ENEREFF ENGINEERS PVT. LTD.
REVISIONS
SOOT BLOWERS
SOOT BLOWERS
CHD
3-12-007
SPECIFICATION NO.
0
APPROVALS
REV.
SHT 1 OF 7
This drawing and the design it covers are the property of Enereff Engineers Pvt. Ltd. They are merely loaned and on the borrower’s express agreement that they will not be
LIST OF CONTENTS
reproduced, copied, loaned, exhibited, nor used except in the limited way and private use permitted by any written consent given by lender to the borrower.
1.0 SCOPE 3
7.0 GUARANTEE 6
SHT 2 OF 7
ENEREFF ENGINEERS PVT. LTD. GENERAL SPECIFICATION FOR SPECIFICATION NO. REV.
NEW DELHI SOOT BLOWERS
3-12-007 0
This drawing and the design it covers are the property of Enereff Engineers Pvt. Ltd. They are merely loaned and on the borrower’s express agreement that they will not be 1.0 SCOPE
1.1 This specification covers the requirements of soot blowers which are to be installed in the
convection section/ APH system of process heaters/ boilers in order to have these convective
surfaces clean of all soot/ solid particles to be able to achieve adequate heat transfer during
operation of the system.
1.2 This specification provides the minimum requirements only. This should be read alongwith the
reproduced, copied, loaned, exhibited, nor used except in the limited way and private use permitted by any written consent given by lender to the borrower.
SHT 3 OF 7
ENEREFF ENGINEERS PVT. LTD. GENERAL SPECIFICATION FOR SPECIFICATION NO. REV.
NEW DELHI SOOT BLOWERS
3-12-007 0
2.9 Supplier should ensure that there is no erosion of the tubes on account of impingement of the
steam jet issuing from the soot blowers. However the flue gas carried particulates which are
This drawing and the design it covers are the property of Enereff Engineers Pvt. Ltd. They are merely loaned and on the borrower’s express agreement that they will not be
deposited on the tube surfaces need to be periodically removed with sufficient force/ energy to
remove them. Manufacturer should indicate the frequency of cleaning though the commonly
recommended frequency is once every shift of 8 hours.
2.10 Wall boxes offered should be suitable for the negative draft values indicated for the convection
reproduced, copied, loaned, exhibited, nor used except in the limited way and private use permitted by any written consent given by lender to the borrower.
SHT 4 OF 7
ENEREFF ENGINEERS PVT. LTD. GENERAL SPECIFICATION FOR SPECIFICATION NO. REV.
NEW DELHI SOOT BLOWERS 3-12-007 0
4.3.4 An interlock to prevent soot blower operation until the piping has reached preset temperature,
with a lamp to show “drainage complete”.
This drawing and the design it covers are the property of Enereff Engineers Pvt. Ltd. They are merely loaned and on the borrower’s express agreement that they will not be
4.3.5 An alarm if the soot blower has not retracted within the specified time. In such an eventuality,
the next soot blower should not start until this stuck blower has been retracted.
4.3.6 Retraction of the soot blower on low steam pressure or motor overload condition.
4.3.7 Retraction of the soot blower in case of low steam flow rate.
reproduced, copied, loaned, exhibited, nor used except in the limited way and private use permitted by any written consent given by lender to the borrower.
4.3.8 Facility to operate any soot blower from the sequential panel or push button local to the blowers.
4.3.9 Facility to annunciate faulty conditions through constantly glowing lamps.
4.4 Provision is to be kept in the panel to bypass any of the interlocks mentioned above.
4.5 Detailed requirements related to panel and other electricals shall be specified in a separate
specification enclosed with the requisition - in case these are required.
SHT 5 OF 7
ENEREFF ENGINEERS PVT. LTD. GENERAL SPECIFICATION FOR SPECIFICATION NO. REV.
NEW DELHI SOOT BLOWERS
3-12-007 0
This drawing and the design it covers are the property of Enereff Engineers Pvt. Ltd. They are merely loaned and on the borrower’s express agreement that they will not be 6.4 Documents after Order Placement
6 sets of following drawings/ documents shall be submitted after order placement for
ENEREFF’s review and approval :
! General Arrangement Drawing and Details complete with parts list, material list, location/
orientation of blowers; weight of blowers; supporting/ mounting details; movements, forces
and moments that may be exerted on steam/ air nozzles by external piping
reproduced, copied, loaned, exhibited, nor used except in the limited way and private use permitted by any written consent given by lender to the borrower.
8.0 GUARANTEE
8.1 Vendor shall guarantee the soot blowers for design, material and intended service. The Soot
blowers should clean the tube surfaces for the given tube arrangement, fuel fired, steam/ air
conditions etc. as specified in the enquiry.
8.2 In case of failure in performance of the Soot blowers, vendor shall, at his own cost rectify the
faults without any delay. The guarantee shall be valid for a period of 12 months from operation
or 18 months from despatch whichever is later. However in case the enquiry calls for a more
stringent guarantee requirements, the same shall govern.
SHT 6 OF 7
ENEREFF ENGINEERS PVT. LTD. GENERAL SPECIFICATION FOR SPECIFICATION NO. REV.
NEW DELHI SOOT BLOWERS 3-12-007 0
ANNEXURE - I
This drawing and the design it covers are the property of Enereff Engineers Pvt. Ltd. They are merely loaned and on the borrower’s express agreement that they will not be
i. Model No.
ii. Stroke Length & Dead Travel
reproduced, copied, loaned, exhibited, nor used except in the limited way and private use permitted by any written consent given by lender to the borrower.
SHT 7 OF 7
ENEREFF ENGINEERS PVT. LTD. GENERAL SPECIFICATION FOR SPECIFICATION NO. REV.
NEW DELHI SOOT BLOWERS 3-12-007 0