Increasing

Chainage

Existing Rail

Lay Down Area

A B C

2
1 3

1. Position the crane at A and lift all the beams in span 1 and place in lay down area.

2. Position the crane at B and lift all the beams in span 2 and place in lay down area.

3. Position the crane at C and lift all the beams in span 3 and place in lay down area.

4. Hack off all the beams in the lay down area using hydraulic breaker and dispose off debris in suitable area.