SCHEDULE – A
(See Clause 10.1)
1. The Site
1.1 Site of the Four Lane project Highway shall include the existing land, buildings,
structures and road works as described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works, trees
and any other immovable property on, or attached to, the Site shall be prepared
jointly by the Independent Engineer and the Concessionaire, and such inventory
shall form part of the memorandum referred to in Clause 10.3.1 of this Agreement.
1.3 Additional land required for Toll Plazas, Truck Lay bye, Traffic Aid Posts, Medical Aid
Posts and vehicle rescue posts or for construction of works specified in the Change
of Scope Order issued under Clause 16.2.3 of this Agreement shall be acquired in
accordance with the provisions of Clause 10.3.6 of this Agreement. Upon
acquisition, such land shall form part of the Site and vest in the Authority.
6 The chainages given in this document are in km unless otherwise specified, all other
dimensions are in meters.
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A– 1
National Highways Authority of India Schedule – A
Annex – I
(Schedule – A)
Site for Four Laning
1. Site
The site of the Four Laning of Project Highways comprises the section of National
Highway 8E commencing from Km 53.585 (Design km 54.990) to Km 100.100 (Design
km 100.450) i.e Talaja to Mahuva section in the State of Gujarat. The land, carriageway
and structures comprising the Site are described below:
2. Land
3. Carriageway
The present carriageway of Project Highways is 2-lane (flexible pavement) with paved
shoulder for most of the project stretch.
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A– 2
National Highways Authority of India Schedule – A
Span Total
Name / Type of Footpath
SI arrangeme Length Type of Type of Carriage Total
Bridge/ location Superstruc provided
No nt F.F of Substructure Foundation way Width Deckwidth
str no Existing ture or
Exp Jt to Dirt wall (m) (m)
Ch. not
Exp Jt (m) (m)
Rubble
1 71/3 70.994 10X8 80 R.c.c slab open 7.3 NO 7.9
masonary
Type Wall type pier foundation
Rubble
2 * 86.633 10X7.5 75 R.c.c slab open 7.8 NO 8.8
masonary
Type Wall type pier foundation
3 * 88.937 8X11.8 94.4 R.c.c slab R.c.c wall open 7.6 NO 8.4
Type Type pier foundation
R.c.c T-
6X12 + Rubble
4 95/1 94.38 120.6 Beam Well 6.9 NO 7.9
3X16.20 masonary
Girder
Type Wall type pier foundation
4. Major Bridges
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design Chainage Km ) in the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity)mode.
A– 3
National Highways Authority of India Schedule – A
Type of Structure
Chainage No. of Width (in
Sl. No. Sub Super
(in Km) Foundation Spans m)
structure Structure
NIL
Type of Structure
Chainage No. of Width (in
Sl. No. Sub Super
(in Km) Foundation Spans m)
structure Structure
NIL
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A– 4
National Highways Authority of India Schedule – A
7. Minor Bridges
The site includes the following minor bridges:
Name /
Span Total Footpath
SI Location Bridge / Type of Type of Type of Total
arrangement Length Carriageway provided
No Existing structure Superstructure Substructure Foundation Deck
Exp Jt to Exp Jt F.F of Dirt Width (m) or
Chainage no Width (m)
(m) wall (m) not
(Km)
1 57.604 58/1 3X3.5 10.5 R.c.c slab R.c.c wall Open 11.2 No 12
Type Type pier
2 60.455 61/1 4X6 24 R.c.c slab R.c.c wall Open 7.3 No 8.1
Type Type pier
3 61.366 62/1 3X5.5 16.5 R.c.c slab R.c.c wall Open 7.1 No 7.8
Type Type pier
4 62.788 63/2 2X3.2 6.4 R.c.c slab R.c.c Abutment Open 11.5 No 12.5
Type
5 66.96 67/1 3X2.7 8.1 R.c.c slab R.c.c wall Open 11.3 No 12.1
Type Type pier
6 67.446 * 3X4.1 12.3 R.c.c slab R.c.c wall Open 9.4 No 10.4
Type Type pier
7 67.615 * 3X11.4 34.2 R.c.c slab R.c.c wall Open 10.9 No 11.9
Type Type pier
Rubble
8 67.922 * 2X4.1 8.2 R.c.c slab masonary Open 9.3 No 10.3
Type Wall type pier
Rubble
R.c.c slab masonary
9 70.283 71/1 3X7.3 21.9 Type Wall type pier Open 7.2 No 7.9
10 74.651 * 3X11.2 33.6 R.c.c slab R.c.c wall Open 8.2 No 9.2
Type Type pier
11 80.646 81/2 4X7 28 R.c.c slab R.c.c wall Open 7.2 No 7.9
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design Chainage Km ) in the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity)mode.
A– 5
National Highways Authority of India Schedule – A
Name /
Span Total Footpath
SI Location Bridge / Type of Type of Type of Total
arrangement Length Carriageway provided
No Existing structure Superstructure Substructure Foundation Deck
Exp Jt to Exp Jt F.F of Dirt Width (m) or
Chainage no Width (m)
(m) wall (m) not
(Km)
Type Type pier
12 82.99 83/1 2X6 12 R.c.c slab R.c.c wall Open 11.1 No 12.0
Type Type pier
13 83.797 84/2 3X3.5 10.5 R.c.c slab R.c.c wall Open 11.5 No 12.5
Type Type pier
Rubble
14 89.62 * 2X7.3 14.6 R.c.c slab masonary Open 7.5 No 8.1
Type Wall type pier
15 93.15 94/2 1X6 6 R.c.c slab R.c.c Abutment Open 11 No 12.0
Type
16 98.691 99/3 1X6.2 6.2 R.c.c slab R.c.c Abutment Open 11.2 No 12
Type
*Structure is on existing road whereas, bypass/realignment is proposed in this section.
