PROJECT FACILITIES
1 Project Facilities
The Contractor shall construct the Project Facilities in accordance with the provisions
of this Agreement. Such Project Facilities shall include:
a) roadside furniture;
b) pedestrian facilities; and
c) Others to be specified
2 Description of Project Facilities
Each of the Project Facilities is described below showing:
(a) Toll Plaza - Nil
(b) Roadside Furniture
The roadside furniture shall include the provision of the;
i. Traffic Signs:
As stipulated in the Manual of Specifications and Standards.
ii. Pavement Markings:
As stipulated in the Manual of Specifications and Standards.
iii. LED Traffic Blinkers:
As stipulated in the Manual of Specifications and Standards.
iv. Crash barrier
The Contractor shall provide NJCB all along the elevated corridor.
v. MS Railing
As stipulated in the Manual of Specifications and Standards and Schedule B.
vi. Delineators
As stipulated in the Manual of Specifications and Standards.
vii. Boundary stones:
As stipulated in the Manual of Specifications and Standards.
viii. Hectometer / Kilometer stones:
As stipulated in the Manual of Specifications and Standards.
(c) Pedestrian Facilities
As stipulated in the Manual of Specifications and Standards..
Page C - 1
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.
(i) Others
1. Office Building
Permanent type (RCC Framed Structure) office building shall be established at the
following location.
S. No. Design Chainage (km) Area (in Sqm.)
NIL
2. Highway Lighting
Lighting shall be provided at the following locations:
Lighting of sufficient illumination shall be provided all along the median of
elevated corridor as well as under the elevated carriageway for existing
carriageway as per Schedule D (IRC: 84-2014).