Saudi Electricity Company

Shoaiba Power Plant


Annual inspection Check list 2016 – 2017.
Unit #

System: Air & Gas Equipment : Air & Gas Dampers KKS: Report No:

Act.
Inspection Description As Found As Left
No.
INSPECT DAMPER BODY/ CASING FOR DAMAGE
1
CORROSION OR MISSING PARTS
INSPECT DAMPER LINKAGE/LEVER FOR DAMAGE
2
CORROSION OR MISSING PARTS

3 INSPECT PACKING GLANDS

INSPECT DAMPER BLADES/FLAPS FOR DAMAGE


4
CORROSION OR MISSING PARTS

5 INSPECT DRIVE UNIT STUB SHAFT

6 INSPECT DRIVE UNIT BEARINGS

7 INSPECT DRIVE UNIT COUPLINGS

INSPECT DRIVE UNIT PNEUMATIC/ ELECTRIC


8
ACTUATOR
INSPECT DRIVE UNIT PNEUMATIC FITTINGS AND
9
ACCESSORIES

CONTRACTOR ( Babcock) SEC Representative/ HOD

NAME & POSITION APPROVED BY :

DATE : DATE:

SIGNATURE: SIGNATURE:

Page 1 of 2
Saudi Electricity Company
Shoaiba Power Plant
Annual inspection Check list 2016 – 2017.
Unit #

System: Air & Gas Equipment : Air & Gas Dampers KKS: Report No:

Act.
Inspection Description As Found As Left
No.
Form NO#SSP/TSD/101-B001

Page 2 of 2