Date : March 13, 2019
Submission Date : March 14, 2019
Supervised by:
Engr. Md. Abu Baker
B.Sc.in Engineering
MIEB: F-5097
LETTER OF DECLARATION
We do hereby declare that this report is prepared based on the scanning data from
different location in the structure as suggested by the engineer/consultant using Hilti
PS 200 under the guidance and supervision of us. We will be responsible for
rationality and verification of any data presented in this report based on scanning
only. While scanning and analyzing, civil engineering knowledge and judgment was
applied where necessary.
This report is prepared based on image scan and quick scan only.
Face-1 Face-2
Face-1 Face-2
Face-1 Face-2
Face-1 Face-2
Face-1 Face-2
Face-1 Face-2
Not available
Face-1 Face-2
Face-1 Face-2
Face-1 Face-2
Face-1 Face-2
Face-1 Face-2
12 Scan-02 (C3x) Column Face-1 4-20mm dia bar 18” has taken
Grid no. I/2 (30ʺx12ʺ) due to brick wall
Ground Floor Face-2 Not available
Face-1 Face-2
Not available