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design Chainage Km ) in the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity)mode.
A– 6
National Highways Authority of India Schedule – A
8. Culverts
Existing Chainage
Sr. No Type Length (m)
(Km)
Slab Culverts
1 54.467 Slab Culvert 1x1.2
2 55.322 Slab Culvert 1x 1.8
3 56.446 Slab Culvert 1x 1.7
4 62.040 Slab Culvert 1x 3.0
5 68.454 Slab Culvert 1x 1.5
6 68.885 Slab Culvert 2x 2.7
7 70.473 Slab Culvert 1x 4.1
8 72.186 Slab Culvert 2x 3.0
9 73.450 Slab Culvert 1x 2.9
10* 73.966 Slab Culvert 1x 2.5
11 80.340 Slab Culvert 2x 2.9
12 81.113 Slab Culvert 2x 3.0
13 81.581 Slab Culvert 2x 1.6
14* 89.800 Slab Culvert 1x 3.3
15 92.046 Slab Culvert 1x 5.0
16 93.063 Slab Culvert 1x 3.0
17* 99.315 Slab Culvert 1x 4.5
Pipe Culverts
1 56.932 Pipe Culvert 2x 1.2
2 57.640 Pipe Culvert 1x 0.9
3 63.527 Pipe Culvert 1x 0.9
4 64.040 Pipe Culvert 1x 0.9
5 64.483 Pipe Culvert 1x 0.9
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design Chainage Km ) in the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity)mode.
A– 7
National Highways Authority of India Schedule – A
Existing Chainage
Sr. No Type Length (m)
(Km)
6 65.439 Pipe Culvert 1x 0.9
7* 67.675 Pipe Culvert 2x 0.9
8* 67.908 Pipe Culvert 5x 0.9
9 68.317 Pipe Culvert 3x 0.9
10 69.242 Pipe Culvert 1x 0.9
11* 69.378 Pipe Culvert 1x 0.9
12* 69.632 Pipe Culvert 1x 0.9
13* 69.861 Pipe Culvert 2x 0.9
14 72.515 Pipe Culvert 1x 0.9
15* 73.112 Pipe Culvert 2x 0.9
16 73.615 Pipe Culvert 3x 0.9
17* 73.842 Pipe Culvert 2x 0.9
18* 74.895 Pipe Culvert 2x 0.9
19 76.137 Pipe Culvert 2x 0.9
20 76.525 Pipe Culvert 2x 0.9
21 84.550 Pipe Culvert 2x 0.9
22* 86.015 Pipe Culvert 1x 1.2
23* 87.883 Pipe Culvert 4x 0.9
24* 89.359 Pipe Culvert 3x 0.9
25* 91.142 Pipe Culvert 2x 0.9
26* 91.221 Pipe Culvert 1x 0.9
27* 91.301 Pipe Culvert 1x 0.9
28* 91.457 Pipe Culvert 3x 0.9
29 92.223 Pipe Culvert 2x 0.9
30 92.697 Pipe Culvert 2x 1.2
31 92.883 Pipe Culvert 2x 0.9
32 93.995 Pipe Culvert 2x 0.9
33 94.799 Pipe Culvert 3x 0.9
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design Chainage Km ) in the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity)mode.
A– 8
National Highways Authority of India Schedule – A
Existing Chainage
Sr. No Type Length (m)
(Km)
34 95.152 Pipe Culvert 1x 0.9
35 95.172 Pipe Culvert 1x 0.9
36 95.669 Pipe Culvert 3x 0.9
37 96.827 Pipe Culvert 1x 1.2
38 96.935 Pipe Culvert 1x 1.2
39 97.244 Pipe Culvert 3x 0.9
40 98.386 Pipe Culvert 1x 0.9
41 98.574 Pipe Culvert 4x 0.9
*Structure is on existing road whereas, bypass/realignment is proposed in this section.
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design Chainage Km ) in the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity)mode.
A– 9
National Highways Authority of India Schedule – A
The total number of bus shelters and truck lay byes on the Project highway is noted
below:
The Site includes the following permanent bridge/ bypass/ tunnel which were constructed
at the cost noted below:
NIL
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A – 10
National Highways Authority of India Schedule – A
Crossing
Sr. Existing Design Carriageway Category of
Side
No. Chainage (Km) Chainage Width (m) Road
(LHS/RHS)
1 80.367 81.717 Both 7.0 MDR
2 95.604 96.179 Both 7.0 SH
3* 99.300 99.760 Both 7.0 NH
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A – 12
National Highways Authority of India Schedule – A
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A – 13
National Highways Authority of India Schedule – A
17. Bypasses
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A – 14
National Highways Authority of India Schedule – A
The Feasibility report of Authority provided in soft copy is for the purpose of reference
only. The Authority makes no representation whatsoever, express, implicit or otherwise,
regarding the accuracy, adequacy, correctness, reliability and/or completeness of any
assessment, assumptions, statement or information provided by it and the
Concessionaire confirms that it shall have no claim whatsoever against the Authority in
this regard.
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A – 15
National Highways Authority of India Schedule – A
Appendix A1
Four Laning of Talaja -Mahuva Section of NH – 8E from Km 53.585 (Design Chainage Km 54.990) to Km 100.100 (Design
Chainage Km ) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity)mode.
A – 16