Professional Documents
Culture Documents
Appendix A
Appendix A
Chainage
Existing Rail
A B C
2
1 3
1. Position the crane at A and lift all the beams in span 1 and place in lay down area.
2. Position the crane at B and lift all the beams in span 2 and place in lay down area.
3. Position the crane at C and lift all the beams in span 3 and place in lay down area.
4. Hack off all the beams in the lay down area using hydraulic breaker and dispose off debris in suitable area.